ML20214L832: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:r- | {{#Wiki_filter:r-Arizona Nuclear Power Project | ||
Arizona Nuclear Power Project | . 'q P.o. BOX $2034 o PHOENIX, ARIZONA 85072-2034 g | ||
August 26, 1986 "80 ANPP-37984-JGIf[f'SN/98.05 An ag Mr. John B. Martin, Regional Administrator | |||
/t pp Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 6/C//pqE Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 | |||
==Subject:== | ==Subject:== | ||
| Line 39: | Line 40: | ||
==Dear Mr. Martin:== | ==Dear Mr. Martin:== | ||
Attached please find two copies of Supplement 2 to the Startup Report (Reference | Attached please find two copies of Supplement 2 to the Startup Report (Reference | ||
: 1) prepared and submitted pursuant to Specification 6.9.1.3 of Appendix A (Techni-cal Specifications) to the Palo Verde Nuclear Generating Station Unit 1 Operating License. Supplement 2 covers the items that were open at the time Supplement 1 (Reference 2) was submitted, including the Reactor Coolant and Secondary Chemistry Test, the Biological Shield Survey, and the Main and Emergency Feedwater Systems Test. Additionally, a new open item, the Intercomparison of PPS, Core Protection Calculator (CPC), and PMS Inputs is addressed. | : 1) prepared and submitted pursuant to Specification 6.9.1.3 of Appendix A (Techni-cal Specifications) to the Palo Verde Nuclear Generating Station Unit 1 Operating License. | ||
Supplement 2 covers the items that were open at the time Supplement 1 (Reference 2) was submitted, including the Reactor Coolant and Secondary Chemistry Test, the Biological Shield Survey, and the Main and Emergency Feedwater Systems Test. | |||
Additionally, a new open item, the Intercomparison of PPS, Core Protection Calculator (CPC), and PMS Inputs is addressed. | |||
Supplement 3 to the Startup Report will be submitted by November 24, 1986, and will address those items not closed out with this supplement, which are the Reactor Cool-ant and Secondary Chemistry Test, the Biological Shield Survey, and the Intercom-parison of PPS, Core Protection Calculator (CPC), and PMS Inputs. | Supplement 3 to the Startup Report will be submitted by November 24, 1986, and will address those items not closed out with this supplement, which are the Reactor Cool-ant and Secondary Chemistry Test, the Biological Shield Survey, and the Intercom-parison of PPS, Core Protection Calculator (CPC), and PMS Inputs. | ||
If you have any questions, please contact me. | If you have any questions, please contact me. | ||
Very truly yours, | Very truly yours, | ||
}NA---- | |||
J. G. Ilaynes Vice President Nuclear Production JGil/PGN/rw | J. G. Ilaynes Vice President Nuclear Production JGil/PGN/rw | ||
p | [jf Attachment 8609100393 860026 T g- ? f-PDR ADOCK 05000S28 | ||
'' j p | |||
PDRo | |||
<PO}} | |||
Latest revision as of 01:34, 4 December 2024
| ML20214L832 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/26/1986 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20214L835 | List: |
| References | |
| ANPP-37984-JGH, NUDOCS 8609100393 | |
| Download: ML20214L832 (1) | |
Text
r-Arizona Nuclear Power Project
. 'q P.o. BOX $2034 o PHOENIX, ARIZONA 85072-2034 g
August 26, 1986 "80 ANPP-37984-JGIf[f'SN/98.05 An ag Mr. John B. Martin, Regional Administrator
/t pp Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 6/C//pqE Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528 (License NPF-41)
Startup Report Supplement 2 File: 86-001-404; 86-E-056-026
Reference:
(1) Letter from E. E. Van Brunt, Jr., (ANPP), to J. B. Martin, (NRC),
dated February 25, 1986, (ANPP-35288).
Subject:
Unit 1 Startup Report.
(2) Letter from E. E. Van Brunt, Jr., (ANPP), to J. B. Martin, (NRC),
dated May 21, 1986, (ANPP-36657).
Subject:
Startup Report Supplement 1.
Dear Mr. Martin:
Attached please find two copies of Supplement 2 to the Startup Report (Reference
- 1) prepared and submitted pursuant to Specification 6.9.1.3 of Appendix A (Techni-cal Specifications) to the Palo Verde Nuclear Generating Station Unit 1 Operating License.
Supplement 2 covers the items that were open at the time Supplement 1 (Reference 2) was submitted, including the Reactor Coolant and Secondary Chemistry Test, the Biological Shield Survey, and the Main and Emergency Feedwater Systems Test.
Additionally, a new open item, the Intercomparison of PPS, Core Protection Calculator (CPC), and PMS Inputs is addressed.
Supplement 3 to the Startup Report will be submitted by November 24, 1986, and will address those items not closed out with this supplement, which are the Reactor Cool-ant and Secondary Chemistry Test, the Biological Shield Survey, and the Intercom-parison of PPS, Core Protection Calculator (CPC), and PMS Inputs.
If you have any questions, please contact me.
Very truly yours,
}NA----
J. G. Ilaynes Vice President Nuclear Production JGil/PGN/rw
[jf Attachment 8609100393 860026 T g- ? f-PDR ADOCK 05000S28
j p
PDRo
<PO