ML20215L319: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~
{{#Wiki_filter:q
__                                  q October 20, 1986 NRC/TilI-86-102 MEtiORANDUM FOR:           Harold R. Denton, Director Office of Nuclear Reactor Regulation Frank J. Fliraglia, Director Division of PUR Licensing-B FR0ft:                     Willian D. Travers, Director Tf1I-2 Cleanup Project Directorate
~
October 20, 1986 NRC/TilI-86-102 MEtiORANDUM FOR:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Frank J. Fliraglia, Director Division of PUR Licensing-B FR0ft:
Willian D. Travers, Director Tf1I-2 Cleanup Project Directorate


==SUBJECT:==
==SUBJECT:==
NR THI-? LEANUP PROJECT DIRECTORATE WEEKLY STATUS REP r< FOR OCTOBER 11 - 19, 1986
NR THI-? LEANUP PROJECT DIRECTORATE WEEKLY STATUS REP r<
: 1.     DEFUELING The core drilling rig hx been installed on the shielded work platform and the debris bed cleared of end fittings in preparation for drilling operations. The drilling operations are expected to begin on Nonday, October 20, 1986
FOR OCTOBER 11 - 19, 1986 1.
: 2.       ENVIRONMENT /L MONITORING US Environmental Protection Agency (EPA) sample analysis results show that THI site liquid effluents are in accordance with regulatcry limits, NRC requirements, and The City of Lencaster Agreenent.
DEFUELING The core drilling rig hx been installed on the shielded work platform and the debris bed cleared of end fittings in preparation for drilling operations. The drilling operations are expected to begin on Nonday, October 20, 1986 2.
ENVIRONMENT /L MONITORING US Environmental Protection Agency (EPA) sample analysis results show that THI site liquid effluents are in accordance with regulatcry limits, NRC requirements, and The City of Lencaster Agreenent.
The Lancaster water sample taken at the water works river intake and analyzed by EPA consisted of a seven day composite sample taken September 28 - October 4,1986. A gar.raa scan detected no reactor related activity.
The Lancaster water sample taken at the water works river intake and analyzed by EPA consisted of a seven day composite sample taken September 28 - October 4,1986. A gar.raa scan detected no reactor related activity.
Ttil water samples taken by EPA at the plant discharge (includes Units 1 and 2) to the river consisted of seven daily composite sanples taken froa September 27 - October 4,1986. A gemia scan detected no reactor related activity.
Ttil water samples taken by EPA at the plant discharge (includes Units 1 and 2) to the river consisted of seven daily composite sanples taken froa September 27 - October 4,1986. A gemia scan detected no reactor related activity.
The EPA analyses of the NRC outdoor air s6mple for the period October 9 - 16, 1986 showed that concentrations of Cs-137 and I-131 were below the lower lirait of quantitative detection (LLD) for the system. The LLD varies around a value of IE-13 uCi/cc.
The EPA analyses of the NRC outdoor air s6mple for the period October 9 - 16, 1986 showed that concentrations of Cs-137 and I-131 were below the lower lirait of quantitative detection (LLD) for the system. The LLD varies around a value of IE-13 uCi/cc.
8610280578 861020                           -
8610280578 861020
    ,u   .>                                        PDR   ADOCK 05000320 7                 PDR ons>                                                 I L.                              .
,u PDR ADOCK 05000320 7
h NRC FORM 318 (10-80) NRCM 0240               OFFICI AL RECORD COPY
PDR ons>
I h
L.
NRC FORM 318 (10-80) NRCM 0240 OFFICI AL RECORD COPY


