PNO-III-86-104, on 860923,unit Shutdown at 4:08 Am,To Investigate Cause of High Bearing Temp on One of Recirculation Pumps.Vendor Insp Determined That Some Cells, Which Supply Control Power to Hpic Sys Valves Be Degraded: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
{{#Wiki_filter:e | {{#Wiki_filter:e p; | ||
- PRELIMINARY NOTIFICATION OF EVENT-OR UNUSUAL OCCURRENCEePNO-!!!-86404 Date'Septemb6 23,1 | |||
* This preliminary notification constitutes EARLY notice of events of-POSSIBLE safety The information is as initially received without verification _or evaluation, and is basically all that-is- known by. the Region !!!- | * This preliminary notification constitutes EARLY notice of events of-POSSIBLE safety The information is as initially received without y [ N or public' interest _significancei _ | ||
verification _or evaluation, and is basically all that-is-known by. the Region !!!- | |||
a | ystaffonthisdate.- | ||
a | |||
: Facility:; Iowa Electric Light:& Power Co.H Licensee Emergency Classification:- | : Facility:; Iowa Electric Light:& Power Co.H Licensee Emergency Classification:- | ||
Duane Arnold Energy Center. | Duane Arnold Energy Center. | ||
Notification of.an Unusual Event | |||
=Palo,-I C 52324 Alert Site Area Emergency Docket No. 50-331-General Emergency T Not Applicable | |||
==Subject:== | ==Subject:== | ||
-SHUTDOWNFORRECIRCl4ATIONPUMPBEARINGPROBLEM- | -SHUTDOWNFORRECIRCl4ATIONPUMPBEARINGPROBLEM-Theunitwasshutdownat4:08a.m._(CDT), September 23, 1986, to investigate the cause of high bearing temperatures on one of the recirculation pumps. During the shutdown, other maintenance will be performed including replacement of a recirculation valve in the High Pressure Coolant Injection-(HPCI) System and the evaluation and possible replacement of - | ||
Theunitwasshutdownat4:08a.m._(CDT), September 23, 1986, to investigate the cause of high bearing temperatures on one of the recirculation pumps. During the shutdown, other maintenance will be performed including replacement of a recirculation valve in the High | |||
12 cells in the 250-volt battery bank. A vendor inspection determined some cells, which supply control power to HPIC System valves, to be degraded and the-HPCI system was | 12 cells in the 250-volt battery bank. A vendor inspection determined some cells, which supply control power to HPIC System valves, to be degraded and the-HPCI system was | ||
' declared-inoperable. Other Emergency Core Cooling Systems were operable, and the HPCI- | |||
: problem therefore did not require shutdown. | : problem therefore did not require shutdown. | ||
The outage is expected to last longer than 48 hours. | The outage is expected to last longer than 48 hours. | ||
The State of Iowa will-be notified. | The State of Iowa will-be notified. | ||
Region !!!-(Chicago) was informed that the' unit was shutting down at 4 p.m. (CDT), | Region !!!-(Chicago) was informed that the' unit was shutting down at 4 p.m. (CDT), | ||
September 22, 1986, and additional information was provided by the Resident' Inspector._ This | September 22, 1986, and additional information was provided by the Resident' Inspector._ This information is current as of 11 a.m.,_ September 23, 1986. | ||
'>k CONTACT: | |||
k CONTACT: | D. C. Boyd W. G. Guldemond-FTS 388-5546 FTS 388-5574 C/R Distribution: | ||
Chm, Cmrs, S,GC,CA,ACRS. Historian, yy SECY, Records. | |||
SECY, Records. | v ') | ||
SP: O W P2 d3S N' C | |||
'OISTRIBUTION: | |||
EDO | H. St. | ||
EDO | |||
_NRR E/W " | |||
Willste Mail: ADM:DMB NMSS u DOT:Trans only Chairman Zech PAL IE. | |||
30 Conn. Roberts ELD OIA RES Comm. Asselstine AE00 Conni. Bernthal | |||
- Conn. Carr 5P~ | |||
Regional-Offices | |||
-ACRSc | |||
(M d_2 D | ~ | ||
9711040021 6 NO-I | -SECY. | ||
INP01 MSAC R. | |||
ne: | |||
(Corp. Office.-R9actorLic.Only) | |||
,9 | |||
\\' | |||
Region III | |||
.Rev. November 1985 (M d_2 D | |||
~ | |||
9711040021 6 i_ | |||
NO-I 96-104 PDR _, _ | |||
= | |||
m | |||
_ _ _ _}} | |||
{{PNO-Nav|region=III}} | {{PNO-Nav|region=III}} | ||
Latest revision as of 07:25, 4 December 2024
| ML20212E682 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 09/23/1986 |
| From: | Boyd D, Guldemond W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| References | |
| PNO-III-86-104, NUDOCS 9711040021 | |
| Download: ML20212E682 (1) | |
e p;
- PRELIMINARY NOTIFICATION OF EVENT-OR UNUSUAL OCCURRENCEePNO-!!!-86404 Date'Septemb6 23,1
- This preliminary notification constitutes EARLY notice of events of-POSSIBLE safety The information is as initially received without y [ N or public' interest _significancei _
verification _or evaluation, and is basically all that-is-known by. the Region !!!-
ystaffonthisdate.-
a
- Facility:; Iowa Electric Light:& Power Co.H Licensee Emergency Classification:-
Duane Arnold Energy Center.
Notification of.an Unusual Event
=Palo,-I C 52324 Alert Site Area Emergency Docket No. 50-331-General Emergency T Not Applicable
Subject:
-SHUTDOWNFORRECIRCl4ATIONPUMPBEARINGPROBLEM-Theunitwasshutdownat4:08a.m._(CDT), September 23, 1986, to investigate the cause of high bearing temperatures on one of the recirculation pumps. During the shutdown, other maintenance will be performed including replacement of a recirculation valve in the High Pressure Coolant Injection-(HPCI) System and the evaluation and possible replacement of -
12 cells in the 250-volt battery bank. A vendor inspection determined some cells, which supply control power to HPIC System valves, to be degraded and the-HPCI system was
' declared-inoperable. Other Emergency Core Cooling Systems were operable, and the HPCI-
- problem therefore did not require shutdown.
The outage is expected to last longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
The State of Iowa will-be notified.
Region !!!-(Chicago) was informed that the' unit was shutting down at 4 p.m. (CDT),
September 22, 1986, and additional information was provided by the Resident' Inspector._ This information is current as of 11 a.m.,_ September 23, 1986.
'>k CONTACT:
D. C. Boyd W. G. Guldemond-FTS 388-5546 FTS 388-5574 C/R Distribution:
Chm, Cmrs, S,GC,CA,ACRS. Historian, yy SECY, Records.
v ')
SP: O W P2 d3S N' C
'OISTRIBUTION:
H. St.
_NRR E/W "
Willste Mail: ADM:DMB NMSS u DOT:Trans only Chairman Zech PAL IE.
30 Conn. Roberts ELD OIA RES Comm. Asselstine AE00 Conni. Bernthal
- Conn. Carr 5P~
Regional-Offices
-ACRSc
~
-SECY.
INP01 MSAC R.
ne:
(Corp. Office.-R9actorLic.Only)
,9
\\'
Region III
.Rev. November 1985 (M d_2 D
~
9711040021 6 i_
NO-I 96-104 PDR _, _
=
m
_ _ _ _