TXX-6614, Advises That Completion Date for Implementation of Mods to Unit 1 Cable Tray Hangers (Cth) Revised to 871102,per Violation a Noted in Insp Rept 50-445/84-16.Completion Date for Unit 2 Cth Program Revised to 881031: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. - _ | {{#Wiki_filter:. - _ | ||
I | I M | ||
Log # TXX-6614 | |||
~~ | |||
File # 10130 IR 84-16 r | |||
= | |||
Ref # 10CFR2.201 1UELECTRIC July 31,1987 mmm c. coumu Decutive he Preudent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) | ||
DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM A (445/8416-V-01) | DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM A (445/8416-V-01) | ||
REF: | REF: | ||
: 1) TUGC0 letter TXX-4346 from B. R. Clements to R. L. Bangart dated November 1, 1984. | |||
: 2) TUGC0 lett'er TXX-4369 from B. R. Clements to R. L. Bangart dated November 28, 1984. | : 2) TUGC0 lett'er TXX-4369 from B. R. Clements to R. L. Bangart dated November 28, 1984. | ||
: 3) TUGC0 letter TXX-4393 from B. R. Clements to R. L. Bangart dated January 14, 1985. | : 3) TUGC0 letter TXX-4393 from B. R. Clements to R. L. Bangart dated January 14, 1985. | ||
| Line 32: | Line 35: | ||
dated May 8, 1987. | dated May 8, 1987. | ||
Gentlemen: | Gentlemen: | ||
Reference (4) provided our updated response to Notice of Violation Item A (445/8416-V-01). In that response we stated that implementation of the required modifications and rework of the Unit 1 Cable Tray Hangers (CTH's) was scheduled for completion by August 1, 1987. As a result of the substantial effort required to complete this program, the scheduled completion date for the Unit 1 program is hereby revised to be November 2, 1987. | Reference (4) provided our updated response to Notice of Violation Item A (445/8416-V-01). | ||
In that response we stated that implementation of the required modifications and rework of the Unit 1 Cable Tray Hangers (CTH's) was scheduled for completion by August 1, 1987. | |||
As a result of the substantial effort required to complete this program, the scheduled completion date for the Unit 1 program is hereby revised to be November 2, 1987. | |||
Our response also stated that completion of the Unit 2 CTH program was scheduled for December 27, 1987. Our scheduled completion date for the Unit 2 program has been extended to October 31, 1988. | Our response also stated that completion of the Unit 2 CTH program was scheduled for December 27, 1987. Our scheduled completion date for the Unit 2 program has been extended to October 31, 1988. | ||
Very truly yours, is.G. Q W. G. Counsil | Very truly yours, is.G. Q W. G. Counsil BY: W' 8708050218 870421 e | ||
PDR ADOCK 05000445 J6hn W. Beck R | |||
PDR Vice President Nuclear Engineering DAR/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 400 Nonh Olive Street LB 81 Dallas, Texas 73201 t(O | |||
__-}} | __-}} | ||
Latest revision as of 02:48, 3 December 2024
| ML20236H492 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/31/1987 |
| From: | Beck J, Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-6614, NUDOCS 8708050218 | |
| Download: ML20236H492 (1) | |
Text
. - _
I M
Log # TXX-6614
~~
File # 10130 IR 84-16 r
=
Ref # 10CFR2.201 1UELECTRIC July 31,1987 mmm c. coumu Decutive he Preudent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM A (445/8416-V-01)
REF:
- 1) TUGC0 letter TXX-4346 from B. R. Clements to R. L. Bangart dated November 1, 1984.
- 2) TUGC0 lett'er TXX-4369 from B. R. Clements to R. L. Bangart dated November 28, 1984.
- 3) TUGC0 letter TXX-4393 from B. R. Clements to R. L. Bangart dated January 14, 1985.
dated May 8, 1987.
Gentlemen:
Reference (4) provided our updated response to Notice of Violation Item A (445/8416-V-01).
In that response we stated that implementation of the required modifications and rework of the Unit 1 Cable Tray Hangers (CTH's) was scheduled for completion by August 1, 1987.
As a result of the substantial effort required to complete this program, the scheduled completion date for the Unit 1 program is hereby revised to be November 2, 1987.
Our response also stated that completion of the Unit 2 CTH program was scheduled for December 27, 1987. Our scheduled completion date for the Unit 2 program has been extended to October 31, 1988.
Very truly yours, is.G. Q W. G. Counsil BY: W' 8708050218 870421 e
PDR ADOCK 05000445 J6hn W. Beck R
PDR Vice President Nuclear Engineering DAR/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 400 Nonh Olive Street LB 81 Dallas, Texas 73201 t(O