Operating Data Report -
Operating Data Report -
Docket No.         50-413 Date               Qctober 13.1999 Completed By       Rocer Williams Telephone           704-382-5346 l
Docket No.
Operating Status                                                                                                                   '
50-413 Date Qctober 13.1999 Completed By Rocer Williams Telephone 704-382-5346 Operating Status
: l. Unit Name:             Catawba 1
: l. Unit Name:
: 2. Reporting Period:     September 1,1999 - September 30, 1999
Catawba 1
: 3. Licensed Thermal Power (MWt):                                                       3411             Notes:
: 2. Reporting Period:
September 1,1999 - September 30, 1999
: 3. Licensed Thermal Power (MWt):
3411 Notes:
* Nameplate
* Nameplate
: 4. Nameplate Rating (Gross MWe):                                                       1305
: 4. Nameplate Rating (Gross MWe):
1305
* Rating (GrossMWe)
* Rating (GrossMWe)
: 5. Design Electrical Rating (Net Mwe):                                                 1145             calculated as 1450.000
: 5. Design Electrical Rating (Net Mwe):
: 6. Maximum Dependable Capacity (Gross MWe):                                           1192             MVA * .90 power
1145 calculated as 1450.000
: 7. Maximum Dependable Capacity (Net MWe):                                             1129             factor per Page ill, 0.
: 6. Maximum Dependable Capacity (Gross MWe):
1192 MVA *.90 power
: 7. Maximum Dependable Capacity (Net MWe):
1129 factor per Page ill, 0.
: 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
: 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,If Any (Net MWe):
: 9. Power Level To Which Restricted,If Any (Net MWe):
: 10. Reason for Restrictions,If any:
: 10. Reason for Restrictions,If any:
This Month       YTD             Cumulative
This Month YTD Cumulative
: 11. Hours in Reporting Period                                                         720.0       6551.0               124968.0
: 11. Hours in Reporting Period 720.0 6551.0 124968.0
: 12. Number of Hours Reactor was Critical                                             720.0       5797.1               100007.7
: 12. Number of Hours Reactor was Critical 720.0 5797.1 100007.7
: 13. Reactor Reserve Shutdown Hours                                                     0.0         0.0                       0.0 l   .14. Hours Generator On-Line                                                             720.0       5779.3                 98568.1
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l
: 15. Unit Reserve Shutdown Hours                                                         0.0         0.0                       0.0
.14. Hours Generator On-Line 720.0 5779.3 98568.1
: 16. Gross Thermal Energy Generated (MWH)                                           2433317   105447149             409705353
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 17. Gross Electrical Energy Generated (MWH)                                         868453     6914829               114649966
: 16. Gross Thermal Energy Generated (MWH) 2433317 105447149 409705353
: 18. Net Electrical Energy Generated (MWH)                                           823900     6548302               10799%69
: 17. Gross Electrical Energy Generated (MWH) 868453 6914829 114649966
: 19. Unit Service Factor                                                               100.0         88.2                     78.9 i     20. Unit Availability Factor                                                         100.0         88.2                     78.9
: 18. Net Electrical Energy Generated (MWH) 823900 6548302 10799%69
: 21. Unit Capacity Factor (Using MDC Net)                                             101.4         88.5                     76.4
: 19. Unit Service Factor 100.0 88.2 78.9 i
: 22. Unit Capacity Factor (Using DER Net)                                               99.9         87.3                     75.5
: 20. Unit Availability Factor 100.0 88.2 78.9
: 23. Unit Forced Outage Rate                                                             0.0         0.0                       6.9 l     24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
: 21. Unit Capacity Factor (Using MDC Net) 101.4 88.5 76.4
: 22. Unit Capacity Factor (Using DER Net) 99.9 87.3 75.5
: 23. Unit Forced Outage Rate 0.0 0.0 6.9 l
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
: 25. If Shutdown At End Of Report Period, Estimated Date of Startup
: 25. If Shutdown At End Of Report Period, Estimated Date of Startup
: 26. Units in Test Status (Prior to Commercial Operation)
: 26. Units in Test Status (Prior to Commercial Operation)
Forcast             Achieved Initial Criticality Initial Electricity Commercial Operation 9910220039 991013                                                                                 3A - 10/13/99 PDR    ADOCK 05000413 R                         PDR L
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 9910220039 991013 PDR ADOCK 05000413 3A - 10/13/99 R
PDR L


