                                                                                    FEB 191987
FEB 191987
        Docket No.                                     50-293
Docket No.
        Boston Edison Company M/C Nuclear
50-293
        ATTN: Mr. James M. Lydon
Boston Edison Company M/C Nuclear
                Chief Operating Officer
ATTN: Mr. James M. Lydon
        800 Boylston Street
Chief Operating Officer
        Boston, Massachusetts 02199
800 Boylston Street
        Gentlemen:
Boston, Massachusetts 02199
        Subject:                       Inspection No. 50-293/87-05
Gentlemen:
        This refers to the routine safety inspection conducted by Mr. R. A. McBrearty
Subject:
        of this office on January 12-16, 1987 at the Pilgrim Nuclear Power Station of
Inspection No. 50-293/87-05
        activities authorized by NRC License No. OPR-35 and to the discussions of our
This refers to the routine safety inspection conducted by Mr. R. A. McBrearty
        findings held by Mr. McBrearty with Mr. S. Hudson of your staff at the conclu-
of this office on January 12-16, 1987 at the Pilgrim Nuclear Power Station of
        sion of the inspection.
activities authorized by NRC License No. OPR-35 and to the discussions of our
        Areas examined during this inspection are described in the NRC Region I
findings held by Mr. McBrearty with Mr. S. Hudson of your staff at the conclu-
        Inspection Report which is enclosed with this letter. Within these areas, the
sion of the inspection.
        inspection consisted of selective examinations of procedures and representative
Areas examined during this inspection are described in the NRC Region I
        records, interviews with personnel, and observations by the inspector.
Inspection Report which is enclosed with this letter. Within these areas, the
        Within the scope of this inspection, no violations were observed.
inspection consisted of selective examinations of procedures and representative
        No reply to this letter is required.                                   Your cooperation with us in this matter
records, interviews with personnel, and observations by the inspector.
        is appreciated.
Within the scope of this inspection, no violations were observed.
                                                                                        Sincerely,
No reply to this letter is required.
                                                                                    Original SICnCd EY *
Your cooperation with us in this matter
                                                                                      Clitterd J. .''Icrson
is appreciated.
                                                                                        Stewart D. Ebneter, Director
Sincerely,
                                                                                        Division of Reactor Safety
Original SICnCd EY *
        Enclosure: NRC Region I Inspection Report No. 50-293/87-05
Clitterd J. .''Icrson
        8703020450 070219
Stewart D. Ebneter, Director
        PDR   ADOCK 05000293
Division of Reactor Safety
                                                                PDR
Enclosure: NRC Region I Inspection Report No. 50-293/87-05
                                                                                                                    )'lg [)
) g [)
        O
'l
                                                                                                                        '\
8703020450 070219
                                                                    OFFICIAL RECORD COPY           IR PILGRIM 87-05 - 0001.0.0
PDR
                                                                                                  C2/09/87
ADOCK 05000293
  e -.                                                                             _ . . . . ..
O
PDR
'\\
OFFICIAL RECORD COPY
IR PILGRIM 87-05 - 0001.0.0
C2/09/87
e -.
_ . . . .
..


