ML20234E718: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:!
{{#Wiki_filter:,
,
I
                                                                                              I
l
                                                                                              I
JUN 2 91987
                                                                                              l
'
'
                                                JUN 2 91987                                  l
l
                                                                                              l
i
                                                                                              i
Docket No. 50-213
        Docket No. 50-213                                                                     i
i
        Connecticut Yankee Atomic Power Company
Connecticut Yankee Atomic Power Company
        ATTN: Mr. E. J. Mroczka
ATTN: Mr. E. J. Mroczka
                Senior Vice President - Nuclear
Senior Vice President - Nuclear
                Engineering and Operations Group
Engineering and Operations Group
        P. O. Box 270
P. O. Box 270
        Hartford, Connecticut 06141
Hartford, Connecticut 06141
        Gentlemen:
Gentlemen:
        Subject:   Inspection Report No. 50-213/87-10
Subject:
        This refers to the special, safety inspection conducted by Mr. J. Prell of this
Inspection Report No. 50-213/87-10
        office and Office of Nuclear Reactor Regulation personnel and consultants on
This refers to the special, safety inspection conducted by Mr. J. Prell of this
        April 13-17, 1987, of activities authorized by NRC License No. DPR-61 and to
office and Office of Nuclear Reactor Regulation personnel and consultants on
        the discussions of our findings held by Mr. Prell with Mr. D. Miller Jr. of
April 13-17, 1987, of activities authorized by NRC License No. DPR-61 and to
        your staff at the conclusion of the inspection.
the discussions of our findings held by Mr. Prell with Mr. D. Miller Jr. of
        Areas examined during this inspection are -described in the NRC Region I             l
your staff at the conclusion of the inspection.
        Inspection Report which is enclosed with this letter. Within these areas, the
Areas examined during this inspection are -described in the NRC Region I
        inspection consisted of selective examinations of procedures and representative
l
        records, interviews with personnel, and observations by the inspector.
Inspection Report which is enclosed with this letter. Within these areas, the
        Within the scope of this inspection, no violations were observed. However, one
inspection consisted of selective examinations of procedures and representative
        activity appears to be a deviation from a Connecticut Yankee Atomic Power
records, interviews with personnel, and observations by the inspector.
        Company (CYAPCO) commitment to adhere to the emergency operating Procedures
Within the scope of this inspection, no violations were observed. However, one
        Generation Package (PGP) in developing your emergency operating procedures
activity appears to be a deviation from a Connecticut Yankee Atomic Power
        (EOPs). As a result of failing to follow the writers guide portion of the PGP,
Company (CYAPCO) commitment to adhere to the emergency operating Procedures
        numerous inconsistencies with the PGP were found in procedural steps of the
Generation Package (PGP) in developing your emergency operating procedures
        E0Ps. Many of these inconsistencies resulted in the E0Ps not clearly stating
(EOPs). As a result of failing to follow the writers guide portion of the PGP,
        what actions were being required of the operators. You are requested to
numerous inconsistencies with the PGP were found in procedural steps of the
        respond to this letter within 30 days of receipt. In preparing your response
E0Ps. Many of these inconsistencies resulted in the E0Ps not clearly stating
        you should follow the instructions contained in Appendix A.
what actions were being required of the operators.
        Your cooperation with us in this matter is appreciated.
You are requested to
                                                  Sincerely,
respond to this letter within 30 days of receipt.
                                                          ULUn1 Cignea py;*
In preparing your response
                                                          Tetcy ;7, Egoy
you should follow the instructions contained in Appendix A.
                                                  William V. Johnston, Acting Director
Your cooperation with us in this matter is appreciated.
                                                  Division of Reactor Safety
Sincerely,
        Enclosures:
ULUn1 Cignea py;*
        1.   Appendix A, Notice of Deviation                                         4
Tetcy ;7, Egoy
        2.   NRC Region I Inspection Report No. 50-213/87-10                         k[g\
William
                                  0FFICIAL RECORD COPY       IR HADDAM NECK 87-10 - 0001.0.0
V.
  g 70 $ $ $70629
Johnston, Acting Director
                500     3                                     6/19/87
Division of Reactor Safety
  O
Enclosures:
4k[g\\
1.
Appendix A, Notice of Deviation
2.
NRC Region I Inspection Report No. 50-213/87-10
0FFICIAL RECORD COPY
IR HADDAM NECK 87-10 - 0001.0.0
g 70 $ $ $70629
500
3
6/19/87
O


