VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 87-02 FOR THE MONTH OF FEBRUARY, 1987 i | |||
VERMONT YANKEE NUCLEAR POWER STATION | f\\m\\ | ||
~ | |||
f\m\ | 8703160169 870228 PDR ADOCK 05000271 R | ||
PDR | |||
8703160169 870228 PDR | |||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
1.- Unit Names | 50-271 P | ||
DATE-870310 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 i-l OPERATING STATUS Notes: | |||
1.- | |||
[ | Unit Names Vermont Yankee 2. | ||
Reporting Period: | |||
February 3. | |||
Licensed Thermal Power (MWt): | |||
1593 | |||
[ | |||
4. | |||
Nameplate Rating (Gross MWe): | |||
540 j. | |||
5. | |||
Design Electrical Rating (Not MWe):514(oc) 504(cc) 6. | |||
Maximus Dependable Capacity (Gross MWe): | |||
535 7. | |||
Maximum Dependable Capacity (Not MWe): | |||
504 1 | |||
L 8. | |||
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons: | |||
N/A i | N/A i | ||
9. | |||
: 10. Reasons for restrictions, if any: | Power level to which restricted, if any (Not MWe): N/A | ||
: 11. Hours in Reporting Period | : 10. Reasons for restrictions, if any: | ||
N/A This month Yr-to-Date Cumulative | |||
: 11. Hours in Reporting Period 672.00 1416.00 | |||
: 12. Number of Hours Reactor was Critical 672.00 1416.00 98886.73 | |||
: 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 l- | |||
: 14. Hours Generator On-Line 672.00 1416.00 96394.69 I | |||
: 15. Unit R rve Shutdown Hours 0.00 0.00 0.00 | |||
: 16. Gross E rmal Energy Generated (MWH) | : 16. Gross E rmal Energy Generated (MWH) | ||
Avoeu. . vu | Avoeu.. vu u=vove.ov i=vvive==.vu | ||
: 17. Gross Electrical Energy Generated (MWH) | : 17. Gross Electrical Energy Generated (MWH) 359326.00 760770.00 46889604.00 4 | ||
: 18. Net Electrical Energy Generated (MWH) | : 18. Net Electrical Energy Generated (MWH) 344782.00_ | ||
: 19. Unit Service Factor | 729952.00 44488628.00 | ||
: 20. Unit Availability Factor | : 19. Unit Service Factor 100.00 100.00 76.16 | ||
: 20. Unit Availability Factor 100.00 100.00 76.16 | |||
: 22. Unit Capacity Factor (using DER Net) | : 21. Unit capacity Factor (using MDC Net) 101.80 102.28 69.74 | ||
: 23. Unit Forced Outage Rate- | : 22. Unit Capacity Factor (using DER Net) 99.82 100.29 68.38 | ||
1987 Refuelino Outaae scheduled to beain on Auaust 8, 1987 and continue | : 23. Unit Forced Outage Rate-0.00 0.00 6.60 l | ||
: 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each): | |||
: 25. If' shut down at end of report period, estimated date of startup: | 1987 Refuelino Outaae scheduled to beain on Auaust 8, 1987 and continue throuah October 2, 1987. | ||
: 26. Units in Test Status (prior to commercial operation): N/A Forecast | : 25. If' shut down at end of report period, estimated date of startup: | ||
N/A | |||
: 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved f. | |||
INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Original COMMERCIAL OPERATION | |||
/ | |||
"~ | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | |||
515__ | 50-271 UNIT Vermont Yankee DATE 870310 COMPLETED BY G.A. Wallin i | ||
17 | TELEPHONE (802) 257-7711 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
14 | (MWe-Net) 1 515__ | ||
15 | 17 519 2 | ||
16 | 518 18 519 3 | ||
519 19 519 4 | |||
520 20 519 5 | |||
519 21 519 6 | |||
518 22 515 7 | |||
409 23 519 8 | |||
480 24 519 9 | |||
519 25 518 10 519 26 519 11 519 27 519 12 519 28 519 13 519 29 14 519 30 15 516 31 16 518 INSTRUCTIONS: | |||
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
VYDPF 0411.02 Original i | VYDPF 0411.02 Original i | ||
5 DOCKET NO. 50-271 UNIT NAE | 5 DOCKET NO. | ||
87-02 | 50-271 UNIT NAE Vermont Yankee UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 870310 COMPLETED BY G. A. Wallin REPORT MONTH February TELEPHOE (802) 257-7711 1 | ||
Reduction 87-02 | 2 3 | ||
1 | 4 5 | ||
E-Operator Training and License Examination | No. | ||
F-Administrative | Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours) | ||
Shutting Down Event Code Code Prevent Recurrence Reactor Report # | |||
87-02 870207 S | |||
0.00 B | |||
4 N/A RB ZZZZZZ Power reduction for Turbine Power Bypass Valve testing. | |||
Reduction 87-02 870207 S | |||
