ML20235W395: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 21: Line 21:
{{#Wiki_filter:- - .
{{#Wiki_filter:- - .
..
..
    >     .i
>
                                                                                                    l
.i
                                                                                                    l
l
                                                                                          USHRC-DS
l
                                                                                                    l
USHRC-DS
                                                                                    e il A o: ao   j
l
                                                                06 00T 1987
e il A o: ao
                                                                                                    ,
j
              Docket No. 50-289                                                                     i
06 00T 1987
                                                                                                    i
,
              GPU Nuclear Corporation                                                               ]
Docket No. 50-289
              ATTN: Mr. H. D. Hukill                                                               i
i
                          Vice President and Director, TMI-1                                       )
i
              P. O. Box'480                                                                         j
GPU Nuclear Corporation
              Middletown, Pennsylvania 17057                                                         l
]
                                                                                                    i
ATTN: Mr. H. D. Hukill
              Gentlemen:                                                                           I
i
              Subject:       Inspection Report No. 50-289/87-13                                     i
Vice President and Director, TMI-1
                                                                                                    !
)
              During the period from July 9, 1987, to September 4, 1987, members of NRC             l
P. O. Box'480
              Region I staff conducted routine safety inspections at your facility. We               .
j
              documented the results of that inspection in the enclosed report. At the
Middletown, Pennsylvania 17057
              conclusion of the inspection period, Mr. R. Conte of my staff summarized             1
l
              the inspection findings with you and other members of your staff. We
i
              identified no conditions adverse to nuclear safety and no violations of
Gentlemen:
              regulatory requirements.
I
              This also acknowledges receipt and the acceptability of your responses,
Subject:
              dated April 16, July 23, July 31, and August 25, 1987, to violations of
Inspection Report No. 50-289/87-13
              NRC requirements identified by our letters. dated March 18 and June 23,
i
              1987 (NRC Inspection Report Nos. 50-289/87-06 and 87-09, respectively).
!
              With respect to equipment and personnel performance problems in the
During the period from July 9, 1987, to September 4, 1987, members of NRC
              letdown prefilter room, we are satisfied with your planned corrective
l
              action, assuming effective implementation of these measures. All of the
Region I staff conducted routine safety inspections at your facility. We
              identified violations, along with your responses, will be reviewed in a
.
              future inspection.
documented the results of that inspection in the enclosed report.
                                                                                                    I
At the
              No response to this letter is required.        Thank you for your cooperation        i
conclusion of the inspection period, Mr. R. Conte of my staff summarized
              in these matters.                                                                      I
                                                      Sincere 1y,
                                                              @IlMigEBy
                                                                        ~
                                                      Lee H. Bettenhausen, Chief                  )
                                                      Reactor Projects Branch 1
                                                      Division of Reactor Projects
              Enclosure:
              NRC Region I Inspection Report No. 50-289/87-13                                      j
                h
                G
                                      P
l                                          OFFICIAL RECORD COPY      IR TMIl 87-13 - 0001.0.0
l                                                                      09/24/87
1
1
'                                                                                      0l     i
the inspection findings with you and other members of your staff. We
                                                                                                  \
identified no conditions adverse to nuclear safety and no violations of
                                                                                                    i
regulatory requirements.
This also acknowledges receipt and the acceptability of your responses,
dated April 16, July 23, July 31, and August 25, 1987, to violations of
NRC requirements identified by our letters. dated March 18 and June 23,
1987 (NRC Inspection Report Nos. 50-289/87-06 and 87-09, respectively).
With respect to equipment and personnel performance problems in the
letdown prefilter room, we are satisfied with your planned corrective
action, assuming effective implementation of these measures.
All of the
identified violations, along with your responses, will be reviewed in a
future inspection.
I
No response to this letter is required.
Thank you for your cooperation
i
in these matters.
I
Sincere 1y,
@IlMigEBy
~
Lee H. Bettenhausen, Chief
)
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Report No. 50-289/87-13
j
h
P
G
l
OFFICIAL RECORD COPY
IR TMIl 87-13 - 0001.0.0
l
09/24/87
1
0l
\\
i
i
'
a_-________
a_-________