.                                                                                       l
.
. Connecticut Yankee Atomic Power Co.     2
Connecticut Yankee Atomic Power Co.
                                                                                        i
2
                                                                                        l
.
  cc w/ encl:
i
  D. B. Miller, Station Superintendent
cc w/ encl:
  D. O. Nordquist, Manager of Quality Assurance                                       q
D. B. Miller, Station Superintendent
  R. M. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Manager of Quality Assurance
  W. D. Romberg, Vice President, Nuclear Operations                                   -
q
  Gerald Garfield, Esquire
R. M. Kacich, Manager, Generation Facilities Licensing
  Public Document Room (PDR)                                                           !
W. D. Romberg, Vice President, Nuclear Operations
  Local Public Document Room (LPDR)
-
  Nuclear Safety Information Center (NSIC)
Gerald Garfield, Esquire
  NRC Resident Inspector
Public Document Room (PDR)
  State of Connecticut
Local Public Document Room (LPDR)
  bec w/ encl:
Nuclear Safety Information Center (NSIC)
  Region I Docket Room (with concurrences)
NRC Resident Inspector
  Management Assistant, DRM.A (w/o encl                                             '
State of Connecticut
  Section Chief, DRP
bec w/ encl:
  M. McBride, RI, Pilgrim
Region I Docket Room (with concurrences)
  J. Shedlosky, SRI, Millstone 1&2
Management Assistant, DRM.A (w/o encl
  T. Rebelowski, SRI, Millstone 3
'
  J. Akstulewicz, LPM, NRR
Section Chief, DRP
  R. Bores, DRSS
M. McBride, RI, Pilgrim
  r       h/ms       B1 mberg               th
J. Shedlosky, SRI, Millstone 1&2
  6/d87               6/fj87         6/>$/87
T. Rebelowski, SRI, Millstone 3
                            0FFICIAL RECORD COPY   IR HADDAM NECK 87-10 - 0001.1.0     j
J. Akstulewicz, LPM, NRR
                                                    06/03/87
R. Bores, DRSS
                                                                                        l
r
                                      .
h/ms
                                                          . .
B1 mberg
                                                                                    }
th
6/d87
6/fj87
6/>$/87
0FFICIAL RECORD COPY
IR HADDAM NECK 87-10 - 0001.1.0
j
06/03/87
l
.
. .
}
}}
}}

Latest revision as of 06:36, 3 December 2024

Forwards Insp Rept 50-213/87-10 on 870413-17 & Notice of Deviation.No Violations Noted.Deviation from Commitment to Adhere to Emergency Operating Procedures Generation Package in Developing Emergency Operating Procedures Noted
ML20234E718
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/29/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20234E721 List:
References
NUDOCS 8707070657
Download: ML20234E718 (2)


See also: IR 05000213/1987010

Text

,

I

l

JUN 2 91987

'

l

i

Docket No. 50-213

i

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141

Gentlemen:

Subject:

Inspection Report No. 50-213/87-10

This refers to the special, safety inspection conducted by Mr. J. Prell of this

office and Office of Nuclear Reactor Regulation personnel and consultants on

April 13-17, 1987, of activities authorized by NRC License No. DPR-61 and to

the discussions of our findings held by Mr. Prell with Mr. D. Miller Jr. of

your staff at the conclusion of the inspection.

Areas examined during this inspection are -described in the NRC Region I

l

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed. However, one

activity appears to be a deviation from a Connecticut Yankee Atomic Power

Company (CYAPCO) commitment to adhere to the emergency operating Procedures

Generation Package (PGP) in developing your emergency operating procedures

(EOPs). As a result of failing to follow the writers guide portion of the PGP,

numerous inconsistencies with the PGP were found in procedural steps of the

E0Ps. Many of these inconsistencies resulted in the E0Ps not clearly stating

what actions were being required of the operators.

You are requested to

respond to this letter within 30 days of receipt.

In preparing your response

you should follow the instructions contained in Appendix A.

Your cooperation with us in this matter is appreciated.

Sincerely,

ULUn1 Cignea py;*

Tetcy ;7, Egoy

William

V.

Johnston, Acting Director

Division of Reactor Safety

Enclosures:

4k[g\\

1.

Appendix A, Notice of Deviation

2.

NRC Region I Inspection Report No. 50-213/87-10

0FFICIAL RECORD COPY

IR HADDAM NECK 87-10 - 0001.0.0

g 70 $ $ $70629

500

3

6/19/87

O

.

Connecticut Yankee Atomic Power Co.

2

.

i

cc w/ encl:

D. B. Miller, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

q

R. M. Kacich, Manager, Generation Facilities Licensing

W. D. Romberg, Vice President, Nuclear Operations

-

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRM.A (w/o encl

'

Section Chief, DRP

M. McBride, RI, Pilgrim

J. Shedlosky, SRI, Millstone 1&2

T. Rebelowski, SRI, Millstone 3

J. Akstulewicz, LPM, NRR

R. Bores, DRSS

r

h/ms

B1 mberg

th

6/d87

6/fj87

6/>$/87

0FFICIAL RECORD COPY

IR HADDAM NECK 87-10 - 0001.1.0

j

06/03/87

l

.

. .

}