l                                                     _
l
      ,      ?
?
1.
1.
f o'                                                                                 m 3
o' m
1'                                                                                   1
f 3
:                                                                                   w e
1' 1w
g' t
:e t
a     -              ..
g' a
C P'                                                                                   3 e
P' C
c n                         m a
3 ec m
e                         r r
n a
r                         c u                      S
e r
                                                                          /
r c
c                         p n e                       i r    o R                         T iau  t t
ru S
n                      l a   n e
/
v                        ui   t e                         n n P
c p no e
r MC ao o                         - -                    _
ir R
t                                                   _
T i ta tn l
n                      2 4                       _
u a n ev ui t
o                                                 _
e n n r
i t                                                  _
a o P
c                              m A                                 a r
MC o
e                              c i
t n
v                            S t                              /)pn
2 4 o
-                                                &                            i ri m                            Tlap c                               C                               ixc d
itc m
d l o a       aE t
A ar e
n tm        (r n                   h u a                   t           oe e                   e a ut       h MMAO s
c v
u                                                  _
S it
9 9      a                  )     - - -                  -
/)pn iri m
9     C                     2
Tlap c
(   1     35 1           t r
c C
r.
ix d
e   de p o                                              .
aE t
S                           b       s e .
l d
nR o N                           a     e c n N t
o a m (r n
R     i W                                L ev O                           L           E D                           :
h u a
T                           H T
t n oe e
h U                           N fo/ X        t n             n H                           O     d R           o             o ho n i
e a ut t h MMAO su 9
S                                             M             t a
a
T                           M      t e o w                    n T                  e           i I
)
N                          R     Md
9 C
                                                )
2 9
t u
35
h t
(
m a
1 1
O     2 h                         x U                                ( S          r           E I'                 o             e E                 f             s         )             _
tro r.
R                                 n           n e         i a
d p e
c                                                 n           s           i c        l p
e S
o s          e           L             x a          g           /
b s e.
g        E e          a             n         ( )
nR o N
R           t u          in       e   roin
a e
                                                )
N t
iai     v                  _
c n W
1
R iL e O
(            O              r t rrl a                _
L vE D
T aEp   r         x r           r           _
T H
oi s t
h U
oE(         _
T f X t
N o/
n n
H O
d R o
o i
o n M
S t
M h
a w
n t
T e o e
i T
Md h
m IN R
t
)
u t
a U
O 2 h r
Ex I'
( S o
E f
e s
)
R n
n e
c c
ia n
s l
i o
e L
p
/
x s
g g
E ae a
n
(
)
R t
in e oi r n u
v O
iai r a
)
rl 1
r t
T aEp
(
r x
r r
t oE s
oi t
(
n t
n t
n tr              _
n ai a r o s
o sr                  .rai a r           e       _
.r r e i u o
ia u t            o             e pd meh pt r o uH         N            OA         OO D                           - - - -
e meh r
9_                                         BFGH 9     =
tr o N
9     = 6                   d 1
pd pt a
                            . . i a 4             de eul 3 ll    3 1
uH OA OO D
1  i  5-        e cr d a r     W             p o e                                             _
9_
e r 28                                  )
BFGH 9
h b t    w b e 3             TyF h c                     n a to e 4 -
=
i 4-                                  - S                a 0     a c a 0 t
9
F -                l p
= 6 d
5C       O R7                       S               x               n
1 a
                        . : : : :                                        E
4 d e l
l 3
e u i
3 1
l 5
e c d 1
i r
W p o e a
r 2
h b e
8 yF h
)
4 a o e 3 T
c n
w b r
t i
- S a
t t
e 4 F -
l 0
a c a 0 p
5C O R7 S
x n
E t
o
(
(
t s         o      _
s i
OEEYE i
OEEYE e
e t
e t
T           c
T c
_                NMTbN     A      O          :
NMTbN u r t
e                      l r
r i
u r
r A
_ia o i
O e
t r
_i o s
s     u TA EN DDE H         P        D t
u l
a                      f e c
TA DD H a
e r
f e r
y K
t a
CIT          TE                          .
e EN E P D
t n
c K T T E n n y
e na gro ON            EL                              :
t e a gr CI E L o
n   mel   n nt a
n nt n mel a ON L E y
DU            LE                              y r  o   p t el i
o i
u L
p DU L T el t
P T              .
r n
                                                                  , a s a
u s iuiu a
e q iuiu    n af eg e o                 m M            N                   m RE     MRR O                                u )      - - - -
a af g P
C                               S 1
m e q e e M
(   ABCD
o O
N m
RE MRR
)
u 1
ABCD C
S
(