  _ - _ _         _ _ - _ _ _
_ - _ _
        v   ..,
_ _ - _ _ _
                                                                                              !
v
                GPU~ Nuclear Corporation                 2
. . ,
                                                                      06 00T 1987         .i
!
                cc w/ enc 1:
GPU~ Nuclear Corporation
                T. G. Broughton, Operations and Maintenance Director, TMI-1
2
                C. W. Smyth, TMI-1 Licensing Manager
06 00T 1987
                R. J. McGoey, Manager, PWR Licensing
.i
                E. L. Blake, Jr.
cc w/ enc 1:
                Public Document Room (PDR)
T. G. Broughton, Operations and Maintenance Director, TMI-1
                Local Public Document Room (LPDR)
C. W. Smyth, TMI-1 Licensing Manager
          ,
R. J. McGoey, Manager, PWR Licensing
                Nuclear Safety Information Center (NSIC)
E. L. Blake, Jr.
                NRC Resident Inspector
Public Document Room (PDR)
                Commonwealth of Pennsylvania
Local Public Document Room (LPDR)
                bec w/ encl:
Nuclear Safety Information Center (NSIC)
                Region I Docket Room (with concurrences)
,
                J. Goldberg, OELD:HQ
NRC Resident Inspector
                Management Assistant, DRMA (w/o encl)
Commonwealth of Pennsylvania
                Operations Branch, DRS Files
bec w/ encl:
                Engineering Branch, DRS Files
Region I Docket Room (with concurrences)
                EP & RP Branch, DRSS Files
J. Goldberg, OELD:HQ
                'S. Collins, DRP Branch Chief
Management Assistant, DRMA (w/o encl)
                R. Blough, DRP Sectior, Chief
Operations Branch, DRS Files
                W. Travers, NRR
Engineering Branch, DRS Files
                G. Edison, PM, NRR
EP & RP Branch, DRSS Files
                K. Abraham, RI
'S. Collins, DRP Branch Chief
                R. Conte, RI
R. Blough, DRP Sectior, Chief
                D. Johnson, RI
W. Travers, NRR
                C. Myers, RV
G. Edison, PM, NRR
                S. Peleschak, RI
K. Abraham, RI
                W. Russell, RI
R. Conte, RI
                D. Wallace, RI
D. Johnson, RI
                C. Woodard, RI
C. Myers, RV
                                                                                              4
S. Peleschak, RI
                RI:DRP**       RI:DRP**     RI:DRS**     RI:DRS** RI:DRS**
W. Russell, RI
                RConte/cph     ABlough     NBlumberg   CAnderson LBettenhausen
D. Wallace, RI
C. Woodard, RI
4
RI:DRP**
RI:DRP**
RI:DRS**
RI:DRS**
RI:DRS**
RConte/cph
ABlough
NBlumberg
CAnderson
LBettenhausen
9/ /87
9/ /87
9/ /87
9/ /87
9/ /87
,
,
                9/ /87        9/ /87      9/ /87      9/ /87  9/ /87
i
'
'
                ** Previous Concurrence Attached
** Previous Concurrence Attached
                                          0FFICIAL RECORD COPY   IR TMIl 87-13 - 0002.0.0
0FFICIAL RECORD COPY
                                                                  10/06/87
IR TMIl 87-13 - 0002.0.0
L                                                                                           J
10/06/87
L
J