Harold R. Denton                                                                                         2                                                                       Octcber 20, 19C6 Frenk J. Mira9 1i A                                                                                                                                                             lGC/Tiil-85-102
Harold R. Denton 2
: 3.       AUXILIARY AWD FUEL MAUDLIilG BUILDING /sCTIVITIES Kelly vacuuriing continues in tha annulus area betm.cn the reactor building end fuel handling building. llork contiaues on the M 1' and has been ccapleted cn the 305', 328', cod 347' elevaticns.
Octcber 20, 19C6 Frenk J. Mira9 i A lGC/Tiil-85-102 1
3.
AUXILIARY AWD FUEL MAUDLIilG BUILDING /sCTIVITIES Kelly vacuuriing continues in tha annulus area betm.cn the reactor building end fuel handling building. llork contiaues on the M 1' and has been ccapleted cn the 305', 328', cod 347' elevaticns.
A tua week car;'paign to flush the mkeup and purificetion systel piping ucs coupleted. The purpase of the flush wes to reduce exterior dose rates arcund the piping.
A tua week car;'paign to flush the mkeup and purificetion systel piping ucs coupleted. The purpase of the flush wes to reduce exterior dose rates arcund the piping.
Scabbling has been started in the east corridor of the 3/8'
Scabbling has been started in the east corridor of the 3/8' clevation fuel h mdiing building.
* clevation fuel h mdiing building.
i.
: i.     HRC EV/,LUATIONS IN PRGGRESS Technical Specification Change Requat nu:c.bers 49, 51, 50, und 54.
HRC EV/,LUATIONS IN PRGGRESS Technical Specification Change Requat nu:c.bers 49, 51, 50, und 54.
Recovery Operations Plc.n Changa nuubers 31 cnd 33.
Recovery Operations Plc.n Changa nuubers 31 cnd 33.
Solid Waste Facility Techniccl Evaluation Report.
Solid Waste Facility Techniccl Evaluation Report.
Line 42: Line 51:
Disposal of Processed Water Repert.
Disposal of Processed Water Repert.
SER for Use cf Plesna /.rc Cuttf r.g Torch.
SER for Use cf Plesna /.rc Cuttf r.g Torch.
l
l 5.
: 5.       EVALUATIONS CO !Pi.ETED Tha NRC staff approved CPUil's Cora Bore Operutions Safety Evaluation Report (SE.7) on October 16, 1986. This pcnaits expanded use of tha ccra drilling rig as a defueling tool. The drill rig will bc used to drill hales in the hard crust un tcp uf the core. The drilling is lir:ited to the crea above the lower cora grid and within a 4ds" radius of cera cantar. Drilling operattuns era expected to Inst several ucuks.
EVALUATIONS CO !Pi.ETED Tha NRC staff approved CPUil's Cora Bore Operutions Safety Evaluation Report (SE.7) on October 16, 1986. This pcnaits expanded use of tha ccra drilling rig as a defueling tool. The drill rig will bc used to drill hales in the hard crust un tcp uf the core. The drilling is lir:ited to the crea above the lower cora grid and within a 4ds" radius of cera cantar. Drilling operattuns era expected to Inst several ucuks.
: 6.       PUBl.I_C _ NEETI's'G The r. ext rwting of the Advisory Ponal is tentativaly scheduled for Decueber 10,19CS. At that eeetind the licensec will give a presentation on their licensing submittal fur the Post Dafueling Plant Status. That subuittal is scheduled for issue to tne HRC staff in Govenber.
6.
PUBl.I_C _ NEETI's'G The r. ext rwting of the Advisory Ponal is tentativaly scheduled for Decueber 10,19CS. At that eeetind the licensec will give a presentation on their licensing submittal fur the Post Dafueling Plant Status. That subuittal is scheduled for issue to tne HRC staff in Govenber.
I'ersons desiring to speak before the Advisary Panel are requested to ccntact Mr. Tileuas Snithgall at 717-291-1C42, or urite hin at 21 H
I'ersons desiring to speak before the Advisary Panel are requested to ccntact Mr. Tileuas Snithgall at 717-291-1C42, or urite hin at 21 H
                          !!arietta Avenue, Lancaster, PA 17603.
!!arietta Avenue, Lancaster, PA 17603.
ORIGlHAL Sn% %
ORIGlHAL Sn% %
William D. Imverg Willi <.o n. Travers Director T I-i Cleacup Prea cct Directorate OFFICE sun- >
William D. Imverg Willi <.o n. Travers Director T I-i Cleacup Pre cct Directorate a
                                                                                                                                                                                                      ,i,,
OFFICE sun- >
DATE) ... ..          ...  .      .                  . .                                                                  .              .                                      .          .
,i,,
                                                                                                                                                                                                      .j.      ... .
DATE)
.j.
nne mnu ais no sos uncu 024o OFFICIAL RECORD COPY
nne mnu ais no sos uncu 024o OFFICIAL RECORD COPY