MONTHLY REFUELING INFORMATION REOUEST
MONTHLY REFUELING INFORMATION REOUEST 1.
: 1.       Facility name:     Catawba Unit I                                                               !
Facility name:
: 2.       Scheduled next refueling shutdown: October 2000
Catawba Unit I 2.
: 3.       Scheduled restart following refueling: November 2000 l'
Scheduled next refueling shutdown: October 2000 3.
                  -THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
Scheduled restart following refueling: November 2000 l
                  ' THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.                                           !
-THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
: 4.       Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
' THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
                  - If yes, what will these be?
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
- If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
: 5.     ' Scheduled date(s) for submitting proposed licensing action and supporting information.
5.
: 6.       Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis Lethods, significant changes in design or new operating procedures).
' Scheduled date(s) for submitting proposed licensing action and supporting information.
9
6.
: 7.       Number of Fuel assemblies           (a)     in the core: 12,1 (b)     in the spent fuel pool: 214
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis Lethods, significant changes in design or new operating procedures).
          ~8.   . Present licensed fuel pool capacity: 1413 Size of requested or planned incre ase: =
9 7.
: 9.       Projected date of last refueling which can be accommodated by present license capacity:
Number of Fuel assemblies (a) in the core: 12,1 (b) in the spent fuel pool: 214
November 2009 DUKE POWER COMPANY                                     DATE: October 13.1999 Name of
~8.
. Present licensed fuel pool capacity: 1413 Size of requested or planned incre ase: =
9.
Projected date of last refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: October 13.1999 Name of


==Contact:==
==Contact:==
R. A. Williams           Phone: (704)- 382-5346
R. A. Williams Phone: (704)- 382-5346


                  ,                                              Operating Data Report'-
Operating Data Report'-
Docket No.         50-414 Date               October 13.1990 Completed By       Roger Williams Telephone           704-382-5346 ODerating Status
Docket No.
: 1. Unit Name:               Catawba 2 -
50-414 Date October 13.1990 Completed By Roger Williams Telephone 704-382-5346 ODerating Status
: 2. Reporting Period:     - September 1,1999 - September 30, 1999
: 1. Unit Name:
: 3. Licensed Thermal Power (MWt):                                                       3411 Notes:
Catawba 2 -
: 2. Reporting Period:
- September 1,1999 - September 30, 1999
: 3. Licensed Thermal Power (MWt):
3411 Notes:
* Nameplate
* Nameplate
: 4. Nameplate Rating (Gross MWe):                                                       1305
: 4. Nameplate Rating (Gross MWe):
1305
* Rating (GrossMWe)
* Rating (GrossMWe)
: 5. Design Electrical Rating (Net Mwe):                                                 1145             calculated as 1450.000
: 5. Design Electrical Rating (Net Mwe):
              '6. Maximum Dependable Capacity (Gross MWe):                                             1192             MVA * .90 power
1145 calculated as 1450.000
    'I
'6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe)':                                             1129             factor per Page 111,
1192 MVA *.90 power
              ' 8. If Changes'Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
: 7. Maximum Dependable Capacity (Net MWe)':
: 29. Power level To Which Restricted, If Any (Net MWe):
1129 factor per Page 111,
: 10. Reason for Restrictions,If any:                                                                                                 1 This Month       YTD             Cumulative
'I
: 11. Hours in Reporting Period                                                         720.0       6551.0                 114984.0
' 8. If Changes'Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
: 12. Number of Hours Reactor was Critical                                             720.0       5616.1                 93343.2
2. Power level To Which Restricted, If Any (Net MWe):
: 13. Reactor Reserve Shutdown Hours                                                       0.0         0.0                       0.0 14; Hours Generator On-Line                                                           720.0       5548.4                 92001.3
9
: 15. Unit Reserve Shutdown Hears                                                         0.0         0.0                       0.0
: 10. Reason for Restrictions,If any:
            - 16. Gross Thermal Energy Generated (MWH)                                             2449543   124247777               405797712
1 This Month YTD Cumulative
: 17. Gross Electrical Energy Generated (MWH)                                         878259     6746528               106802234 L 18. Net Electrical Energy Generated (MWH)                                             834972     6373085               100774705
: 11. Hours in Reporting Period 720.0 6551.0 114984.0
: 19. Unit Service Factor                                                               100.0         84,7                     80.0
: 12. Number of Hours Reactor was Critical 720.0 5616.1 93343.2
: 20. Unit Availability Factor                                                           100.0         84.7                     80.0 21, Unit Capacity Factor (Using MDC Net)                                               102.7         86.2                     77.5   l
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14; Hours Generator On-Line 720.0 5548.4 92001.3
: 22. Unit Capacity Factor (Using DER Net)                                               101.3         85.0                     76.5   l
: 15. Unit Reserve Shutdown Hears 0.0 0.0 0.0
            '23. Unit Forced Outage Rate                                                               0.0         15.3                       8.1
- 16. Gross Thermal Energy Generated (MWH) 2449543 124247777 405797712
: 17. Gross Electrical Energy Generated (MWH) 878259 6746528 106802234 L 18. Net Electrical Energy Generated (MWH) 834972 6373085 100774705
: 19. Unit Service Factor 100.0 84,7 80.0
: 20. Unit Availability Factor 100.0 84.7 80.0 21, Unit Capacity Factor (Using MDC Net) 102.7 86.2 77.5
: 22. Unit Capacity Factor (Using DER Net) 101.3 85.0 76.5
'23. Unit Forced Outage Rate 0.0 15.3 8.1
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
            . 25. If Shutdown A' t End Of Report Period, Estimated Date of Startup
. 25. If Shutdown A' t End Of Report Period, Estimated Date of Startup
: 26. Units in Test Status (Prior to Commercial Operation)
: 26. Units in Test Status (Prior to Commercial Operation)
Forcas:               Achieved Initial Criticality                                                               ,
Forcas:
Initial Electricity -                                                               *
Achieved Initial Criticality Initial Electricity -
                                          ' Commercial Operation 3A - 10/13/99 1
' Commercial Operation 3A - 10/13/99 1
    -i 8
-i 8
      .i 1
.i 1