0.00 B,H* | |||
4 N/A RB CONROD Power reduction for a Control Roc Power Pattern exchange and surveillance Reduction testing. | |||
1 2 | |||
3 4 | |||
F-Forced A-Equipment Failure (Explain) | |||
Method: | |||
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161) | |||
E-Operator Training and License Examination 4-Other (Explain) | |||
F-Administrative 5 | |||
VYDPF 0411.03 G-Operational Error (Explain) | |||
Exhibit I - Same Source Original | |||
* H-Other (Explain) - Control Rod Pattern Exchange | * H-Other (Explain) - Control Rod Pattern Exchange | ||
g DOCKET NO. 50-271 UNIT | g DOCKET NO. | ||
Gross electrical generation was -'59,326 | 50-271 UNIT V:rmont Yankee DATE 870310 C0tn.CTED BY G.A. Wallin TELEPHONE (802) 257-7711 REPORT MONTH February SU N RY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 98.9% of rated thermal power for the month. | ||
Gross electrical generation was -'59,326 MWH or 99.0% of design e | |||
or 99.0% of design electrical capacity. | electrical capacity. | ||
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month: | Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month: | ||
At the beginning of the reporting period the plant was operating at 99.9% of rated thermal power. | At the beginning of the reporting period the plant was operating at 99.9% of rated thermal power. | ||
870207 At 0825 hours, reduced power to 80% to perform turbine bypass valve testing. | 870207 At 0825 hours, reduced power to 80% to perform turbine bypass valve testing. | ||
(See Unit Shutdowns and Power Reductions) 870207 At 0835 hours, completed turbine bypass valve testing. Reduced power to minimum recirculation flow. | |||
870207 At 0903 hours, initiated control rod exercising and turbine surveillance. | 870207 At 0903 hours, initiated control rod exercising and turbine surveillance. | ||
870207 At 0920 hours, tripped the "A" recirculation pump for K1 set brush replacement. | 870207 At 0920 hours, tripped the "A" recirculation pump for K1 set brush replacement. | ||
870207 At 1103 hours, completed control rod exercising and turbine sur-veillance; initiated a rod pattern exchange. (See Unit Shutdowns and Power Reductions) 870207 At 1218 hours, completed the rod pattern exchange. | 870207 At 1103 hours, completed control rod exercising and turbine sur-veillance; initiated a rod pattern exchange. | ||
(See Unit Shutdowns and Power Reductions) 870207 At 1218 hours, completed the rod pattern exchange. | |||
870207 At 1255 hours, started the "A" recirculation pump and a return to full power was initiated. | 870207 At 1255 hours, started the "A" recirculation pump and a return to full power was initiated. | ||
At the end of the reporting period the plant was operating at 99.9% of rated thermal power. | At the end of the reporting period the plant was operating at 99.9% of rated thermal power. | ||
VYDPF 0411.04 Original | VYDPF 0411.04 Original | ||
4 VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR !!UNT ROAD VERNON, VERMONT 05354 VYV 87- 051 March 10, 1987 i | |||
U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C. | U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C. | ||
20555 | |||
==Dear Sir:== | ==Dear Sir:== | ||
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 1987. | Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 1987. | ||
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP. | Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP. | ||
b | b NM Warren P. Murphy Vice President and Manager of Operations WPH/ TAW / mmh:MSR1.1/MSR VYDPF 0411 Original h | ||
I | I i i}} | ||
Latest revision as of 04:24, 4 December 2024
| ML20212P612 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 02/28/1987 |
| From: | Murphy W, Wallin G VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| VYV-87-051, VYV-87-51, NUDOCS 8703160169 | |
| Download: ML20212P612 (6) | |
Text
~,),-
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 87-02 FOR THE MONTH OF FEBRUARY, 1987 i
f\\m\\
~
8703160169 870228 PDR ADOCK 05000271 R
OPERATING DATA REPORT DOCKET NO.
50-271 P
DATE-870310 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 i-l OPERATING STATUS Notes:
1.-
Unit Names Vermont Yankee 2.