liarold R. Denton                                     3                                 October 20, 1986 Frank J. Miraglia                                                                       tmC/THI-06-102 I!4TERNAL DISTRIBUTI0tl CEl4 TRAL FILE
liarold R. Denton 3
                !!RC PDR LOCAL PDR EDO OGC EPA DOE RI Regional Administrator RI Division Directors Public Affairs, RI State Liaison, RI Tiil liq r/f TliI SITE r/f T;II-2 Project Sectinn File T11I-l Resident Office (5)
October 20, 1986 Frank J. Miraglia tmC/THI-06-102 I!4TERNAL DISTRIBUTI0tl CEl4 TRAL FILE
TDI Cleanup Project Directorate (14) l "lCEp   ,
!!RC PDR LOCAL PDR EDO OGC EPA DOE RI Regional Administrator RI Division Directors Public Affairs, RI State Liaison, RI Tiil liq r/f TliI SITE r/f T;II-2 Project Sectinn File T11I-l Resident Office (5)
T ICP
TDI Cleanup Project Directorate (14) l "lCEp T
                    , ,,    , TMICPDg,,,     , F1l         ,,
ICP TMICPDg,,,
                                                                ,,TMI           ,,,,  ,,,,,,,,,,,,,              ,,,,,,,,,,,,,        ,,,,,,,,,,,,,
, F1l
*""*>     .4       4     QS.CCQW9111.... .Tei           port   W                 -                        -                      -                -
,,TMI
o^" > .9&/.86..    . 10 9.0./86 ,,,,
* " " * >.4 4
                                                ,10   ,,,,,,,
QS.CCQW9111....
                                                                  ,1   ,,,s,,          ,,,,,,,,,,,,,              .      ,, .. ,,,        , ,,,,,,,,,,
.Tei port W
) nne ronu ais nosoi nncu ano                     OFFICIAL. RECORD COPY . _ _ _              __      _  _ _ _ _ _              .
o^" >.9&/.86.. 10 9.0./86
___,___ _ ____ _]}}
,10
,1
,,,s,,
) nne ronu ais nosoi nncu ano OFFICIAL. RECORD COPY
___,___ _ ____ _]
.}}

Latest revision as of 21:42, 3 December 2024

Submits TMI-2 Cleanup Project Directorate Weekly Status Rept for 861011-19
ML20215L319
Person / Time
Site: Crane 
Issue date: 10/20/1986
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Miraglia F
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-86-102 NUDOCS 8610280578
Download: ML20215L319 (3)


Text

q

~

October 20, 1986 NRC/TilI-86-102 MEtiORANDUM FOR:

Harold R. Denton, Director Office of Nuclear Reactor Regulation Frank J. Fliraglia, Director Division of PUR Licensing-B FR0ft:

Willian D. Travers, Director Tf1I-2 Cleanup Project Directorate

SUBJECT:

NR THI-? LEANUP PROJECT DIRECTORATE WEEKLY STATUS REP r<

FOR OCTOBER 11 - 19, 1986 1.

DEFUELING The core drilling rig hx been installed on the shielded work platform and the debris bed cleared of end fittings in preparation for drilling operations. The drilling operations are expected to begin on Nonday, October 20, 1986 2.

ENVIRONMENT /L MONITORING US Environmental Protection Agency (EPA) sample analysis results show that THI site liquid effluents are in accordance with regulatcry limits, NRC requirements, and The City of Lencaster Agreenent.

The Lancaster water sample taken at the water works river intake and analyzed by EPA consisted of a seven day composite sample taken September 28 - October 4,1986. A gar.raa scan detected no reactor related activity.

