ML20216G403: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:- - - ___         _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _
{{#Wiki_filter:- - - ___
. >
_ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _
                                                                                                                l
.
                                                                                                                !
>
                                      jut 12 51987
l
                                                                                                                l
!
                                                                                                                !
jut 12 51987
    In Reply Refer To:
!
    Dockets:   50-445/87-07                                                                                     3
In Reply Refer To:
              50-446/87-06                                                                                     l
Dockets:
                                                                                                                l
50-445/87-07
                                                                                                                ;
3
    TU Electric
50-446/87-06
    ATTN: Mr. W.   G. Counsil                                                                                   l
l
            Executive Vice President                                                                             j
l
    400 Ncrth Olive Street, Lock Box 81                                                                         !
;
    Dallas, Texas 75201                                                                                         l
TU Electric
                                                                                                                !
ATTN:
    Gentlemen:
Mr. W. G. Counsil
    This refers to the construction inspection conducted by Messrs.                                             l
l
    D. L. Kelley and P. C. Wagner of the Comanche Peak Project
Executive Vice President
                                                                                                                !
j
    Division during the period March 1 through April 30, 1987, of
400 Ncrth Olive Street, Lock Box 81
    activities authorized by NRC Construction Permits CPPR-126 and                                               ,
!
    CPPR-127 for the Comanche Peak Steam Electric Station, Units 1                                               l
Dallas, Texas
                                                                                                                '
75201
    and 2, and to the discussions of our findings with Mr. L. D. Nace
l
    and other members of your staff during and at the conclusion of
!
    the inspection.                                                                                             j
Gentlemen:
    Areas of construction examined during the inspection included the                                           l
This refers to the construction inspection conducted by Messrs.
    installation of electrical penetration assemblies in Unit 1 and                                               l
l
    Unit 2. The inspection consisted of selective examination of
!
    procedures and representative records, interviews with personnel,
D.
    and observation by the inspectors. These findings are documented
L. Kelley and P. C. Wagner of the Comanche Peak Project
    in the enclosed inspection report.
Division during the period March 1 through April 30, 1987, of
    During this inspection, certain of your activities appeared to be
activities authorized by NRC Construction Permits CPPR-126 and
    in violation of NRC requirements. These apparent violations are
,
    being reviewed for potential escalated enforcement action. An
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
    enforcement conference to discuss the facts of these items has
l
    been scheduled for July 6, 1987, at 2:00 pm in your conference
and 2, and to the discussions of our findings with Mr. L. D. Nace
    room. You will be notified in subsequent correspondence as to
'
    the resolution of these findings.
and other members of your staff during and at the conclusion of
    In accordance with 10 CFR'2.790 of the Commission's regulations,
the inspection.
    a copy of this'1etter and the enclosed inspection report will be
j
    placed in the NRC Public Document Room.
Areas of construction examined during the inspection included the
                                    Ad             RRd         crs yw
l
    OFC:     OSP:CP: RI     OSP:CP:RI         OSP:CP:AD     OSP:CP:D
installation of electrical penetration assemblies in Unit 1 and
    NAME:     DKe}le         PWagner           RWarnick       CGrimes
Unit 2.
    DATE:     6/p /87         6//6/87           6/7E/87       6/ M/87
The inspection consisted of selective examination of
      70
procedures and representative records, interviews with personnel,
            f&s                                                                 le ()
and observation by the inspectors.
  o
These findings are documented
                                                                                                              g
in the enclosed inspection report.
During this inspection, certain of your activities appeared to be
in violation of NRC requirements.
These apparent violations are
being reviewed for potential escalated enforcement action.
An
enforcement conference to discuss the facts of these items has
been scheduled for July 6, 1987, at 2:00 pm in your conference
room.
You will be notified in subsequent correspondence as to
the resolution of these findings.
In accordance with 10 CFR'2.790 of the Commission's regulations,
a copy of this'1etter and the enclosed inspection report will be
placed in the NRC Public Document Room.
Ad
RRd
crs yw
OFC:
OSP:CP: RI
OSP:CP:RI
OSP:CP:AD
OSP:CP:D
NAME:
DKe}le
PWagner
RWarnick
CGrimes
DATE:
6/p /87
6//6/87
6/7E/87
6/ M/87
f&s
l ()
70
o
e g