_ _ - _ - - - _ .
_ _ - _ - - - _ .
                    A
A
                        .c                                                                                     ,
.c
                  *
,
                                                                                                                l
*
                            GPU Nuclear Corporation                     2
l
                                                                                                                i
GPU Nuclear Corporation
                            cc w/ encl:   ,
2
                            T. G. Broughton, Operations and Maintenance Director, TMI-1
i
                            C. W. Smyth, TMI-1 Licensing Manager
cc w/ encl:
                            R. J. McGoey, Manager, PWR Licensing
,
                                                    '
T. G. Broughton, Operations and Maintenance Director, TMI-1
                                                                                                                l
C. W. Smyth, TMI-1 Licensing Manager
                            E. L. Blake, Jr.
R. J. McGoey, Manager, PWR Licensing
                            TMI-1 OTSG Hearing Service List                                                     !
E. L. Blake, Jr.
                            Public Document Room (PDR)                                                         :
'
                                                                                                                '
l
                            Local Public Document Rocm (LPDR)
TMI-1 OTSG Hearing Service List
                            Nuclear Safety Information Center (NSIC)                                           l
!
                            NRC Resident Inspector
Public Document Room (PDR)
                            Commonwealth of Pennsylvania
:
                            bec w/ encl:                                                                         l
Local Public Document Rocm (LPDR)
                            Region I Docket Room (with concurrences)
'
                            J. Goldberg, OELD:HQ
Nuclear Safety Information Center (NSIC)
                            Management Assistant, DRMA (w/o enc 1)
l
                            Operations Branch, DRS Files
NRC Resident Inspector
                            Engineering Branch, DRS Files
Commonwealth of Pennsylvania
                            EP & RP Branch, DRSS Files
bec w/ encl:
                            S. Collins, DRP Branch Chief                                                       f
l
                            R. Blough, DRP Section Chief                                                         ,
Region I Docket Room (with concurrences)
                            W. Travers, NRR                                                                     l
J. Goldberg, OELD:HQ
                            G. Edison, PM, NRR                                                                   '
Management Assistant, DRMA (w/o enc 1)
                            K. Abraham, RI
Operations Branch, DRS Files
                            R. Conte, RI
Engineering Branch, DRS Files
                            D. Johnson, RI
EP & RP Branch, DRSS Files
                            C. Myers, RV
S. Collins, DRP Branch Chief
                            S. Peleschak, RI.                                                                   )
f
                            W. Russell, RI
R. Blough, DRP Section Chief
                            D. Wallace, RI
,
                            C. Woodard, RI                                                                       I
W. Travers, NRR
                                                                ,
l
                            RI:DRP         2RI:DRP
G. Edison, PM, NRR
                                                        -
'
                                                          I DR         RI:DRS
K. Abraham, RI
                                                                              b RI:DRS                         l
R. Conte, RI
                                                                                                                  1
D. Johnson, RI
                            RConte/cph       ABlough     8
C. Myers, RV
                                                                bergqfAnderson LBettenhausen
S. Peleschak, RI.
                      /f 9/h/87             9/11/87   9/ /87         9/Jj/87 /a/6/87
)
                                                      0FF.' : IAL RECORD COPY   IR TMIl 87-13 - 0002.0.0
W. Russell, RI
                                                                                09/24/87
D. Wallace, RI
C. Woodard, RI
I
,
RI:DRP
2RI:DRP
-
b
1
I DR
RI:DRS
RI:DRS
l
RConte/cph
ABlough
8
LBettenhausen
bergqfAnderson
/f 9/h/87
9/11/87
9/ /87
9/Jj/87
/a/6/87
0FF.' : IAL RECORD COPY
IR TMIl 87-13 - 0002.0.0
'
'
l                                                                                                     _ . _ _
09/24/87
l
_
. _ _
}}
}}

Latest revision as of 03:46, 3 December 2024

Forwards Insp Rept 50-289/87-13 on 870709-0904.No Violations Noted.Ack Receipt of 870416,0723 & 0825 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-289/87-06 & 87-09
ML20235W395
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/06/1987
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20235W398 List:
References
REF-GTECI-A-47, REF-GTECI-SY, RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8710160202
Download: ML20235W395 (3)


See also: IR 05000289/1987013

Text

- - .

..

