TXX-6455, Interim Deficiency Rept CP-86-38 on Failure of Procedures Re Traceability of 1E Pigtail Extensions.Initially Reported on 860527.Assessment of Safety Significance Will Be Completed by 870910 for Unit 1.Next Rept Expected by 871005

From kanterella
(Redirected from TXX-6455)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-38 on Failure of Procedures Re Traceability of 1E Pigtail Extensions.Initially Reported on 860527.Assessment of Safety Significance Will Be Completed by 870910 for Unit 1.Next Rept Expected by 871005
ML20214J384
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/20/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-38, TXX-6455, NUDOCS 8705280033
Download: ML20214J384 (1)


Text

.

Log # TXX-6455 File # 10110 L

.=

908.3 C

Ref # 10CFR50.55(e) 1UELECTRIC

% Hliam G. Coumu n,na,- rm, ac,m, May 20, 1987 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i DOCKET NOS. 50-445 AND 50-446 i

TRACEABILITY OF 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT)

Gentlemen:

On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving the failure of project procedures to adequately address the installation and inspection criteria for cable runs used as device pigtail extensions. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest interim report, logged TXX-6256 was submitted on February 4, 1987.

The Unit 1 field verification effort to obtain cable and splice data is complete. The evaluation of the as-built data for Unit 1 and our assessment of safety significance is scheduled to be completed by September 10, 1987.

A field verification program for Unit 2 will be performed in the same manner as the program implemented for Unit 1.

This effort is scheduled to begin in July, 1987, and be completed in March, 1988.

Our next report on this issue will be submitted no later than October 5, 1987.

Very truly yours, nd W. G.

ounsil By:

G. S. Keeley n L Manager,NuclearLIdensing l