, ,
,
    TU Eectric                       -2-
,
    Should you have any questions concerning this inspection, we will
TU Eectric
    be pleased to discuss them with you..                             ,
-2-
                                                                                  ,
Should you have any questions concerning this inspection, we will
                                          Sincerely,                               )
be pleased to discuss them with you..
                                        ORIGINAL SIGNED BY                         .
,
                                        C. I. Grimes                           -]
,
                                          C. I. Grimes, Director
Sincerely,
                                          Comanche Peak. Project                   J
)
                                            Division
ORIGINAL SIGNED BY
    Enclosure:
.
    NRC Construction Inspection Report
C.
      50-445/87-07
I. Grimes
      50-446/87-06
-]
    cc w/ enclosure:                                                                 j
C.
    TU Electric                                                                     l
I. Grimes, Director
    ATTN: G. S. Keeley, Manager,                                                     l
Comanche Peak. Project
            Nuclear Licensing                                                       i '
J
    Skyway Tower
Division
    400 North Olive Street                                                           i
Enclosure:
    Lock Box 81
NRC Construction Inspection Report
    Dallas, Texas 75201
50-445/87-07
    Juanita Ellis
50-446/87-06
    President - CASE                                                                 i
cc w/ enclosure:
    1426 South Polk Street                                                         )
j
    Dallas, Texas     75224                                 '-
TU Electric
                                                                                      l
ATTN:
                                                                                    s
G.
    Renea Hicks                                                 .
S. Keeley, Manager,
                                                                                    >
Nuclear Licensing
    Assistant Attorney General
i
    Environmental Protection. Division
'
    P.O. Box 12548, Capitol Station
Skyway Tower
    Austin, Texas     78711-2548
400 North Olive Street
    Administrative Judge Peter Bloch                                               j
i
    U. S. Nuclear Regulatory Commission
Lock Box 81
    Washington, D. C.   20555                                                       ;
Dallas, Texas
    Elizabeth B. Johnson
75201
    Administrative Judge
Juanita Ellis
    Oak Ridge National Laboratory.
President - CASE
    P. O. Box X, Building 3500
1426 South Polk Street
    Oak Ridge, Tennessee 37830
)
                                                                                    !
Dallas, Texas
    Dr. Kenneth A. McCollom                                             ~
75224
                                                                                    ,
'-
    1107 West Knapp.
s
    Stillwater, Oklahoma   74075
Renea Hicks
                                                                          )
.
                                                                                s
>
                                                                            ...'
Assistant Attorney General
Environmental Protection. Division
P.O. Box 12548, Capitol Station
Austin, Texas
78711-2548
Administrative Judge Peter Bloch
j
U. S. Nuclear Regulatory Commission
Washington, D. C.
20555
Elizabeth B. Johnson
Administrative Judge
Oak Ridge National Laboratory.
P. O. Box X, Building 3500
Oak Ridge, Tennessee
37830
!
Dr. Kenneth A. McCollom
,
1107 West Knapp.
~
Stillwater, Oklahoma
74075
)
s
...'


  . i
.
      TU Electric                         -3-
i
      Dr. Walter H. Jordan
TU Electric
                                                                !
-3-
      Administrative Judge
Dr. Walter H. Jordan
      881 West Outer Drive                                     l
Administrative Judge
      Oak Ridge, Tennessee         37830
881 West Outer Drive
                                                                l
Oak Ridge, Tennessee
      Anthony Roisman, Esq.                                     l
37830
                                                                '
l
      Suite 600
Anthony Roisman, Esq.
      1401 New York Avenue NW
'
      Washington, D. C.         20005
Suite 600
      Texas Radiation Control Program Director
1401 New York Avenue NW
      Bureau of Radiation Control
Washington, D.
      Department-of Health                                     !
C.
      1100 West 49th                                           !
20005
      Austin, Texas         78756
Texas Radiation Control Program Director
Bureau of Radiation Control
Department-of Health
1100 West 49th
!
Austin, Texas
78756
1
1
      4 bcc i...to; DMB:l(IE01);
4 bcc i...to; DMB:l(IE01);
      bec distrib. by OSP:
bec distrib. by OSP:
        CPTG                                 RPB               .
CPTG
      * SRI-OPS                             * MIS System       I
RPB
      * SRI-CONST                           *RSTS Operator   I
* SRI-OPS
        C. Grimes, OSP                       RIV File         l
* MIS System
                                                                '
.
l        H. Schierling,OSP                     L. Chandler, OGC
* SRI-CONST
        J. Lyons, OSP                       *D. Weiss, RM/ALF
*RSTS Operator
        CPPD-LA, OSP                         *P. Wagner, CPTG
C. Grimes, OSP
      *w/766
RIV File
                                                                i
l
H. Schierling,OSP
L. Chandler, OGC
'
J. Lyons, OSP
*D. Weiss, RM/ALF
CPPD-LA, OSP
*P. Wagner, CPTG
*w/766
i
.
.
                                                                i
i
                                                                i
i
l
l
                                                                J
J
}}
}}

