TXX-4964, Final Deficiency Rept CP-86-25 Re Lack of Full Breaker/Fuse Coordination for Several safety-related Loads.Initially Reported on 860410.Condition Not Reportable Per 10CFR50.55(e): Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.- | {{#Wiki_filter:.- | ||
Log # TXX-4964 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 400 NORTH OIJVE STREET. L.B. SI . DALLA 8. TEXAS 75308 August 18, 1986 UA%7A.*,if."Or Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | Log # TXX-4964 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OIJVE STREET. L.B. SI. DALLA 8. TEXAS 75308 August 18, 1986 UA%7A.*,if."Or Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 24: | Line 24: | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage' study could be incorrect. We have submitted interim reports logged TXX-4789 and TXX-4930, dated May 9,1986, and July 22, 1986, respectively. | On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage' study could be incorrect. We have submitted interim reports logged TXX-4789 and TXX-4930, dated May 9,1986, and July 22, 1986, respectively. | ||
Evaluation of this issue has shown that although a lack of coordination exists for several safety related loads, their circuit breakers / fuses and respective cables are in areas where high or moderate energy lines are not located. | Evaluation of this issue has shown that although a lack of coordination exists for several safety related loads, their circuit breakers / fuses and respective cables are in areas where high or moderate energy lines are not located. | ||
Thus, the location of these components precludes a pipe whip or jet from compromising the safe shutdown capability of the plant. Therefore, we have concluded that this issue is not reportable under the provisions of 10CFR50.55(e). Records supporting this determination are available for your inspectors to review at the CPSES site. | Thus, the location of these components precludes a pipe whip or jet from compromising the safe shutdown capability of the plant. Therefore, we have concluded that this issue is not reportable under the provisions of 10CFR50.55(e). | ||
Records supporting this determination are available for your inspectors to review at the CPSES site. | |||
Very truly yours, | Very truly yours, | ||
!Y | |||
&n W. G. Counsil | |||
(s. S7 Keeley | / | ||
Manager, Nuclea H Vensing JCH/arh | By: | ||
(s. S7 Keeley | |||
/ | |||
Manager, Nuclea H Vensing JCH/arh | |||
/ | |||
c - NRC Region IV (0 + 1 copy) | c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8609250232 860318 PDR | U. S. Nuclear Regulatory Commission Washington, D.C. | ||
ya | 20555 8609250232 860318 PDR ADOCK 05000445 S | ||
PDR yqs ya | |||
.}} | |||
Latest revision as of 06:31, 4 December 2024
| ML20212L160 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/18/1986 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-25, TXX-4964, NUDOCS 8608250232 | |
| Download: ML20212L160 (1) | |
Text
.-
Log # TXX-4964 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OIJVE STREET. L.B. SI. DALLA 8. TEXAS 75308 August 18, 1986 UA%7A.*,if."Or Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-44G BREAKER / FUSE C0 ORDINATION SDAR: CP-86-25 (FINAL REPORT)
Dear Mr. Johnson:
On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage' study could be incorrect. We have submitted interim reports logged TXX-4789 and TXX-4930, dated May 9,1986, and July 22, 1986, respectively.
Evaluation of this issue has shown that although a lack of coordination exists for several safety related loads, their circuit breakers / fuses and respective cables are in areas where high or moderate energy lines are not located.
Thus, the location of these components precludes a pipe whip or jet from compromising the safe shutdown capability of the plant. Therefore, we have concluded that this issue is not reportable under the provisions of 10CFR50.55(e).
Records supporting this determination are available for your inspectors to review at the CPSES site.
Very truly yours,
!Y
&n W. G. Counsil
/
By:
(s. S7 Keeley
/
Manager, Nuclea H Vensing JCH/arh
/