ML20212E158: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ -                                                   _____
{{#Wiki_filter:- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
        o         o
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ -
                                                                                                                                                                                            DEC 2 91988
_____
                    Docket No. 50-456
o
                    Docket No. 50-457
o
                    Comonwealth Edison Company
DEC 2 91988
                    ATTN: Mr. Cordell Reed
Docket No. 50-456
                                Vice President
Docket No. 50-457
                    Post Office Box 767
Comonwealth Edison Company
                    Chicago, IL 60690
ATTN: Mr. Cordell Reed
                    Gentlemen:
Vice President
                    This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,
Post Office Box 767
                    W. J. Kropp, T. E. Taylor and M. J. Farber of this office on October 24
Chicago, IL 60690
                    through December 18, 1986, of activities at the Braidwood Station, Units 1
Gentlemen:
                    and 2, authorized by NRC Operating License No. NPF-59 and Construction Permit
This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,
                    No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace and
W. J. Kropp, T. E. Taylor and M. J. Farber of this office on October 24
                    others of your staff at the conclusion of the inspection.
through December 18, 1986, of activities at the Braidwood Station, Units 1
                    The enclosed copy of our inspection report identifies areas examined during
and 2, authorized by NRC Operating License No. NPF-59 and Construction Permit
                    the inspection. Within these areas, the inspection consisted of a selective
No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace and
                    examination of procedures and representative records, observations, and
others of your staff at the conclusion of the inspection.
                    interviews with personnel.
The enclosed copy of our inspection report identifies areas examined during
                    During this inspection, certain of your activities appeared to be in violation
the inspection.
                    of NRC requirements, as specified in the enclosed Notice.                                                                                                                                         A written response           ;
Within these areas, the inspection consisted of a selective
                    is required.
examination of procedures and representative records, observations, and
                    In accordance with 10 CFR 2.790 of the Commission's regulations a copy of
interviews with personnel.
                    thisletter,theenclosures,andyourresponsetothisletterwIllbeplaced
During this inspection, certain of your activities appeared to be in violation
                    in the NRC Public Document Room.
of NRC requirements, as specified in the enclosed Notice.
                    We will gladly discuss any questions you have concerning this inspection.
A written response
                                                                                                                                                                                                Sincerely,
;
                    NO                                                                                                             k                                                           W. S. Little, Director
is required.
                    0                                                                                                                                                                           BraidwoodProject
In accordance with 10 CFR 2.790 of the Commission's regulations a copy of
                    Enclosures:
thisletter,theenclosures,andyourresponsetothisletterwIllbeplaced
                    1.     Notice of Violation
in the NRC Public Document Room.
                    2.     Inspection Report
We will gladly discuss any questions you have concerning this inspection.
                              No. 50-456/86063(DRP);
Sincerely,
                              No. 50-457/86044(DRP)
NO
                    See Attached DistrSutton
k
                          Q
W. S. Little, Director
                                                                                                                                                                                          r
0
                    t*Mmnj pe1
BraidwoodProject
                        1    /                                                                                                                                                            e
Enclosures:
                                                                                    a/g                                                                                   rth,a                                                         ' i
1.
                                                                                                                                                                                                                                    . [ E o/
Notice of Violation
2.
Inspection Report
No. 50-456/86063(DRP);
No. 50-457/86044(DRP)
See Attached DistrSutton
Q
r
1
/
e
t*Mmnj
pe1
a/g
rth,a
. [ E o/
' i


  F
F
        , >
>
  ,
,
            Commonwealth Edison Company         2
,
                                                  DEC 2 91986
DEC 2 91986
    ,
Commonwealth Edison Company
            Distribution
2
            cc w/ enclosures:
,
            D. L. Farrar, Director
Distribution
              of Nuclear Licensing
cc w/ enclosures:
          M. Wallace, Project Manager
D. L. Farrar, Director
          D. Shamblin, Construction
of Nuclear Licensing
              Superintendent               .
M. Wallace, Project Manager
            E. E. Fitzpatrick, Station
D. Shamblin, Construction
              Manager
Superintendent
          P. L. Barnes, Regulatory
.
              Assurance Supervisor
E. E. Fitzpatrick, Station
          DCS/RSB (RIDS)
Manager
            Licensing Fee Management Branch
P. L. Barnes, Regulatory
          Resident Inspector, RIII
Assurance Supervisor
              Braidwood
DCS/RSB (RIDS)
          Resident Inspector, RIII Byron
Licensing Fee Management Branch
          Phyllis Dunton, Attorney
Resident Inspector, RIII
              General's Office, Environmental
Braidwood
              Control Division
Resident Inspector, RIII Byron
          D. W. Cassel, Jr. , Esq.
Phyllis Dunton, Attorney
          J. W. McCaffrey, Chief, Public
General's Office, Environmental
              utilities Division
Control Division
          H. S. Taylor, Quality Assurance
D. W. Cassel, Jr. , Esq.
              Division
J. W. McCaffrey, Chief, Public
          E. Chan, OGC
utilities Division
          J. Moore, DGC
H. S. Taylor, Quality Assurance
          G. Berry, OGC
Division
          J. Stevens, NRR
E. Chan, OGC
          The Honorable Herbert Grossman, ASLB
J. Moore, DGC
          The Honorable A. Dixon Callihan, ASLB
G. Berry, OGC
          The Honorable Richard F. Cole, ASLB
J. Stevens, NRR
      i
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
i
l
l
.
.
.
.
.
.
}}
}}

Latest revision as of 06:31, 4 December 2024

Forwards Safety Insp Repts 50-456/86-63 & 50-457/86-44 on 861020-1218 & Notice of Violation
ML20212E158
Person / Time
Site: Braidwood  
Issue date: 12/29/1986
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212E162 List:
References
NUDOCS 8701050265
Download: ML20212E158 (2)


See also: IR 05000456/1986063

Text

- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ -

_____

o

o

DEC 2 91988

Docket No. 50-456

Docket No. 50-457

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,

W. J. Kropp, T. E. Taylor and M. J. Farber of this office on October 24

through December 18, 1986, of activities at the Braidwood Station, Units 1

and 2, authorized by NRC Operating License No. NPF-59 and Construction Permit

No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice.

A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations a copy of

thisletter,theenclosures,andyourresponsetothisletterwIllbeplaced

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

NO

k

W. S. Little, Director

0

BraidwoodProject

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-456/86063(DRP);

No. 50-457/86044(DRP)

See Attached DistrSutton

Q

r

1

/

e

t*Mmnj

pe1

a/g

rth,a

. [ E o/

' i

F

>

,

,

DEC 2 91986

Commonwealth Edison Company

2

,

Distribution

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

.

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, DGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

i

l

.

.

.

.

.

.