TXX-6123, Interim Deficiency Rept CP-86-39 Re Dimensional Tolerances of Shims Used in Conjunction w/C-Type Clamps on Cable Trays. Initially Reported on 860527.Evaluation of Test Data Will Be Completed by 870331.Next Rept Anticipated by 870421: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-                       __      __
{{#Wiki_filter:-
Log # TXX-6123 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SEYWAY TOWER . 40B ,eGa?,8 OtJVE STREET. LB. St . DALLAS. TEXAB 78898 November 26, 1986 munu o.cou m                                                                                     $
Log # TXX-6123 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SEYWAY TOWER. 40B,eGa?,8 OtJVE STREET. LB. St. DALLAS. TEXAB 78898 November 26, 1986 munu o.cou m DEC - 91986 8
DEC - 91986 Mr. Eric H. Johnson, Director                                                         u                 8 Division of Reactor Safety and Projects                                                                     ,
Mr. Eric H. Johnson, Director u
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011


==SUBJECT:==
==SUBJECT:==
Line 26: Line 26:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving dimensional tolerances of the shims used in conjunction with C-Type clamps on cable trays. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4874 and TXX-6056, dated June 26, 1986, and October 21, 1986, respectively.
On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving dimensional tolerances of the shims used in conjunction with C-Type clamps on cable trays. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4874 and TXX-6056, dated June 26, 1986, and October 21, 1986, respectively.
The testing program described in TXX-6056 has not yet been completed. Our current schedule for completing these tests is January 15, 1987. Our evaluation of the test data and an assessment of the effects of the deficiency on the safety of plant operations are scheduled to be completed by March 31, l           1987.
The testing program described in TXX-6056 has not yet been completed. Our current schedule for completing these tests is January 15, 1987. Our evaluation of the test data and an assessment of the effects of the deficiency on the safety of plant operations are scheduled to be completed by March 31, l
!          We anticipate submitting our next report by April 21, 1987.
1987.
We anticipate submitting our next report by April 21, 1987.
Very truly yours, W. G. Counsil JCH/mlh c - NRC Region IV (0 + 1 copy)
Very truly yours, W. G. Counsil JCH/mlh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8612160426 861126 PDR   ADOCK 05000445 S                       PDR A unusuis or trx<s tanwrs ruernic nntesw                                       &}}
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8612160426 861126 PDR ADOCK 05000445 S
PDR A unusuis or trx<s tanwrs ruernic nntesw}}

Latest revision as of 23:50, 3 December 2024

Interim Deficiency Rept CP-86-39 Re Dimensional Tolerances of Shims Used in Conjunction w/C-Type Clamps on Cable Trays. Initially Reported on 860527.Evaluation of Test Data Will Be Completed by 870331.Next Rept Anticipated by 870421
ML20215D625
Person / Time
Site: Comanche Peak  
Issue date: 11/26/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-39, TXX-6123, NUDOCS 8612160426
Download: ML20215D625 (1)


Text

-

Log # TXX-6123 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SEYWAY TOWER. 40B,eGa?,8 OtJVE STREET. LB. St. DALLAS. TEXAB 78898 November 26, 1986 munu o.cou m DEC - 91986 8

Mr. Eric H. Johnson, Director u

Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CABLE TRAY C-TYPE CLAMP SHIM DIMENSIONS SDAR: CP-86-39 (INTERIM REPORT)

Dear Mr. Johnson:

On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving dimensional tolerances of the shims used in conjunction with C-Type clamps on cable trays. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4874 and TXX-6056, dated June 26, 1986, and October 21, 1986, respectively.

The testing program described in TXX-6056 has not yet been completed. Our current schedule for completing these tests is January 15, 1987. Our evaluation of the test data and an assessment of the effects of the deficiency on the safety of plant operations are scheduled to be completed by March 31, l

1987.

We anticipate submitting our next report by April 21, 1987.

Very truly yours, W. G. Counsil JCH/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8612160426 861126 PDR ADOCK 05000445 S

PDR A unusuis or trx<s tanwrs ruernic nntesw