ML20235F603: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
{{#Wiki_filter:r-_______,_
{{#Wiki_filter:r-_______,_
s
s
  .F       .
.F In-Reply Refer To:
In-Reply Refer To:                         SEP 21 gg7 Dockets: 50-445                                                                 4 50-445 I
SEP 21 gg7 4
TU Electric                                                                     )
Dockets:
ATTN: Mr. W. G. Counsil                                                         )
50-445 50-445 I
Executive Vice President                                               1 400 North Olive, L.B. 81                                                         l Dallas, Texas       75201 Gentlemen:
)
4 This refers to the meeting conditcted at Region IV's request in the               )
TU Electric ATTN:
NRC Region IV office on September 4, 1987. This related to                     {
Mr. W. G.
activities authorized by NRC Construction Permits CPPR-126 and                 j CPPR-127 for Comanche Peak Steam Electric Station, Units 1 and 2.                 j Those persons in attendance are identified in Enclosure 1 to this                 j letter.
Counsil
The meeting was held to discuss Region IV's pre-operational inspection experience in the security program area and how this                   ,
)
experience might be applied to the Comanche Peak effort. Topics of             j discussion were based on the 81000 series inspection procedures                 {'
Executive Vice President 1
400 North Olive, L.B. 81 l
Dallas, Texas 75201 Gentlemen:
4 This refers to the meeting conditcted at Region IV's request in the
)
NRC Region IV office on September 4, 1987.
This related to
{
activities authorized by NRC Construction Permits CPPR-126 and j
CPPR-127 for Comanche Peak Steam Electric Station, Units 1 and 2.
j Those persons in attendance are identified in Enclosure 1 to this j
letter.
The meeting was held to discuss Region IV's pre-operational inspection experience in the security program area and how this experience might be applied to the Comanche Peak effort.
Topics of j
discussion were based on the 81000 series inspection procedures
{
identified in Chapter 2513 of the NRC Inspection Manual.
identified in Chapter 2513 of the NRC Inspection Manual.
It is our opinion that this meeting was beneficial and has provided a better understanding of NRC requiations and requirements in the area of security programs. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
It is our opinion that this meeting was beneficial and has provided a better understanding of NRC requiations and requirements in the area of security programs.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely, dRIGINAL stGNED BY R. F. WAI' NICK R. F. Warnick, Assistant Director for Inspection Programs Comanche Peak Projr-ct Division office of Special Projects
Sincerely, dRIGINAL stGNED BY R. F. WAI' NICK R.
F. Warnick, Assistant Director for Inspection Programs Comanche Peak Projr-ct Division office of Special Projects


==Enclosure:==
==Enclosure:==
As stated D:DRSS C:RPB AD:OSPjera>
diTdtlV-3't
.L an RLBangart JEGagliardo RFWarnick
/
/87
/
/87 7/ 1/87 9/2//87 9 / ri/87 pu ewaA wh t i.r c u nal w W Jm eay t h.J e ~
gY t/ /n Rnt]
Vqr7 RRd 8709290229 870921 PDR ADOCK 05000445 G
PDR 1


As stated
I
                                    .          D:DRSS        C:RPB              AD:OSPjera>
$ p ENCLOSURE 1 LIST OF ATTENDEES Attendance at the TU Electric - NRC meeting on Septeitber 4,1987, at the NRC Region IV office.
diTdtlV-3't  .L    an    RLBangart      JEGagliardo        RFWarnick
I TU ELECTRIC B. T. - Lancaster, Manager, Plant Support Andrew J. Scogin, Security Manager 4
                /  /87              /    /87  7/ 1/87        9/2//87            9 / ri/87 pu ewaA wh    t i.r c u nal w W Jm        eay t h.J e ~
J.
gY t/ /n Rnt]      Vqr7 RRd 8709290229 870921 PDR    ADOCK 05000445 G                  PDR 1
C. Hicks, Licensing Engineer Janardan Amin, CPE, Senior Computer Applications Engineer Jim Britt, Security Representative Zoltan Gajak, Project Security System Coordinator l
 