Ttil water samples taken by EPA at the plant discharge (includes Units 1 and 2) to the river consisted of seven daily composite sanples taken froa September 27 - October 4,1986. A gemia scan detected no reactor related activity.

The EPA analyses of the NRC outdoor air s6mple for the period October 9 - 16, 1986 showed that concentrations of Cs-137 and I-131 were below the lower lirait of quantitative detection (LLD) for the system. The LLD varies around a value of IE-13 uCi/cc.

8610280578 861020

,u PDR ADOCK 05000320 7

PDR ons>

I h

L.

NRC FORM 318 (10-80) NRCM 0240 OFFICI AL RECORD COPY

Harold R. Denton 2

Octcber 20, 19C6 Frenk J. Mira9 i A lGC/Tiil-85-102 1

3.

AUXILIARY AWD FUEL MAUDLIilG BUILDING /sCTIVITIES Kelly vacuuriing continues in tha annulus area betm.cn the reactor building end fuel handling building. llork contiaues on the M 1' and has been ccapleted cn the 305', 328', cod 347' elevaticns.

A tua week car;'paign to flush the mkeup and purificetion systel piping ucs coupleted. The purpase of the flush wes to reduce exterior dose rates arcund the piping.

Scabbling has been started in the east corridor of the 3/8' clevation fuel h mdiing building.

i.

HRC EV/,LUATIONS IN PRGGRESS Technical Specification Change Requat nu:c.bers 49, 51, 50, und 54.

Recovery Operations Plc.n Changa nuubers 31 cnd 33.

Solid Waste Facility Techniccl Evaluation Report.

liaavy Lead Safety Evaluation Repert, P.evision 3.

Disposal of Processed Water Repert.

SER for Use cf Plesna /.rc Cuttf r.g Torch.

l 5.

EVALUATIONS CO !Pi.ETED Tha NRC staff approved CPUil's Cora Bore Operutions Safety Evaluation Report (SE.7) on October 16, 1986. This pcnaits expanded use of tha ccra drilling rig as a defueling tool. The drill rig will bc used to drill hales in the hard crust un tcp uf the core. The drilling is lir:ited to the crea above the lower cora grid and within a 4ds" radius of cera cantar. Drilling operattuns era expected to Inst several ucuks.

6.

PUBl.I_C _ NEETI's'G The r. ext rwting of the Advisory Ponal is tentativaly scheduled for Decueber 10,19CS. At that eeetind the licensec will give a presentation on their licensing submittal fur the Post Dafueling Plant Status. That subuittal is scheduled for issue to tne HRC staff in Govenber.

I'ersons desiring to speak before the Advisary Panel are requested to ccntact Mr. Tileuas Snithgall at 717-291-1C42, or urite hin at 21 H

!!arietta Avenue, Lancaster, PA 17603.

ORIGlHAL Sn% %

William D. Imverg Willi <.o n. Travers Director T I-i Cleacup Pre cct Directorate a

OFFICE sun- >

,i,,

DATE)

.j.

nne mnu ais no sos uncu 024o OFFICIAL RECORD COPY

liarold R. Denton 3

October 20, 1986 Frank J. Miraglia tmC/THI-06-102 I!4TERNAL DISTRIBUTI0tl CEl4 TRAL FILE

!!RC PDR LOCAL PDR EDO OGC EPA DOE RI Regional Administrator RI Division Directors Public Affairs, RI State Liaison, RI Tiil liq r/f TliI SITE r/f T;II-2 Project Sectinn File T11I-l Resident Office (5)

TDI Cleanup Project Directorate (14) l "lCEp T

ICP TMICPDg,,,

, F1l

,,TMI

  • " " * >.4 4

QS.CCQW9111....

.Tei port W

o^" >.9&/.86.. 10 9.0./86

,10

,1

,,,s,,

) nne ronu ais nosoi nncu ano OFFICIAL. RECORD COPY

___,___ _ ____ _]

.