TXX-6056, Interim Deficiency Rept CP-86-39 Re Dimensional Tolerances of Shims Used in Conjunction w/C-Type Clamps on Cable Trays. Initially Reported on 860527.Testing Program Initiated to Evaluate Tray/Clamp Configuration.Next Rept by 861128

From kanterella
(Redirected from TXX-6056)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-39 Re Dimensional Tolerances of Shims Used in Conjunction w/C-Type Clamps on Cable Trays. Initially Reported on 860527.Testing Program Initiated to Evaluate Tray/Clamp Configuration.Next Rept by 861128
ML20215L823
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/21/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-39, TXX-6056, NUDOCS 8610290305
Download: ML20215L823 (2)


Text

,. _ _ _. _. _ _

s Log # TXX-6056 File # 10110 l 903.9 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NORTH OIJVE frTREET.1 H. 8 8 . DA11AN TEXAN 78301 October 21, 1986 N 2 2'

[w[S.@[M[R8%m.

~'i l

B OCT 211986  !

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects h: hs' U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 l Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CABLE TRAY C-TYPE CLAMP AND DIMENSIONS SDAR: CP-86-39 (INTERIM REPORT)

Dear Mr. Johnson:

On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving dimensional tolerances of the shims used in conjunction with C-Type clamps on cable trays. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted an ir.terim report logged TXX-4874, dated June 26, 1986.

Original design requirements specified shim plates when utilized with "C" type clamps to be flush with the tray web and extend a maximum of 1/2" beyond the outside of the web. This requirement provides shimming under the full width of the tray flange.

Due to an error in transferring information from the original design change to the erection and inspection drawing, the shim plate was given a tolerance of plus or minus 1/2" from the tray web. This allowed the shim plate to be installed up to 1/2" inward from the web underneath the tray flange. As a result, some unacceptable clamp / shim configurations could have been installed l and accepted.

l To address this issue, a study has been conducted which indicates that local stresses in the tray flange near the "C" clamp, due to the maximum anticipated loading conditions, are less than the allowable plastic limits given in the I

CPSES FSAR except for the T. J. Cope 4" x 12" tray section. Further evaluations are required for the T. J. Cope 4" x 12" tray to establish the correlation between the limiting acceptable seismic "g" values and the expected specific response accelerations. The limiting seismic accelerations of concern are in the direction perpendicular to the tray plan, i. e. for the horizontal trays, it is in the direction of the natural gravity - downward.

A testing program has been initiated to evaluate the T. J. Cope 4" x 12" tray / clamp configuration. It is anticipated that this testing will be complete by November, 1986.

8610290305 861021 PDR ADOCK 05000445 S PDR

,. \ A unvussos or rexas amurtes zu.ecrase courAur

{ zy

e

' 4 TXX-6056 October 21, 1986 Page 2 of 2 Our final evaluation will be performed upon completion of testing. Based on the schedule projected For these activities, we anticipate submitting our next report by November 28, 1986.

1 yours, Very pu, t!r/ GusAC W. G. Coun i J

By: N ,b e LI8 '

G.S. Keeley - /-

Manager, Nuclear Licerit[ing JCH/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcerrent (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 4