Reporting Period:
February 3.
Licensed Thermal Power (MWt):
1593
[
4.
Nameplate Rating (Gross MWe):
540 j.
5.
Design Electrical Rating (Not MWe):514(oc) 504(cc) 6.
Maximus Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Not MWe):
504 1
L 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A i
9.
Power level to which restricted, if any (Not MWe): N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 672.00 1416.00
- 12. Number of Hours Reactor was Critical 672.00 1416.00 98886.73
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 l-
- 14. Hours Generator On-Line 672.00 1416.00 96394.69 I
- 15. Unit R rve Shutdown Hours 0.00 0.00 0.00
- 16. Gross E rmal Energy Generated (MWH)
Avoeu.. vu u=vove.ov i=vvive==.vu
- 17. Gross Electrical Energy Generated (MWH) 359326.00 760770.00 46889604.00 4
- 18. Net Electrical Energy Generated (MWH) 344782.00_
729952.00 44488628.00
- 19. Unit Service Factor 100.00 100.00 76.16
- 20. Unit Availability Factor 100.00 100.00 76.16
- 21. Unit capacity Factor (using MDC Net) 101.80 102.28 69.74
- 22. Unit Capacity Factor (using DER Net) 99.82 100.29 68.38
- 23. Unit Forced Outage Rate-0.00 0.00 6.60 l
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
1987 Refuelino Outaae scheduled to beain on Auaust 8, 1987 and continue throuah October 2, 1987.
- 25. If' shut down at end of report period, estimated date of startup:
N/A
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved f.
INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Original COMMERCIAL OPERATION
/
"~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee DATE 870310 COMPLETED BY G.A. Wallin i
TELEPHONE (802) 257-7711 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 515__
17 519 2
518 18 519 3
519 19 519 4
520 20 519 5
519 21 519 6
518 22 515 7
409 23 519 8
480 24 519 9
519 25 518 10 519 26 519 11 519 27 519 12 519 28 519 13 519 29 14 519 30 15 516 31 16 518 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
VYDPF 0411.02 Original i
5 DOCKET NO.
50-271 UNIT NAE Vermont Yankee UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 870310 COMPLETED BY G. A. Wallin REPORT MONTH February TELEPHOE (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
87-02 870207 S
0.00 B
4 N/A RB ZZZZZZ Power reduction for Turbine Power Bypass Valve testing.
Reduction 87-02 870207 S
0.00 B,H*
4 N/A RB CONROD Power reduction for a Control Roc Power Pattern exchange and surveillance Reduction testing.
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
VYDPF 0411.03 G-Operational Error (Explain)
Exhibit I - Same Source Original
- H-Other (Explain) - Control Rod Pattern Exchange
g DOCKET NO.
50-271 UNIT V:rmont Yankee DATE 870310 C0tn.CTED BY G.A. Wallin TELEPHONE (802) 257-7711 REPORT MONTH February SU N RY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 98.9% of rated thermal power for the month.
Gross electrical generation was -'59,326 MWH or 99.0% of design e
electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.9% of rated thermal power.
870207 At 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br />, reduced power to 80% to perform turbine bypass valve testing.
(See Unit Shutdowns and Power Reductions) 870207 At 0835 hours0.00966 days <br />0.232 hours <br />0.00138 weeks <br />3.177175e-4 months <br />, completed turbine bypass valve testing. Reduced power to minimum recirculation flow.
870207 At 0903 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.435915e-4 months <br />, initiated control rod exercising and turbine surveillance.
870207 At 0920 hours0.0106 days <br />0.256 hours <br />0.00152 weeks <br />3.5006e-4 months <br />, tripped the "A" recirculation pump for K1 set brush replacement.
870207 At 1103 hours0.0128 days <br />0.306 hours <br />0.00182 weeks <br />4.196915e-4 months <br />, completed control rod exercising and turbine sur-veillance; initiated a rod pattern exchange.
(See Unit Shutdowns and Power Reductions) 870207 At 1218 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.63449e-4 months <br />, completed the rod pattern exchange.
870207 At 1255 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.775275e-4 months <br />, started the "A" recirculation pump and a return to full power was initiated.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 Original
4 VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR !!UNT ROAD VERNON, VERMONT 05354 VYV 87- 051 March 10, 1987 i
U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 1987.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
b NM Warren P. Murphy Vice President and Manager of Operations WPH/ TAW / mmh:MSR1.1/MSR VYDPF 0411 Original h
I i i