ML20215N925: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.                                   _                 ..
{{#Wiki_filter:.
  -e
_
                                                                  DCT 3 01986
..
    .
-e
  .
DCT 3 01986
      Docket No.     50-293
.
      Boston Edison Company M/C Nuclear
.
      ATTN: Mr. James M. Lydon
Docket No.
                  Chief Operating Officer -
50-293
      800 Boylston Street.
Boston Edison Company M/C Nuclear
      Boston, MA 02199                                                       ~
ATTN: Mr. James M. Lydon
      Gentlemen:
Chief Operating Officer -
      Subject:     Inspection No. 50-293/86-28
800 Boylston Street.
      This refers to the routine safeguards inspection conducted by'Mr. G. C. Smith
Boston, MA 02199
      of this office on August 4-6, 1986, at the Pilgrim Nuclear Power Station,
~
      Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and
Gentlemen:
      to the discussions of our findings held by Mr. Smith.with Mr. E. J. Ziemianski
Subject:
      of your staff at the conclusion.of the inspection.
Inspection No. 50-293/86-28
      Areas examined during this inspection.are described in the NRC Region I
This refers to the routine safeguards inspection conducted by'Mr. G. C. Smith
      Inspection Report which is enclosed with this letter. Within these areas, the
of this office on August 4-6, 1986, at the Pilgrim Nuclear Power Station,
      inspection consisted of selective examinations of procedures and representative
Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and
to the discussions of our findings held by Mr. Smith.with Mr. E. J. Ziemianski
of your staff at the conclusion.of the inspection.
Areas examined during this inspection.are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
l
l
      records, interviews with personnel, and observations by the inspector.
records, interviews with personnel, and observations by the inspector.
      Within the scope of this inspection, no violations were observed.
Within the scope of this inspection, no violations were observed.
      No reply to this letter is required. Your cooperation with us is appreciated.
No reply to this letter is required. Your cooperation with us is appreciated.
                                                                    Sincerely,
Sincerely,
                                                                  6 ?f, ital 31W4 DIl
6 ?f, ital 31W4 DIl
                                                                    :cean.:cyra
:cean.:cyra
                                                                      homas T. Martin, Director
homas T. Martin, Director
                                                                      ivision of Radiation Safety
ivision of Radiation Safety
                                                                      and Safeguards
and Safeguards
      Enclosure: NRC Region I_ Inspection Report Number 50-293/86-28
Enclosure: NRC Region I_ Inspection Report Number 50-293/86-28
;                NkNDoh
NkNDoh
                  G
3
                                        3
[
                                                      [
;
                                                    OFFICIAL RECORD COPY       IR PILGRIM 86-28 - 0001.0.0
G
l                                                                               10/22/86
OFFICIAL RECORD COPY
                                                                                                                %EDL{
IR PILGRIM 86-28 - 0001.0.0
          _ _ . _       ,   - ___ _ _ _._._ _.__,_                                             _ ,     _ . .   _ . _ _
l
10/22/86
%EDL{
_ _ . _
,
- ___ _ _ _._._ _.__,_
.
_ ,
_ . .
_ . _ _