1 9
1 9
f                                                                               9 o                                                                               /
f 9
3 I
o
I                                                                               /
/3 I
:                                                                               0 e
I
g 1
/0
a       .        '
:e 1
C P                                                                               3 e
g a
c                         m n                         a e
P C
3 ec m
n a
e r
r c
ru S
/
e ip n c
o r i R
T a t
t u
n la n e
ui v
t e
n n r
a o
P MC o
tn 2 4 io tc m
A ar e
c v
S i
/p )n t
i ri a
Tl p c
C i x d
aE t
d o a l
m (r n
h u a
t n oe e
e a ut t h MMAO su 9
a
)
9 C
2
(
1 35 9
1 tr o
r d p e
e
.S b
s e.
nR o N
m e
N t
c n W
m iL ev
.G i
E u
r H
h
..U T
f X t
N o/
n n
H O
d R o
o i
M o n
.S M
h ta w
n t
T e o e
i T
Md h
m IN R
t
)
u t
a U
O 2 h r
E x
P
( S o
E f
es
)
R n
n e
i c
a n
s l
i o
e L
p
/
x s
g g
E ae a
n
(
)
R t
i r n u
n e oi v
O ia
)
r a i r l 1
r t
T aE p
(
r x
r r
r r
r                        c u                      S/
t oE s
c                      ip n e                                o R                            r i T au    t t
oi n a (r t
n                       l a    n e
n ta o s r ir e
v                          ui    t e                         n no P
u o
t r
e meh i r ta pd pt r o N
o a
uH OA OO D
MC - -
9 EFGH 9
n                      2 4 io t
s 9
c                                m               -
m 6 d
A                                  ar e                               c i
1 a
v                              S t
e i
                                                                      /
4 d
i p )n              _
l 3
ri C
l 3
                                        -                            Tl ap ic x d
e u 2
d l o a        aE t
a i
n a                  ht u         m (r n toe e                    e a ut        h              _
5 e c d l
9 s
1 r
u a
W p o e 2
MMAO
r 4
                                                            )      - - -
b e
9  C                    2                              _
8 yF h
9                        (  1 35                      -
)
1        tr de p o r
w b r
e    s  e .
T c
        .S                      b     nR o N                      m    e c n N t
n a o e 3
W                      m i
1 i
L ev
- S a
      .G i        E u                      :
M t
r                     H                h
t e 4 F -
      ..U                        T   fo/ X        t n
l a
N                              n H                      O  d R          o             o ho n i
c o 0 p
      .S                         M               M              t a
5CO R7 S
n T                            e ow t
x n
T                e           i                          _
(
I N                      R  Md
                                      )
t u
h t
m a                        .
O                              x U                          2 h          r          E P
E
E
( S f
o            e s        )
R                              n          n e        i a
n                        c o          s .
i L
l p
s            e g          /            x a
e            a g
n        E
(    )
R            t u
i n ev oi    r n
                                      )                        ia            r a 1
(            O              r i r l T aE t
r p      x r          r oi s t
oE n
o s t
a      n a (r t
i r t
a    u      o r ir e
pd pt  meh e r o        N            OA          OO uH                          - - - -
9              D 9      s                                  EFGH 9      m 6              d 1
                        . i a 4          d  l e
2  3    l l
3 5-e u 1    i e cr d a r W      2      p o e                    )
4  b    e      8      yF h c                    n w b r 3          T a to e 1                                                i
                                            - S                  a e 4-M
(
(
t a c o 0                F -
s io t
S l
OEEYE eT c
p 5CO        R7                                  E x
e t
t n
NMTBN r
                . : : : :                                      (        s      io OEEYE                                             eT e       t c
ir u r t
NMTBN A       O e                       l r
A O
u r o
e l
TA DD H a
f e r
o s
i t
i t
r s
a e
TA EN DD          H i
EN E P D
t a                       fa e e
c K T T E agr t
r K          EP        D                                 c         y CIT t
y n n CI E L e
TE                                    n e agr n         o ON          E   L                         :
o nnt n melia ON L E y
n melia     nnt DU          LE                            y o p t n u ug el L
o p t el D U L T a
P T           .
a iuiaf g r
a s a
s n u u P
e q iuiaf        e   e o                 m M          N                   m RE-MRR O                              u )          - - -
m e q e e M
_                        C                             S 1
o O
(   ABCD
N m
RE MRR
)
u 1
ABCD C
S
(


