ML20212E158

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-63 & 50-457/86-44 on 861020-1218 & Notice of Violation
ML20212E158
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/29/1986
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212E162 List:
References
NUDOCS 8701050265
Download: ML20212E158 (2)


See also: IR 05000456/1986063

Text

- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _____

o o

DEC 2 91988

Docket No. 50-456

Docket No. 50-457

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,

W. J. Kropp, T. E. Taylor and M. J. Farber of this office on October 24

through December 18, 1986, of activities at the Braidwood Station, Units 1

and 2, authorized by NRC Operating License No. NPF-59 and Construction Permit

No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response  ;

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations a copy of

thisletter,theenclosures,andyourresponsetothisletterwIllbeplaced

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

NO k W. S. Little, Director

0 BraidwoodProject

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-456/86063(DRP);

No. 50-457/86044(DRP)

See Attached DistrSutton

Q

r

t*Mmnj pe1

1 / e

a/g rth,a ' i

. [ E o/

F

, >

,

Commonwealth Edison Company 2

DEC 2 91986

,

Distribution

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent .

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, DGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

i

l