J. | J. | ||
E Log # TXX-6465 | E Log # TXX-6465 File # 10130 d | ||
IR 85-13 l | |||
IR 85-13 IR 85-09 | 1-n IR 85-09 i- | ||
= | |||
Ref: | |||
10CFR50.55(e) | |||
May 22, 1987 1 | May 22, 1987 1 | ||
U. S.' Nuclear Regulatory Commission i | |||
ATTN: Document Control Desk j | ATTN: Document Control Desk j | ||
Washington, D.C. | |||
20555 i | |||
SU8 JECT: | |||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | |||
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09 | DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09 | ||
^ | |||
REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (NOV) ITEM D | REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (NOV) ITEM D | ||
| Line 35: | Line 40: | ||
i Gentlemen: | i Gentlemen: | ||
In cur response (Reference 2) to NOV 445/8513-V-01 (Item D), we stated that the I | In cur response (Reference 2) to NOV 445/8513-V-01 (Item D), we stated that the I | ||
field verification activities for the identification of electrical and raceway i | field verification activities for the identification of electrical and raceway i | ||
22, 1987. As a result of delays in these activities, we will be unable to complete our field verification by this date. We anticipate completion of our field verification activities for Unit I and Common installations by June 26, 1987. The remaining dates when full compliance will be achieved stated in Reference 2 for the Unit 1 and Common final design verification and for all Unit' 2 l | sleeves for Unit 1 and Common installations were scheduled to be completed by May 22, 1987. As a result of delays in these activities, we will be unable to 4 | ||
complete our field verification by this date. We anticipate completion of our field verification activities for Unit I and Common installations by June 26, 1987. The remaining dates when full compliance will be achieved stated in Reference 2 for the Unit 1 and Common final design verification and for all Unit' 2 l | |||
activities remain unchanged. | activities remain unchanged. | ||
Very truly yours, 3 | |||
aim W. G. Counsil i | |||
RSB/mlh | RSB/mlh c - Mr. R. D. Martin, Region IV l | ||
CPSES Resident Inspector - 3 copies B705280116'870526) | |||
PDR ADOCK 05000445 g | |||
G | ) | ||
PDR G | |||
) Q 400 N. Olive _ Da!!as. Texas 75201 i | |||
i | |||
.,. _. - - _. _ _}} | |||
Latest revision as of 01:52, 4 December 2024
| ML20214J584 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/22/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-6465, NUDOCS 8705280116 | |
| Download: ML20214J584 (1) | |
Text
. _. _
J.
E Log # TXX-6465 File # 10130 d
IR 85-13 l
1-n IR 85-09 i-
=
Ref:
May 22, 1987 1
U. S.' Nuclear Regulatory Commission i
ATTN: Document Control Desk j
Washington, D.C.
20555 i
SU8 JECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09
^
REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (NOV) ITEM D
REFERENCE:
- 1) TUGC0 Letter TXX-4932 from W. G. Counsil' to E. H. Johnson dated August 14, 1986.
i Gentlemen:
In cur response (Reference 2) to NOV 445/8513-V-01 (Item D), we stated that the I
field verification activities for the identification of electrical and raceway i
sleeves for Unit 1 and Common installations were scheduled to be completed by May 22, 1987. As a result of delays in these activities, we will be unable to 4
complete our field verification by this date. We anticipate completion of our field verification activities for Unit I and Common installations by June 26, 1987. The remaining dates when full compliance will be achieved stated in Reference 2 for the Unit 1 and Common final design verification and for all Unit' 2 l
activities remain unchanged.
Very truly yours, 3
aim W. G. Counsil i
RSB/mlh c - Mr. R. D. Martin, Region IV l
CPSES Resident Inspector - 3 copies B705280116'870526)
PDR ADOCK 05000445 g
)
PDR G
) Q 400 N. Olive _ Da!!as. Texas 75201 i
i
.,. _. - - _. _ _