r 4
r 4
MONTHLY REFUELING INFORMATION REOUEST
MONTHLY REFUELING INFORMATION REOUEST 1.
: 1.       Facility name:     Catawba Unit 2
Facility name:
: 2.       Scheduled next refueling shutdown: March 2000
Catawba Unit 2 2.
: 3.       Scheduled restart following refueling: Aoril 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COM.MUNICATION OF                               ,
Scheduled next refueling shutdown: March 2000 3.
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4                                     I THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
Scheduled restart following refueling: Aoril 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COM.MUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 I
4,       Will refueling or resumption of operation thereafter require a technical specification change or
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
                        . other license amendment?
4, Will refueling or resumption of operation thereafter require a technical specification change or
. other license amendment?
If yes, what will these be?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unresiewed safety questions?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unresiewed safety questions?
: 5.       Scheduled date(s) for submitting proposed licensing action and supporting information.
5.
: 6.       Impottant licensing considerations (new or different design or supplier, unreviewed design or perform.mce analysis methods, significant changes in design or new operating procedures).
Scheduled date(s) for submitting proposed licensing action and supporting information.
7..     Number of Fuel assemblies             (a)     in the core: 191 (b)     in the spent fuel pool: f 84
6.
: 8.     Present licensed fuel pool capacity: 141g Size of requested or planned increase: -.::
Impottant licensing considerations (new or different design or supplier, unreviewed design or perform.mce analysis methods, significant changes in design or new operating procedures).
              . 9. '     Projected date of last refueling which can be accommodated by present license capacity:
7..
                        ' May 2012 DUKE POWER COMPANY                                     DATE: October 13.1999 Name of
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: f 84 8.
Present licensed fuel pool capacity: 141g Size of requested or planned increase: -.::
. 9. '
Projected date of last refueling which can be accommodated by present license capacity:
' May 2012 DUKE POWER COMPANY DATE: October 13.1999 Name of


==Contact:==
==Contact:==
R. A. Williams             Phone: (~704b 382-5346 1
R. A. Williams Phone: (~704b 382-5346 1
                                                                      .                                                  l 2.}}
l 2.}}

Latest revision as of 08:37, 3 December 2024

Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2
ML20217H020
Person / Time
Site: Catawba  
Issue date: 09/30/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20217H008 List:
References
NUDOCS 9910220039
Download: ML20217H020 (6)


Text

_

Operating Data Report -

Docket No.