  .
.
      Boston Edison Company                 2
Boston Edison Company
  '*
2
      M/C Nuclear
'*
                .
M/C Nuclear
      cc w/ enc 1:
.
      L. Oxsen, Vice President, Nuclear Operations
cc w/ enc 1:
      A. E. Pedersen, Station Manager
L. Oxsen, Vice President, Nuclear Operations
      Paul Levy, Chairman, Department of Public Utilities
A. E. Pedersen, Station Manager
      Chairman, Board of Selectmen
Paul Levy, Chairman, Department of Public Utilities
      J. D. Keyes
Chairman, Board of Selectmen
      Plymouth Civil Defense Director
J. D. Keyes
      Senator Edward P. Kirby
Plymouth Civil Defense Director
      The Honorable Peter V. Forman
Senator Edward P. Kirby
      Sharon Pollard
The Honorable Peter V. Forman
      E. R. MacCormack, Senior Regulatory Affairs and Program Engineer
Sharon Pollard
      Public Document Room (PDR)
E. R. MacCormack, Senior Regulatory Affairs and Program Engineer
      Local Public Document Room (LPDR)
Public Document Room (PDR)
      Nuclear Safety Information Center (NSIC)
Local Public Document Room (LPDR)
      NRC Resident Inspector
Nuclear Safety Information Center (NSIC)
      Comonwealth of Massachusetts (2)
NRC Resident Inspector
    The Honorable E. J. Markey
Comonwealth of Massachusetts (2)
      bec w/ enc 1:
The Honorable E. J. Markey
      Region I Docket Room (with concurrences)
bec w/ enc 1:
      Management Assistant, DRMA (w/o encl)
Region I Docket Room (with concurrences)
      Section Chief, DRP
Management Assistant, DRMA (w/o encl)
      W. Raymond, SRI, Vermont Yankee
Section Chief, DRP
      T. Shedlosky, SRI, Millstone 1&2
W. Raymond, SRI, Vermont Yankee
      H. Eichenholz, SRI, Yankee
T. Shedlosky, SRI, Millstone 1&2
      P. Leech, LPM, NRR
H. Eichenholz, SRI, Yankee
      Robert J. Bores, DRSS
P. Leech, LPM, NRR
                                                      r%
Robert J. Bores, DRSS
      I: RSS                  RI:Dy$S                 WI:ES
r%
            mjd/emw           Kei i                     Joyner
RI:Dy$S
      1 p /86                   10/u /86                 10SM86
WI:ES
                                                            ~
I: RSS
                                0FFICIAL RECORD COPY     IR PILGRIM 86-28 - 0002.0.0
mjd/emw
                                                          10/22/86
Kei i
Joyner
1 p /86
10/u /86
10SM86
~
0FFICIAL RECORD COPY
IR PILGRIM 86-28 - 0002.0.0
10/22/86
,
,
}}
}}

Latest revision as of 21:12, 3 December 2024

Forwards Safeguards Insp Rept 50-293/86-28 on 860804-06. No Violations Noted
ML20215N925
Person / Time
Site: Pilgrim
Issue date: 10/30/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lydon J
BOSTON EDISON CO.
Shared Package
ML20215N926 List:
References
NUDOCS 8611100078
Download: ML20215N925 (2)


See also: IR 05000293/1986028

Text

.

_

..

-e

DCT 3 01986

.

.

Docket No.

50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. James M. Lydon

Chief Operating Officer -

800 Boylston Street.

Boston, MA 02199

~

Gentlemen:

Subject:

Inspection No. 50-293/86-28

This refers to the routine safeguards inspection conducted by'Mr. G. C. Smith

of this office on August 4-6, 1986, at the Pilgrim Nuclear Power Station,

Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and

to the discussions of our findings held by Mr. Smith.with Mr. E. J. Ziemianski

of your staff at the conclusion.of the inspection.

Areas examined during this inspection.are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

l

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us is appreciated.

Sincerely,

6 ?f, ital 31W4 DIl

cean.:cyra

homas T. Martin, Director

ivision of Radiation Safety

and Safeguards

Enclosure: NRC Region I_ Inspection Report Number 50-293/86-28

NkNDoh

3

[

G

OFFICIAL RECORD COPY

IR PILGRIM 86-28 - 0001.0.0

l

10/22/86

%EDL{

_ _ . _

,

- ___ _ _ _._._ _.__,_

.

_ ,

_ . .

_ . _ _

.

Boston Edison Company

2

'*

M/C Nuclear

.

cc w/ enc 1:

L. Oxsen, Vice President, Nuclear Operations

A. E. Pedersen, Station Manager

Paul Levy, Chairman, Department of Public Utilities

Chairman, Board of Selectmen

J. D. Keyes

Plymouth Civil Defense Director

Senator Edward P. Kirby

The Honorable Peter V. Forman

Sharon Pollard

E. R. MacCormack, Senior Regulatory Affairs and Program Engineer

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Comonwealth of Massachusetts (2)

The Honorable E. J. Markey

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

W. Raymond, SRI, Vermont Yankee

T. Shedlosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

Robert J. Bores, DRSS

r%

RI:Dy$S

WI:ES

I: RSS

mjd/emw

Kei i

Joyner

1 p /86

10/u /86

10SM86

~

0FFICIAL RECORD COPY

IR PILGRIM 86-28 - 0002.0.0

10/22/86

,