J. R. Gallman,. Supervisor, Engineering Analysis I
            $ p             I ENCLOSURE 1 LIST OF ATTENDEES Attendance at the TU Electric - NRC meeting on Septeitber 4,1987, at the NRC Region IV office.
David P. Lowry, System Engineer M. L. Lucas, Engineering' Supervisor q
I' TU ELECTRIC B. T. - Lancaster, Manager, Plant Support Andrew J. Scogin, Security Manager                                   4 J. C. Hicks, Licensing Engineer Janardan Amin, CPE, Senior Computer Applications Engineer Jim Britt, Security Representative Zoltan Gajak, Project Security System Coordinator                   l J. R. Gallman,. Supervisor, Engineering Analysis                     I David P. Lowry, System Engineer M. L. Lucas, Engineering' Supervisor                                 q W. R. Parks, Burns, Project Manager C. W. Rickgauer, Engineering Supervisor John Rumsey, Security B. Southam, Plant Security Supervisor B. W. Wieland, I&C Manager NRC, REGION IV R. L. Bangart, Director, Division of Radiation Safety and Safeguards R. F. Warnick, Assistant Director for Inspection Programs L. A.-Yandell, Chief, Radiological Protection and Safeguards Branch J. A. F. Kelly, Senior Physical Security Specialist R. A. Caldwell, Physical Security Specialist A. B. Earnest, Physical Security Specialist D. L. Kelley, Senior Resident Inspector (OPS) l I
W.
R. Parks, Burns, Project Manager C. W. Rickgauer, Engineering Supervisor John Rumsey, Security B.
Southam, Plant Security Supervisor B. W. Wieland, I&C Manager NRC, REGION IV R.
L. Bangart, Director, Division of Radiation Safety and Safeguards R. F. Warnick, Assistant Director for Inspection Programs L. A.-Yandell, Chief, Radiological Protection and Safeguards Branch J. A.
F. Kelly, Senior Physical Security Specialist R. A. Caldwell, Physical Security Specialist A.
B.
Earnest, Physical Security Specialist D. L. Kelley, Senior Resident Inspector (OPS) l I
I l
I l
l
l
                                                                                                    )
)
i l
i l
l L______--__-----
l L______--__-----


c     ..
c 4f o
o                      UNITED STATES 4f                                            g
UNITED STATES g
      !                                          . n-          NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION n-E.
    .$'                                              E.                 WASHINGTON, D, C. 20555
WASHINGTON, D, C. 20555
    ' \y                                       j#                                                                           o
' \\y j#
                ...e.                                                                   SEP 21 1987
...e.
                                                                                                                              -l L
SEP 21 1987 o
l                                             In' Reply Refer To:
-l L
1 Dockets:     50-445 50-446 l
l In' Reply Refer To:
TU Electric LATTN:     Mr. W. G. Counsil Executive Vice President 400 North Olive, L.B. 81 Dallas, Texas       75201                                                       l l
1 Dockets:
Gentlemen:
50-445 50-446 l
This refers to the meeting conducted in the NRC Region IV office on l                                             September 4, 1987, relating to-activities authorized by NRC l-                                             Construction Permits CPPR-126 and CPPR-127 for Comanche Peak Steam l                                             Electric Station, Units 1 and 2. Those persons in attendance are identified in Enclosure 1 to this letter.
TU Electric LATTN:
The meeting was held to discuss the NRC's pre-operational inspection experience in the security program area and how this experience might be applied to the Comanche Peak effort. Topics of discussion were based on the 81000 series inspection procedures identified in Chapter 2513 of'the NRC Inspection Manual.
Mr. W. G.
It is our opinion that this meeting was beneficial and has provided a better understanding of NRC regulations and requirements in the area of security programs.       In accordance with section 2.790 of the NRC's " Rules of. Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Counsil Executive Vice President 400 North Olive, L.B.
81 Dallas, Texas 75201 l
l Gentlemen:
This refers to the meeting conducted in the NRC Region IV office on l
September 4, 1987, relating to-activities authorized by NRC l-Construction Permits CPPR-126 and CPPR-127 for Comanche Peak Steam l
Electric Station, Units 1 and 2.
Those persons in attendance are identified in Enclosure 1 to this letter.
The meeting was held to discuss the NRC's pre-operational inspection experience in the security program area and how this experience might be applied to the Comanche Peak effort.
Topics of discussion were based on the 81000 series inspection procedures identified in Chapter 2513 of'the NRC Inspection Manual.
It is our opinion that this meeting was beneficial and has provided a better understanding of NRC regulations and requirements in the area of security programs.
In accordance with section 2.790 of the NRC's " Rules of. Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely, RFt0a Ae R. F. Warnick, Assistant Director i for Inspection Programs Comanche Peak Project Division Office of Special Projects
Sincerely, RFt0a Ae R.
F. Warnick, Assistant Director i
for Inspection Programs Comanche Peak Project Division Office of Special Projects


