ML20212E158
| ML20212E158 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/29/1986 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20212E162 | List: |
| References | |
| NUDOCS 8701050265 | |
| Download: ML20212E158 (2) | |
See also: IR 05000456/1986063
Text
- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ -
_____
o
o
DEC 2 91988
Docket No. 50-456
Docket No. 50-457
Comonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,
W. J. Kropp, T. E. Taylor and M. J. Farber of this office on October 24
through December 18, 1986, of activities at the Braidwood Station, Units 1
and 2, authorized by NRC Operating License No. NPF-59 and Construction Permit
No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations a copy of
thisletter,theenclosures,andyourresponsetothisletterwIllbeplaced
in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
NO
k
W. S. Little, Director
0
BraidwoodProject
Enclosures:
1.
2.
Inspection Report
No. 50-456/86063(DRP);
No. 50-457/86044(DRP)
See Attached DistrSutton
Q
r
1
/
e
t*Mmnj
pe1
a/g
rth,a
. [ E o/
' i
F
>
,
,
DEC 2 91986
Commonwealth Edison Company
2
,
Distribution
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
.
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
J. W. McCaffrey, Chief, Public
utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, OGC
J. Moore, DGC
G. Berry, OGC
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
i
l
.
.
.
.
.
.