Latest revision as of 11:16, 3 December 2024

Forwards Const Insp Repts 50-445/87-07 & 50-446/87-06 on 870301-0430.Certain Activities Appeared to Be in Violation of NRC Requirements.Enforcement Conference Scheduled for 870706 to Discuss Items
ML20216G403
Person / Time
Site: Comanche Peak  
Issue date: 06/25/1987
From: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20216G410 List:
References
NUDOCS 8707010084
Download: ML20216G403 (3)


See also: IR 05000445/1987007

Text

- - - ___

_ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _

.

>

l

!

jut 12 51987

!

In Reply Refer To:

Dockets:

50-445/87-07

3

50-446/87-06

l

l

TU Electric

ATTN:

Mr. W. G. Counsil

l

Executive Vice President

j

400 Ncrth Olive Street, Lock Box 81

!

Dallas, Texas

75201

l

!

Gentlemen:

This refers to the construction inspection conducted by Messrs.

l

!

D.

L. Kelley and P. C. Wagner of the Comanche Peak Project

Division during the period March 1 through April 30, 1987, of

activities authorized by NRC Construction Permits CPPR-126 and

,

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

l

and 2, and to the discussions of our findings with Mr. L. D. Nace

'

and other members of your staff during and at the conclusion of

the inspection.

j

Areas of construction examined during the inspection included the

l

installation of electrical penetration assemblies in Unit 1 and

Unit 2.

The inspection consisted of selective examination of

procedures and representative records, interviews with personnel,

and observation by the inspectors.

These findings are documented

in the enclosed inspection report.

During this inspection, certain of your activities appeared to be

in violation of NRC requirements.

These apparent violations are

being reviewed for potential escalated enforcement action.

An

enforcement conference to discuss the facts of these items has

been scheduled for July 6, 1987, at 2:00 pm in your conference

room.

You will be notified in subsequent correspondence as to

the resolution of these findings.

In accordance with 10 CFR'2.790 of the Commission's regulations,

a copy of this'1etter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Ad

RRd

crs yw

OFC:

OSP:CP: RI

OSP:CP:RI

OSP:CP:AD

OSP:CP:D

NAME:

DKe}le

PWagner

RWarnick

CGrimes

DATE:

6/p /87

6//6/87

6/7E/87

6/ M/87

f&s

l ()

70

o

e g

,

,

TU Eectric

-2-

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you..

,

,

Sincerely,

)

ORIGINAL SIGNED BY

.

C.

I. Grimes

-]

C.

I. Grimes, Director

Comanche Peak. Project

J

Division

Enclosure:

NRC Construction Inspection Report

50-445/87-07

50-446/87-06

cc w/ enclosure:

j

TU Electric

ATTN:

G.

S. Keeley, Manager,

Nuclear Licensing

i

'

Skyway Tower

400 North Olive Street

i

Lock Box 81

Dallas, Texas

75201

Juanita Ellis

President - CASE

1426 South Polk Street

)

Dallas, Texas

75224

'-

s

Renea Hicks

.

>

Assistant Attorney General

Environmental Protection. Division

P.O. Box 12548, Capitol Station

Austin, Texas

78711-2548

Administrative Judge Peter Bloch

j

U. S. Nuclear Regulatory Commission

Washington, D. C.

20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory.

P. O. Box X, Building 3500

Oak Ridge, Tennessee

37830

!

Dr. Kenneth A. McCollom

,

1107 West Knapp.

~

Stillwater, Oklahoma

74075

)

s

...'

.

i

TU Electric

-3-

Dr. Walter H. Jordan

Administrative Judge

881 West Outer Drive

Oak Ridge, Tennessee

37830

l

Anthony Roisman, Esq.

'

Suite 600

1401 New York Avenue NW

Washington, D.

C.

20005

Texas Radiation Control Program Director

Bureau of Radiation Control

Department-of Health

1100 West 49th

!

Austin, Texas

78756

1

4 bcc i...to; DMB:l(IE01);

bec distrib. by OSP:

CPTG

RPB

  • SRI-OPS
  • MIS System

.

  • SRI-CONST
  • RSTS Operator

C. Grimes, OSP

RIV File

l

H. Schierling,OSP

L. Chandler, OGC

'

J. Lyons, OSP

  • D. Weiss, RM/ALF

CPPD-LA, OSP

  • P. Wagner, CPTG
  • w/766

i

.

i

i

l

J