>

.i

l

l

USHRC-DS

l

e il A o: ao

j

06 00T 1987

,

Docket No. 50-289

i

i

GPU Nuclear Corporation

]

ATTN: Mr. H. D. Hukill

i

Vice President and Director, TMI-1

)

P. O. Box'480

j

Middletown, Pennsylvania 17057

l

i

Gentlemen:

I

Subject:

Inspection Report No. 50-289/87-13

i

!

During the period from July 9, 1987, to September 4, 1987, members of NRC

l

Region I staff conducted routine safety inspections at your facility. We

.

documented the results of that inspection in the enclosed report.

At the

conclusion of the inspection period, Mr. R. Conte of my staff summarized

1

the inspection findings with you and other members of your staff. We

identified no conditions adverse to nuclear safety and no violations of

regulatory requirements.

This also acknowledges receipt and the acceptability of your responses,

dated April 16, July 23, July 31, and August 25, 1987, to violations of

NRC requirements identified by our letters. dated March 18 and June 23,

1987 (NRC Inspection Report Nos. 50-289/87-06 and 87-09, respectively).

With respect to equipment and personnel performance problems in the

letdown prefilter room, we are satisfied with your planned corrective

action, assuming effective implementation of these measures.

All of the

identified violations, along with your responses, will be reviewed in a

future inspection.

I

No response to this letter is required.

Thank you for your cooperation

i

in these matters.

I

Sincere 1y,

@IlMigEBy

~

Lee H. Bettenhausen, Chief

)

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-289/87-13

j

h

P

G

l

OFFICIAL RECORD COPY

IR TMIl 87-13 - 0001.0.0

l

09/24/87

1

0l

\\

i

i

'

a_-________

_ - _ _

_ _ - _ _ _

v

. . ,

!

GPU~ Nuclear Corporation

2

06 00T 1987

.i

cc w/ enc 1:

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o encl)

Operations Branch, DRS Files

Engineering Branch, DRS Files

EP & RP Branch, DRSS Files

'S. Collins, DRP Branch Chief

R. Blough, DRP Sectior, Chief

W. Travers, NRR

G. Edison, PM, NRR

K. Abraham, RI

R. Conte, RI

D. Johnson, RI

C. Myers, RV

S. Peleschak, RI

W. Russell, RI

D. Wallace, RI

C. Woodard, RI

4

RI:DRP**

RI:DRP**

RI:DRS**

RI:DRS**

RI:DRS**

RConte/cph

ABlough

NBlumberg

CAnderson

LBettenhausen

9/ /87

9/ /87

9/ /87

9/ /87

9/ /87

,

i

'

    • Previous Concurrence Attached

0FFICIAL RECORD COPY

IR TMIl 87-13 - 0002.0.0

10/06/87

L

J

_ _ - _ - - - _ .

A

.c

,

l

GPU Nuclear Corporation

2

i

cc w/ encl:

,

T. G. Broughton, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

'

l

TMI-1 OTSG Hearing Service List

!

Public Document Room (PDR)

Local Public Document Rocm (LPDR)

'

Nuclear Safety Information Center (NSIC)

l

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

l

Region I Docket Room (with concurrences)

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o enc 1)

Operations Branch, DRS Files

Engineering Branch, DRS Files

EP & RP Branch, DRSS Files

S. Collins, DRP Branch Chief

f

R. Blough, DRP Section Chief

,

W. Travers, NRR

l

G. Edison, PM, NRR

'

K. Abraham, RI

R. Conte, RI

D. Johnson, RI

C. Myers, RV

S. Peleschak, RI.

)

W. Russell, RI

D. Wallace, RI

C. Woodard, RI

I

,

RI:DRP

2RI:DRP

-

b

1

I DR

RI:DRS

RI:DRS

l

RConte/cph

ABlough

8

LBettenhausen

bergqfAnderson

/f 9/h/87

9/11/87

9/ /87

9/Jj/87

/a/6/87

0FF.' : IAL RECORD COPY

IR TMIl 87-13 - 0002.0.0

'

09/24/87

l

_

. _ _