TXX-6820, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Adequately Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions. Initially Reported on 870527.Next Rept Expected by 871216
| ML20235W005 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/05/1987 |
| From: | Counsil W, John Marshall TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-86-38, TXX-6820, NUDOCS 8710150458 | |
| Download: ML20235W005 (1) | |
Text
. __ -
1 M
MM Log # TXX-6820 3--
d File # 10110
=
=.
903.10 Ref #10CFR50.55(e) 7t#ELECTR/C
.wimam c. cooma October 5, 1987 Executive Vice President
' U. S. Nuclear Regulatory Commission f
Attn: Document Control Desk j
. Washington, DC 20555
]
SUBJECT:
~ COMANCllE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 j
TRACEABILITY'0F 1E PIGTAIL EXTENSIONS SDAR: CP-86-38 (INTERIM REPORT) l Gentlemen-On May-27, 1986 we' verbally notified your Mr. T. F. Westerman of deficiency involving the failure of project procedures to adequately address the
- installation and inspection criteria for cable runs used as device pigtail extensions.
This is an interim report of a potentially reportable item under the provisions'of 10CFR50.55(e). Our' latest interim report, logged TXX-6455, was submitted on May 20, 1987.
l The evaluation of the as-built data for Unit 1 obtained through the field validation program and our assessment of the potential safety significance of this data is continuing.
i
)
Our field verification program for Unit 2 is scheduled to commence as Unit 1 l
activities in support of fuel load are completed.
)
)
Our next report on this issue will be submitted no later than i
December 16, 1987.
]
Very truly yours,
[J). [ ( o u. u l W. G ounsil By: '
44 J. S. MarsEll Supervisor, Generic Licensing j
i RSB/grr
]
l c - Mr. R. D. Martin, Region IV.
Resident Inspectors, CPSES (3) 8710150458 871005 PDR ADOCK 05000445 l
l s
PDR l