50-413 Date Qctober 13.1999 Completed By Rocer Williams Telephone 704-382-5346 Operating Status

l. Unit Name:

Catawba 1

2. Reporting Period:

September 1,1999 - September 30, 1999

3. Licensed Thermal Power (MWt):

3411 Notes:

  • Nameplate
4. Nameplate Rating (Gross MWe):

1305

  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe):

1145 calculated as 1450.000

6. Maximum Dependable Capacity (Gross MWe):

1192 MVA *.90 power

7. Maximum Dependable Capacity (Net MWe):

1129 factor per Page ill, 0.

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reason for Restrictions,If any:

This Month YTD Cumulative

11. Hours in Reporting Period 720.0 6551.0 124968.0
12. Number of Hours Reactor was Critical 720.0 5797.1 100007.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l

.14. Hours Generator On-Line 720.0 5779.3 98568.1

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2433317 105447149 409705353
17. Gross Electrical Energy Generated (MWH) 868453 6914829 114649966
18. Net Electrical Energy Generated (MWH) 823900 6548302 10799%69
19. Unit Service Factor 100.0 88.2 78.9 i
20. Unit Availability Factor 100.0 88.2 78.9
21. Unit Capacity Factor (Using MDC Net) 101.4 88.5 76.4
22. Unit Capacity Factor (Using DER Net) 99.9 87.3 75.5
23. Unit Forced Outage Rate 0.0 0.0 6.9 l
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 9910220039 991013 PDR ADOCK 05000413 3A - 10/13/99 R

PDR L

l

?

1.

o' m

f 3

1' 1w

e t

g' a

P' C

3 ec m

n a

e r

r c

ru S

/

c p no e

ir R

T i ta tn l

u a n ev ui t

e n n r

a o P

MC o

t n

2 4 o

itc m

A ar e

c v

S it

/)pn iri m

Tlap c

c C

ix d

aE t

l d

o a m (r n

h u a

t n oe e

e a ut t h MMAO su 9

a

)

9 C

2 9

35

(

1 1

tro r.

d p e

e S

b s e.

nR o N

a e

N t

c n W

R iL e O

L vE D

T H

h U

T f X t

N o/

n n

H O

d R o

o i

o n M

S t

M h

a w

n t

T e o e

i T

Md h

m IN R

t

)

u t

a U

O 2 h r

Ex I'

( S o

E f

e s

)

R n

n e

c c

ia n

s l

i o

e L

p

/

x s

g g

E ae a

n

(

)

R t

in e oi r n u

v O

iai r a

)

rl 1

r t

T aEp

(

r x

r r

t oE s

oi t

(

n t

n ai a r o s

.r r e i u o

e meh r

tr o N

pd pt a

uH OA OO D

9_

BFGH 9

=

9

= 6 d

1 a

4 d e l

l 3

e u i

3 1

l 5

e c d 1

i r

W p o e a

r 2

h b e

8 yF h

)

4 a o e 3 T

c n

w b r

t i

- S a

t t

e 4 F -

l 0

a c a 0 p

5C O R7 S

x n

E t

o

(

s i

OEEYE e

e t

T c

NMTbN u r t

r i

r A

O e

_i o s

u l

TA DD H a

f e r

t a

e EN E P D

c K T T E n n y

t e a gr CI E L o

n nt n mel a ON L E y

o i

p DU L T el t

r n

u s iuiu a

a af g P

m e q e e M

o O

N m

RE MRR

)

u 1

ABCD C

S

(

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

Catawba Unit I 2.

Scheduled next refueling shutdown: October 2000 3.

Scheduled restart following refueling: November 2000 l

-THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

' THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

- If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

' Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis Lethods, significant changes in design or new operating procedures).

9 7.

Number of Fuel assemblies (a) in the core: 12,1 (b) in the spent fuel pool: 214

~8.

. Present licensed fuel pool capacity: 1413 Size of requested or planned incre ase: =

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: October 13.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

Operating Data Report'-

Docket No.

