TXX-6465, Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. _ . _                _  _      _ _ _ _ _                              . _              _      _        .                        _    _ - . . . - _ _ _          _ _                        _ _ - -    _
{{#Wiki_filter:. _. _
J.               _
J.
E Log # TXX-6465
E Log # TXX-6465 File # 10130 d
                                                                                                    '                                                            File # 10130 l            1-n d
IR 85-13 l
IR 85-13 IR 85-09
1-n IR 85-09 i-
              =
=
i-Ref:   10CFR50.55(e)
Ref:
10CFR50.55(e)
May 22, 1987 1
May 22, 1987 1
.                        U. S.' Nuclear Regulatory Commission i
U. S.' Nuclear Regulatory Commission i
ATTN: Document Control Desk j                         Washington, D.C. 20555 i                         SU8 JECT:               COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
ATTN: Document Control Desk j
Washington, D.C.
20555 i
SU8 JECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09
  ^
^
REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (NOV) ITEM D
REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (NOV) ITEM D


Line 35: Line 40:
i Gentlemen:
i Gentlemen:
In cur response (Reference 2) to NOV 445/8513-V-01 (Item D), we stated that the I
In cur response (Reference 2) to NOV 445/8513-V-01 (Item D), we stated that the I
field verification activities for the identification of electrical and raceway i                         sleeves for Unit 1 and Common installations were scheduled to be completed by May 4
field verification activities for the identification of electrical and raceway i
22, 1987. As a result of delays in these activities, we will be unable to complete our field verification by this date. We anticipate completion of our field verification activities for Unit I and Common installations by June 26, 1987. The remaining dates when full compliance will be achieved stated in Reference 2 for the Unit 1 and Common final design verification and for all Unit' 2 l
sleeves for Unit 1 and Common installations were scheduled to be completed by May 22, 1987. As a result of delays in these activities, we will be unable to 4
complete our field verification by this date. We anticipate completion of our field verification activities for Unit I and Common installations by June 26, 1987. The remaining dates when full compliance will be achieved stated in Reference 2 for the Unit 1 and Common final design verification and for all Unit' 2 l
activities remain unchanged.
activities remain unchanged.
3                                                                                                                              Very truly yours,
Very truly yours, 3
,                                                                                                                                                    aim W. G. Counsil i
aim W. G. Counsil i
RSB/mlh
RSB/mlh c - Mr. R. D. Martin, Region IV l
.                        c - Mr. R. D. Martin, Region IV l                             CPSES Resident Inspector - 3 copies B705280116'870526)                                                                                                                                             g PDR               ADOCK 05000445
CPSES Resident Inspector - 3 copies B705280116'870526)
)
PDR ADOCK 05000445 g
G                                                     PDR
)
                                                                                                                                                                                                                ) Q 400 N. Olive _ Da!!as. Texas 75201                                                                                   i i
PDR G
    - , ,      . _ _ _ .          ... _ _ ,. _ ,. - _ _ , _ _ . . _ _ - . . - - _ . _ ,                                        _ _ _ _ _ _ , ,                        _.      . , . _ . - - _ . _ _}}
) Q 400 N. Olive _ Da!!as. Texas 75201 i
i
.,. _. - - _. _ _}}

Latest revision as of 01:52, 4 December 2024

Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626
ML20214J584
Person / Time
Site: Comanche Peak  
Issue date: 05/22/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-6465, NUDOCS 8705280116
Download: ML20214J584 (1)


Text

. _. _

J.

E Log # TXX-6465 File # 10130 d

IR 85-13 l

1-n IR 85-09 i-

=

Ref:

10CFR50.55(e)

May 22, 1987 1

U. S.' Nuclear Regulatory Commission i

ATTN: Document Control Desk j

Washington, D.C.

20555 i

SU8 JECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09

^

REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (NOV) ITEM D

REFERENCE:

1) TUGC0 Letter TXX-4932 from W. G. Counsil' to E. H. Johnson dated August 14, 1986.
2) TU Electric Letter TXX-6424 from W. G. Counsil to NRC dated May 6, 1987.

i Gentlemen:

In cur response (Reference 2) to NOV 445/8513-V-01 (Item D), we stated that the I

field verification activities for the identification of electrical and raceway i

sleeves for Unit 1 and Common installations were scheduled to be completed by May 22, 1987. As a result of delays in these activities, we will be unable to 4

complete our field verification by this date. We anticipate completion of our field verification activities for Unit I and Common installations by June 26, 1987. The remaining dates when full compliance will be achieved stated in Reference 2 for the Unit 1 and Common final design verification and for all Unit' 2 l

activities remain unchanged.

Very truly yours, 3

aim W. G. Counsil i

RSB/mlh c - Mr. R. D. Martin, Region IV l

CPSES Resident Inspector - 3 copies B705280116'870526)

PDR ADOCK 05000445 g

)

PDR G

) Q 400 N. Olive _ Da!!as. Texas 75201 i

i

.,. _. - - _. _ _