TXX-6820, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Adequately Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions. Initially Reported on 870527.Next Rept Expected by 871216: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. __ - -_      _
{{#Wiki_filter:. __ -
1 M
1 M
MM                         Log # TXX-6820 3--   d                   File # 10110
MM Log # TXX-6820 3--
                                                          =       =.                         903.10 7t#ELECTR/C                  Ref #10CFR50.55(e)
d File # 10110
      .wimam c. cooma                                                                 October 5, 1987           -
=
Executive Vice President
=.
      ' U. S. Nuclear Regulatory Commission                                                                               f Attn: Document Control Desk                                                                                         j
903.10 Ref #10CFR50.55(e) 7t#ELECTR/C
      . Washington, DC 20555
.wimam c. cooma October 5, 1987 Executive Vice President
                                                                                                                          ]
' U. S. Nuclear Regulatory Commission f
Attn: Document Control Desk j
. Washington, DC 20555
]


==SUBJECT:==
==SUBJECT:==
~ COMANCllE PEAK STEAM ELECTRIC STATION (CPSES)                                                       ..
~ COMANCllE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446                                                                 j TRACEABILITY'0F 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT)                                                               ;
DOCKET NOS. 50-445 AND 50-446 j
Gentlemen-                                                                                                       l, On May-27, 1986 we' verbally notified your Mr. T. F. Westerman of deficiency involving the failure of project procedures to adequately address the
TRACEABILITY'0F 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT) l Gentlemen-On May-27, 1986 we' verbally notified your Mr. T. F. Westerman of deficiency involving the failure of project procedures to adequately address the
      ; installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under the provisions'of 10CFR50.55(e). Our' latest interim report, logged TXX-6455, was submitted on May 20, 1987.                                                                                    .
; installation and inspection criteria for cable runs used as device pigtail extensions.
l The evaluation of the as-built data for Unit 1 obtained through the field validation program and our assessment of the potential safety significance of this data is continuing.                                                                                         i
This is an interim report of a potentially reportable item under the provisions'of 10CFR50.55(e). Our' latest interim report, logged TXX-6455, was submitted on May 20, 1987.
                                                                                                                          )
l The evaluation of the as-built data for Unit 1 obtained through the field validation program and our assessment of the potential safety significance of this data is continuing.
Our field verification program for Unit 2 is scheduled to commence as Unit 1                                       l activities in support of fuel load are completed.                                                                 )
i
                                                                                                                            )
)
Our next report on this issue will be submitted no later than                                                       i December 16, 1987.
Our field verification program for Unit 2 is scheduled to commence as Unit 1 l
                                                                                                                          ]
activities in support of fuel load are completed.
)
)
Our next report on this issue will be submitted no later than i
December 16, 1987.
]
Very truly yours,
Very truly yours,
[J) . [ ( o u. u l W. G   ounsil By: '       44 J. S. MarsEll Supervisor, Generic Licensing                 j i
[J). [ ( o u. u l W. G ounsil By: '
RSB/grr
44 J. S. MarsEll Supervisor, Generic Licensing j
                                                                                                                            ]
i RSB/grr
]
l c - Mr. R. D. Martin, Region IV.
l c - Mr. R. D. Martin, Region IV.
Resident Inspectors, CPSES (3) 8710150458 871005 PDR         ADOCK 05000445                                                                                             l l     s                           PDR l                                       400 Nonh Olive Street LB SI skilas, Texas 73:01 rGL1}}
Resident Inspectors, CPSES (3) 8710150458 871005 PDR ADOCK 05000445 l
l s
PDR l
rGL1 400 Nonh Olive Street LB SI skilas, Texas 73:01}}

Latest revision as of 04:49, 3 December 2024

Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Adequately Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions. Initially Reported on 870527.Next Rept Expected by 871216
ML20235W005
Person / Time
Site: Comanche Peak  
Issue date: 10/05/1987
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-38, TXX-6820, NUDOCS 8710150458
Download: ML20235W005 (1)


Text

. __ -

1 M

MM Log # TXX-6820 3--

d File # 10110

=

=.

903.10 Ref #10CFR50.55(e) 7t#ELECTR/C

.wimam c. cooma October 5, 1987 Executive Vice President

' U. S. Nuclear Regulatory Commission f

Attn: Document Control Desk j

. Washington, DC 20555

]

SUBJECT:

~ COMANCllE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 j

TRACEABILITY'0F 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT) l Gentlemen-On May-27, 1986 we' verbally notified your Mr. T. F. Westerman of deficiency involving the failure of project procedures to adequately address the

installation and inspection criteria for cable runs used as device pigtail extensions.

This is an interim report of a potentially reportable item under the provisions'of 10CFR50.55(e). Our' latest interim report, logged TXX-6455, was submitted on May 20, 1987.

l The evaluation of the as-built data for Unit 1 obtained through the field validation program and our assessment of the potential safety significance of this data is continuing.

i

)

Our field verification program for Unit 2 is scheduled to commence as Unit 1 l

activities in support of fuel load are completed.

)

)

Our next report on this issue will be submitted no later than i

December 16, 1987.

]

Very truly yours,

[J). [ ( o u. u l W. G ounsil By: '

44 J. S. MarsEll Supervisor, Generic Licensing j

i RSB/grr

]

l c - Mr. R. D. Martin, Region IV.

Resident Inspectors, CPSES (3) 8710150458 871005 PDR ADOCK 05000445 l

l s

PDR l

rGL1 400 Nonh Olive Street LB SI skilas, Texas 73:01