Forwards Suppl 2 to Startup Rept.Suppl Covers Previously Open Items,Including Reactor Coolant & Secondary Chemistry Test Biological Shield Survey & Main & Emergency Feedwater Sys Test.Suppl 3 Will Be Submitted by 861124
ML20214L832
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/26/1986
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20214L835 List:
References
ANPP-37984-JGH, NUDOCS 8609100393
Download: ML20214L832 (1)


Text

r- ,

Arizona Nuclear Power Project <

. 'q P.o. BOX $2034 o PHOENIX, ARIZONA 85072-2034 g August 26, 1986 "80 ANPP-37984-JGIf[f'SN/98.05 An ag Mr. John B. Martin, Regional Administrator /t pp Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 6/C//p Region V qE 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License NPF-41)

Startup Report Supplement 2 File: 86-001-404; 86-E-056-026

Reference:

(1) Letter from E. E. Van Brunt, Jr., (ANPP), to J. B. Martin, (NRC),

dated February 25, 1986, (ANPP-35288).

Subject:

Unit 1 Startup Report.

(2) Letter from E. E. Van Brunt, Jr., (ANPP), to J. B. Martin, (NRC),

dated May 21, 1986, (ANPP-36657).

Subject:

Startup Report Supplement 1.

Dear Mr. Martin:

Attached please find two copies of Supplement 2 to the Startup Report (Reference

1) prepared and submitted pursuant to Specification 6.9.1.3 of Appendix A (Techni-cal Specifications) to the Palo Verde Nuclear Generating Station Unit 1 Operating License. Supplement 2 covers the items that were open at the time Supplement 1 (Reference 2) was submitted, including the Reactor Coolant and Secondary Chemistry Test, the Biological Shield Survey, and the Main and Emergency Feedwater Systems Test. Additionally, a new open item, the Intercomparison of PPS, Core Protection Calculator (CPC), and PMS Inputs is addressed.

Supplement 3 to the Startup Report will be submitted by November 24, 1986, and will address those items not closed out with this supplement, which are the Reactor Cool-ant and Secondary Chemistry Test, the Biological Shield Survey, and the Intercom-parison of PPS, Core Protection Calculator (CPC), and PMS Inputs.

If you have any questions, please contact me.

Very truly yours,

}NA----

J. G. Ilaynes Vice President Nuclear Production JGil/PGN/rw Attachment [jf 8609100393 860026 T g- ? jf-PDR ADOCK 05000S28 -

p PDRo <PO