==Enclosure:==
==Enclosure:==
As stated i
i


As stated                                                                        i i
e TU Electric SEP 2 l 1987 cc w/ enclosure:
 
TU Electric Bureau of Radiation Control l
e TU Electric                                                                                                 SEP 2 l 1987 cc w/ enclosure:
l ATTN:
l TU Electric                           Bureau of Radiation Control l                               ATTN: G. S. Keeley                   State of Texas Mgr., Nuclear Licensing       1100 West 49th Street Skyway Tower                         Austin, Texas 78756 400 North Olive Street, L.B.81 Dallas, Texas 75201                   Nancy H. Williams CYGNA Energy Services Juanita Ellis                         Suite 390 President - CASE                     2121 N. California Blvd 1426 South Polk Street               Walnut Creek, CA 94596 Dallas, Texas 75224 Renea Hicks, Esq.
G. S. Keeley State of Texas Mgr., Nuclear Licensing 1100 West 49th Street Skyway Tower Austin, Texas 78756 400 North Olive Street, L.B.81 Dallas, Texas 75201 Nancy H. Williams CYGNA Energy Services Juanita Ellis Suite 390 President - CASE 2121 N. California Blvd 1426 South Polk Street Walnut Creek, CA 94596 Dallas, Texas 75224 Renea Hicks, Esq.
;                              Assistant Attorney General Environmental Protection Division P.O. Box 12548, Capitol Station Austin, Texas 78711-2548 Administrative Judge Peter Bloch U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l                               Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory Post Office Box X, Building 3500 Oak Ridge, Tennessee 37830 Dr. Kenneth A. McCollom 1107 West Knapp Stillwater, Oklahoma   74075 Dr. Walter H. Jordan Administrative Judge 881 West Outer Drive Oak Ridge, Tennessee   37830 Anthony Z. Roisman, Esq.
Assistant Attorney General Environmental Protection Division P.O. Box 12548, Capitol Station Austin, Texas 78711-2548 Administrative Judge Peter Bloch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory Post Office Box X, Building 3500 Oak Ridge, Tennessee 37830 Dr. Kenneth A. McCollom 1107 West Knapp Stillwater, Oklahoma 74075 Dr. Walter H. Jordan Administrative Judge 881 West Outer Drive Oak Ridge, Tennessee 37830 Anthony Z. Roisman, Esq.
Suite 600 1401 New York Avenue, N.W.
Suite 600 1401 New York Avenue, N.W.
Washington, D.C. 20005 Ms. Billie Pirner Garde, Esq.
Washington, D.C.
Government Accountability Project Midwest Office 104 East Wisconsin Avenue Appleton, Wisconsin   54911 l
20005 Ms. Billie Pirner Garde, Esq.
Government Accountability Project Midwest Office 104 East Wisconsin Avenue Appleton, Wisconsin 54911 l
I
I