                                                                                    \
\\
                                                                                    l
l
.
.
                                                                                    1
.
.
    Boston Edison Company M/C Nuclear ~ 2                                           I
Boston Edison Company M/C Nuclear ~ 2
    cc w/ encl:
cc w/ encl:
    L. Oxsen, Vice President, Nuclear Operations
L. Oxsen, Vice President, Nuclear Operations
    A. E. Pedersen, Station Manager
A. E. Pedersen, Station Manager
    Paul Levy, Chairman, Department of Public Utilities
Paul Levy, Chairman, Department of Public Utilities
    Edward R. MacCormack, Senior Regulatory Affairs and Program Engineer
Edward R. MacCormack, Senior Regulatory Affairs and Program Engineer
    Chairman, Board of Selectmen
Chairman, Board of Selectmen
    Plymouth Civil Defense Director
Plymouth Civil Defense Director
    J. D. Keyes
J. D. Keyes
    The Honorable E. J. Markey
The Honorable E. J. Markey
    Senator Edward P. Kirby
Senator Edward P. Kirby
    The Honorable Peter V. Forman
The Honorable Peter V. Forman
    Sharon Pollard
Sharon Pollard
    Public Document Room (PDR)
Public Document Room (PDR)
    local Public Document Room (LPDR)
local Public Document Room (LPDR)
    Nuclear Safety Information Center (NSIC)
Nuclear Safety Information Center (NSIC)
    NRC Resident Inspector
NRC Resident Inspector
    Commonwealth of Massachusetts (2)
Commonwealth of Massachusetts (2)
    bcc w/ encl:
bcc w/ encl:
    Region I Docket Room (with concurrences)
Region I Docket Room (with concurrences)
    Management Assistant, DRMA (w/o encl)
Management Assistant, DRMA (w/o encl)
    Section Chief, DRP
Section Chief, DRP
    W. Raymond, SRI, Vermont Yankee
W. Raymond, SRI, Vermont Yankee
    T. Shedlosky, SRI, Millstone 1&2
T. Shedlosky, SRI, Millstone 1&2
    H. Eichenholz, SRI, Yankee
H. Eichenholz, SRI, Yankee
    P. Leech, LPM, NRR
P. Leech, LPM, NRR
    PA0 (2) SALP Reports Only
PA0 (2) SALP Reports Only
    Robert J. Bores, DRSS
Robert J. Bores, DRSS
    RI:DRS               RI:DRS               RI:DRS
RI:DRS
  fMcBrearty/fi         - Strosnider           Durr
RI:DRS
    02/G /87             02/,1 /87             02/IF/87
RI:DRS
                                0FFICIAL RECORD COPY     IR PILGRIM 87-05 - 0002.0.0
fMcBrearty/fi
                                                        02/09/87
- Strosnider
Durr
02/G /87
02/,1 /87
02/IF/87
0FFICIAL RECORD COPY
IR PILGRIM 87-05 - 0002.0.0
02/09/87
}}
}}

Latest revision as of 21:19, 5 December 2024

Forwards Safety Insp Rept 50-293/87-05 on 870112-16.No Violation Noted
ML20211P948
Person / Time
Site: Pilgrim
Issue date: 02/19/1987
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lydon J
BOSTON EDISON CO.
Shared Package
ML20211P952 List:
References
NUDOCS 8703020458
Download: ML20211P948 (2)


See also: IR 05000293/1987005

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

!

i .

i

.

b

FEB 191987

Docket No.

50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. James M. Lydon

Chief Operating Officer

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection No. 50-293/87-05

This refers to the routine safety inspection conducted by Mr. R. A. McBrearty

of this office on January 12-16, 1987 at the Pilgrim Nuclear Power Station of

activities authorized by NRC License No. OPR-35 and to the discussions of our

findings held by Mr. McBrearty with Mr. S. Hudson of your staff at the conclu-

sion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

Original SICnCd EY *

Clitterd J. .Icrson

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-293/87-05

) g [)

'l

8703020450 070219

PDR

ADOCK 05000293

O

PDR

'\\

OFFICIAL RECORD COPY

IR PILGRIM 87-05 - 0001.0.0

C2/09/87

e -.

_ . . . .

..

\\

l

.

.

Boston Edison Company M/C Nuclear ~ 2

cc w/ encl:

L. Oxsen, Vice President, Nuclear Operations

A. E. Pedersen, Station Manager

Paul Levy, Chairman, Department of Public Utilities

Edward R. MacCormack, Senior Regulatory Affairs and Program Engineer

Chairman, Board of Selectmen

Plymouth Civil Defense Director

J. D. Keyes

The Honorable E. J. Markey

Senator Edward P. Kirby

The Honorable Peter V. Forman

Sharon Pollard

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

W. Raymond, SRI, Vermont Yankee

T. Shedlosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

PA0 (2) SALP Reports Only

Robert J. Bores, DRSS

RI:DRS

RI:DRS

RI:DRS

fMcBrearty/fi

- Strosnider

Durr

02/G /87

02/,1 /87

02/IF/87

0FFICIAL RECORD COPY

IR PILGRIM 87-05 - 0002.0.0

02/09/87