ML20211M789: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:b-Document Transmittat #: 70855 Date: 10/6/97 Tc:
b-Document Transmittat #: 70855                               Date: 10/6/97 Tc:     NRC (DC DESK)                                       MAC: N/A Destination:                                              
NRC (DC DESK)
MAC: N/A Destination:


== Description:==
==
 
Description:==
Copy       Copy Totals Document:                       Revision:           Comment:                   #    INFO CNTL. MSTR AR0603                           17                                               24     1     0     0 AR0952                           08                                               24     1     0     0 4
Copy Copy Totals Document:
Revision:
Comment:
INFO CNTL. MSTR AR0603 17 24 1
0 0
AR0952 08 24 1
0 0
4 a0\\
Instructions to the Addressee:
Instructions to the Addressee:
a0\  ;
Please verify the document (s) received agrees with the above information.
Please verify the document (s) received agrees with the above information.
Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.
Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.
The signature indic.A dnowledgment of receipt of the above thcument(s) and that documents have been updated. Retum o'.etes 'nd dated transmittal to Document Cantrol within 15 working days of transmittal date to mail code:
The signature indic.A dnowledgment of receipt of the above thcument(s) and that documents have been updated. Retum o'.etes 'nd dated transmittal to Document Cantrol within 15 working days of transmittal date to mail code:
Florkla Power Corporaten
!!b h
                                                                                            !!b   h         l Document Control, NA1C Crystal RNer Energy Complex
l Florkla Power Corporaten Document Control, NA1C Crystal RNer Energy Complex 1s760 W. Power Une St.
                              ^
1 t %q b, q 1.
1s760 W. Power Une St.
^
1
. d>
                      . t d>%q b, L1  q 1.           Crystal RNer, FL 344284708 Signature of Addressee:         , , . .                                    Date:
L1 Crystal RNer, FL 344284708 Signature of Addressee:
1 9710150150 971006 PDR       ADOCK 05000302 F                               PDR
Date:
                                                      . _ _              _ _ _ _ _ _}}
1 9710150150 971006 PDR ADOCK 05000302 F
PDR
_ _ _ _ _ _}}

Latest revision as of 21:44, 5 December 2024

Forwards Rev 8 to AR-952, Wdb Annunciator Response & Rev 17 to AR-603, Tgf O Annunciator Response
ML20211M789
Person / Time
Site: Crystal River 
Issue date: 10/06/1997
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211M795 List:
References
NUDOCS 9710150150
Download: ML20211M789 (1)


Text

b-Document Transmittat #: 70855 Date: 10/6/97 Tc:

NRC (DC DESK)

MAC: N/A Destination:

==

Description:==

Copy Copy Totals Document:

Revision:

Comment:

INFO CNTL. MSTR AR0603 17 24 1

0 0

AR0952 08 24 1

0 0

4 a0\\

Instructions to the Addressee:

Please verify the document (s) received agrees with the above information.

Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.

The signature indic.A dnowledgment of receipt of the above thcument(s) and that documents have been updated. Retum o'.etes 'nd dated transmittal to Document Cantrol within 15 working days of transmittal date to mail code:

!!b h

l Florkla Power Corporaten Document Control, NA1C Crystal RNer Energy Complex 1s760 W. Power Une St.

1 t %q b, q 1.

^

. d>

L1 Crystal RNer, FL 344284708 Signature of Addressee:

Date:

1 9710150150 971006 PDR ADOCK 05000302 F

PDR

_ _ _ _ _ _