                          ,t.,,                                                           -,i 4
,t.,,
TU' Electric'-                                             ,
-,i 4
                                                                                                )
TU' Electric'-
)
DISTRIBUTION:
DISTRIBUTION:
                .'kDettetF11es[(MS/4@M'                                                        i NRC PDR
.'kDettetF11es[(MS/4@M NRC PDR i
                      . Local PDR                                            ,.                )
,CPPDReading(HQ).
                      ,CPPDReading(HQ).                                                         {
)
;    ,                      Site. Reading.                                                     1
. Local PDR
:CPRT Group.                                           ,
{
SRI-0PS .
Site. Reading.
SRI-CONST                                                           4
1
                        'RSTS Operatsr?
:CPRT Group.
                      .RPB-RPSB                                                               ,
SRI-0PS.
,                            DRSP~
SRI-CONST 4
                      -RMartin,"RA'
'RSTS Operatsr?
                      'RSB .
.RPB-RPSB DRSP~
-RMartin,"RA'
'RSB.
RACaldwell:
RACaldwell:
LAYandell.
LAYandell.
RLBangart:                                                         !
RLBangart:
RIV File-JTaylor iJKeppler/JAxeltad.
RIV File-JTaylor iJKeppler/JAxeltad.
CIGrimes PFMcKee AVietti-Cook-
CIGrimes PFMcKee AVietti-Cook-
                      ' MMall oy-.
' MMall oy-.
JLyons JMoore, 0GC CPPD-LA, OSP JKonklin _ .
JLyons JMoore, 0GC CPPD-LA, OSP JKonklin _.
:JG11111and, PA0/RIV i
:JG11111and, PA0/RIV i
l
l
_--    _ _ _ _ _ _ - _ _ _ _ _ _ _ - - _ _ _ _ _ - _ - _ _}}
_ _ _ _ _ _ - _ _ _ _ _ _ _ - - _ _ _ _ _ - _ - _ _}}

Latest revision as of 05:45, 3 December 2024

Discusses 870904 Meeting Re Region IV pre-operational Insp Experience in Security Program Area & How Experience Might Be Applied to Plant Effort.List of Attendees Encl
ML20235F603
Person / Time
Site: Comanche Peak  
Issue date: 09/21/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8709290229
Download: ML20235F603 (5)


Text

r-_______,_

s

.F In-Reply Refer To:

SEP 21 gg7 4

Dockets:

50-445 50-445 I

)

TU Electric ATTN:

Mr. W. G.

Counsil

)

Executive Vice President 1

400 North Olive, L.B. 81 l

Dallas, Texas 75201 Gentlemen:

4 This refers to the meeting conditcted at Region IV's request in the

)

NRC Region IV office on September 4, 1987.

This related to

{

activities authorized by NRC Construction Permits CPPR-126 and j

CPPR-127 for Comanche Peak Steam Electric Station, Units 1 and 2.

j Those persons in attendance are identified in Enclosure 1 to this j

letter.

The meeting was held to discuss Region IV's pre-operational inspection experience in the security program area and how this experience might be applied to the Comanche Peak effort.

Topics of j

discussion were based on the 81000 series inspection procedures

{

identified in Chapter 2513 of the NRC Inspection Manual.

It is our opinion that this meeting was beneficial and has provided a better understanding of NRC requiations and requirements in the area of security programs.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, dRIGINAL stGNED BY R. F. WAI' NICK R.

F. Warnick, Assistant Director for Inspection Programs Comanche Peak Projr-ct Division office of Special Projects

Enclosure:

As stated D:DRSS C:RPB AD:OSPjera>

diTdtlV-3't

.L an RLBangart JEGagliardo RFWarnick

/

/87

/

/87 7/ 1/87 9/2//87 9 / ri/87 pu ewaA wh t i.r c u nal w W Jm eay t h.J e ~

gY t/ /n Rnt]

Vqr7 RRd 8709290229 870921 PDR ADOCK 05000445 G

PDR 1

I

$ p ENCLOSURE 1 LIST OF ATTENDEES Attendance at the TU Electric - NRC meeting on Septeitber 4,1987, at the NRC Region IV office.

I TU ELECTRIC B. T. - Lancaster, Manager, Plant Support Andrew J. Scogin, Security Manager 4

J.

C. Hicks, Licensing Engineer Janardan Amin, CPE, Senior Computer Applications Engineer Jim Britt, Security Representative Zoltan Gajak, Project Security System Coordinator l

J. R. Gallman,. Supervisor, Engineering Analysis I

David P. Lowry, System Engineer M. L. Lucas, Engineering' Supervisor q

W.

R. Parks, Burns, Project Manager C. W. Rickgauer, Engineering Supervisor John Rumsey, Security B.

Southam, Plant Security Supervisor B. W. Wieland, I&C Manager NRC, REGION IV R.