50-414 Date October 13.1990 Completed By Roger Williams Telephone 704-382-5346 ODerating Status

1. Unit Name:

Catawba 2 -

2. Reporting Period:

- September 1,1999 - September 30, 1999

3. Licensed Thermal Power (MWt):

3411 Notes:

  • Nameplate
4. Nameplate Rating (Gross MWe):

1305

  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe):

1145 calculated as 1450.000

'6. Maximum Dependable Capacity (Gross MWe):

1192 MVA *.90 power

7. Maximum Dependable Capacity (Net MWe)':

1129 factor per Page 111,

'I

' 8. If Changes'Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

2. Power level To Which Restricted, If Any (Net MWe):

9

10. Reason for Restrictions,If any:

1 This Month YTD Cumulative

11. Hours in Reporting Period 720.0 6551.0 114984.0
12. Number of Hours Reactor was Critical 720.0 5616.1 93343.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14; Hours Generator On-Line 720.0 5548.4 92001.3
15. Unit Reserve Shutdown Hears 0.0 0.0 0.0

- 16. Gross Thermal Energy Generated (MWH) 2449543 124247777 405797712

17. Gross Electrical Energy Generated (MWH) 878259 6746528 106802234 L 18. Net Electrical Energy Generated (MWH) 834972 6373085 100774705
19. Unit Service Factor 100.0 84,7 80.0
20. Unit Availability Factor 100.0 84.7 80.0 21, Unit Capacity Factor (Using MDC Net) 102.7 86.2 77.5
22. Unit Capacity Factor (Using DER Net) 101.3 85.0 76.5

'23. Unit Forced Outage Rate 0.0 15.3 8.1

24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)

. 25. If Shutdown A' t End Of Report Period, Estimated Date of Startup

26. Units in Test Status (Prior to Commercial Operation)

Forcas:

Achieved Initial Criticality Initial Electricity -

' Commercial Operation 3A - 10/13/99 1

-i 8

.i 1

1 9

f 9

o

/3 I

I

/0

e 1

g a

P C

3 ec m

n a

e r

r c

ru S

/

e ip n c

o r i R

T a t

t u

n la n e

ui v

t e

n n r

a o

P MC o

tn 2 4 io tc m

A ar e

c v

S i

/p )n t

i ri a

Tl p c

C i x d

aE t

d o a l

m (r n

h u a

t n oe e

e a ut t h MMAO su 9

a

)

9 C

2

(

1 35 9

1 tr o

r d p e

e

.S b

s e.

nR o N

m e

N t

c n W

m iL ev

.G i

E u

r H

h

..U T

f X t

N o/

n n

H O

d R o

o i

M o n

.S M

h ta w

n t

T e o e

i T

Md h

m IN R

t

)

u t

a U

O 2 h r

E x

P

( S o

E f

es

)

R n

n e

i c

a n

s l

i o

e L

p

/

x s

g g

E ae a

n

(

)

R t

i r n u

n e oi v

O ia

)

r a i r l 1

r t

T aE p

(

r x

r r

t oE s

oi n a (r t

n ta o s r ir e

u o

e meh i r ta pd pt r o N

uH OA OO D

9 EFGH 9

s 9

m 6 d

1 a

e i

4 d

l 3

l 3

e u 2

a i

5 e c d l

1 r

W p o e 2

r 4

b e

8 yF h

)

w b r

T c

n a o e 3

1 i

- S a

M t

t e 4 F -

l a

c o 0 p

5CO R7 S

x n

(

E

(

s io t

OEEYE eT c

e t

NMTBN r

ir u r t

A O

e l

TA DD H a

f e r

o s

i t

a e

EN E P D

c K T T E agr t

y n n CI E L e

o nnt n melia ON L E y

o p t el D U L T a

a iuiaf g r

s n u u P

m e q e e M

o O

N m

RE MRR

)

u 1

ABCD C

S

(

r 4

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

Catawba Unit 2 2.

Scheduled next refueling shutdown: March 2000 3.

Scheduled restart following refueling: Aoril 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COM.MUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 I

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4, Will refueling or resumption of operation thereafter require a technical specification change or

. other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unresiewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Impottant licensing considerations (new or different design or supplier, unreviewed design or perform.mce analysis methods, significant changes in design or new operating procedures).

7..

Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: f 84 8.

Present licensed fuel pool capacity: 141g Size of requested or planned increase: -.::

. 9. '

Projected date of last refueling which can be accommodated by present license capacity:

' May 2012 DUKE POWER COMPANY DATE: October 13.1999 Name of

Contact:

R. A. Williams Phone: (~704b 382-5346 1

l 2.