L. Bangart, Director, Division of Radiation Safety and Safeguards R. F. Warnick, Assistant Director for Inspection Programs L. A.-Yandell, Chief, Radiological Protection and Safeguards Branch J. A.

F. Kelly, Senior Physical Security Specialist R. A. Caldwell, Physical Security Specialist A.

B.

Earnest, Physical Security Specialist D. L. Kelley, Senior Resident Inspector (OPS) l I

I l

l

)

i l

l L______--__-----

c 4f o

UNITED STATES g

NUCLEAR REGULATORY COMMISSION n-E.

WASHINGTON, D, C. 20555

' \\y j#

...e.

SEP 21 1987 o

-l L

l In' Reply Refer To:

1 Dockets:

50-445 50-446 l

TU Electric LATTN:

Mr. W. G.

Counsil Executive Vice President 400 North Olive, L.B.

81 Dallas, Texas 75201 l

l Gentlemen:

This refers to the meeting conducted in the NRC Region IV office on l

September 4, 1987, relating to-activities authorized by NRC l-Construction Permits CPPR-126 and CPPR-127 for Comanche Peak Steam l

Electric Station, Units 1 and 2.

Those persons in attendance are identified in Enclosure 1 to this letter.

The meeting was held to discuss the NRC's pre-operational inspection experience in the security program area and how this experience might be applied to the Comanche Peak effort.

Topics of discussion were based on the 81000 series inspection procedures identified in Chapter 2513 of'the NRC Inspection Manual.

It is our opinion that this meeting was beneficial and has provided a better understanding of NRC regulations and requirements in the area of security programs.

In accordance with section 2.790 of the NRC's " Rules of. Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, RFt0a Ae R.

F. Warnick, Assistant Director i

for Inspection Programs Comanche Peak Project Division Office of Special Projects

Enclosure:

As stated i

i

e TU Electric SEP 2 l 1987 cc w/ enclosure:

TU Electric Bureau of Radiation Control l

l ATTN:

G. S. Keeley State of Texas Mgr., Nuclear Licensing 1100 West 49th Street Skyway Tower Austin, Texas 78756 400 North Olive Street, L.B.81 Dallas, Texas 75201 Nancy H. Williams CYGNA Energy Services Juanita Ellis Suite 390 President - CASE 2121 N. California Blvd 1426 South Polk Street Walnut Creek, CA 94596 Dallas, Texas 75224 Renea Hicks, Esq.

Assistant Attorney General Environmental Protection Division P.O. Box 12548, Capitol Station Austin, Texas 78711-2548 Administrative Judge Peter Bloch U.S. Nuclear Regulatory Commission Washington, D.C.

20555 l

Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory Post Office Box X, Building 3500 Oak Ridge, Tennessee 37830 Dr. Kenneth A. McCollom 1107 West Knapp Stillwater, Oklahoma 74075 Dr. Walter H. Jordan Administrative Judge 881 West Outer Drive Oak Ridge, Tennessee 37830 Anthony Z. Roisman, Esq.

Suite 600 1401 New York Avenue, N.W.

Washington, D.C.

20005 Ms. Billie Pirner Garde, Esq.

Government Accountability Project Midwest Office 104 East Wisconsin Avenue Appleton, Wisconsin 54911 l

I

,t.,,

-,i 4

TU' Electric'-

)

DISTRIBUTION:

.'kDettetF11es[(MS/4@M NRC PDR i

,CPPDReading(HQ).

)

. Local PDR

{

Site. Reading.

1

CPRT Group.

SRI-0PS.

SRI-CONST 4

'RSTS Operatsr?

.RPB-RPSB DRSP~

-RMartin,"RA'

'RSB.

RACaldwell:

LAYandell.

RLBangart:

RIV File-JTaylor iJKeppler/JAxeltad.

CIGrimes PFMcKee AVietti-Cook-

' MMall oy-.

JLyons JMoore, 0GC CPPD-LA, OSP JKonklin _.

JG11111and, PA0/RIV i

l

_ _ _ _ _ _ - _ _ _ _ _ _ _ - - _ _ _ _ _ - _ - _ _