ML20236H933: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
._. _ _ _ _ _ __ _ _ _-_ - ___ | |||
,o | |||
,. | |||
Jill 3 0198*1 | |||
l | |||
l | |||
In Reply Refer To: | |||
Docket: | |||
.50-298/87-16 | |||
; | |||
Nebraska Public Power District | |||
l | |||
ATTN: | |||
George A. Trevors | |||
Division Manager - Nuclear Support | |||
P. O. Box 499 | |||
Columbus, NE | |||
68601 | |||
Gentlemen: | |||
This refers to the inspection conducted by Mr. H. L. Scott accompanied by Mr. | |||
} | B. Murray, of this office during the period July 6-10, 1987, of activities | ||
authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to | |||
the discussion of our findings with Mr. G. R. Horn and other members of your | |||
staff at the conclusion of the inspection. | |||
Areas examined during the inspection included portions of the radiation | |||
protection program. | |||
Within these areas, the inspection consisted of selective | |||
examination of procedures and representative records, interviews with | |||
} | |||
persannel, and observations by the NRC inspector. | |||
The inspection findings are | |||
documented in the enclosed inspection report. | |||
Within the scope of the inspection, no violations or deviations were | |||
identified. | |||
Should you have any questions concerning this inspection, we will be pleased to | |||
discuss them with you. | |||
Sincerely, | |||
/s/ | |||
< | |||
J. E. Gagliardo, Chief | |||
Reactor Projects Branch | |||
Encloture: | |||
Appendix - NRC Inspection Report | |||
50-298/87-16 | |||
cc w/ enclosure: (see next page) | |||
8708050404 870730 | |||
PDR | |||
ADDCK 05000298 | |||
G | |||
PDR | |||
C}.t' | |||
\\h | |||
RIV:FRPS(f | |||
$d | |||
1 | |||
C:FRP F | |||
C:RPSB | |||
PyB | |||
C:RPB | |||
/ HLScott/tw | |||
}BMurray | |||
LAYand M | |||
JPJbudon | |||
JEGaqi | |||
do | |||
f 1/g1/87 | |||
1 'l /p t'/87 | |||
A/p /87 i | |||
/r}1/87 | |||
7/t.f) | |||
\\ \\ | |||
- _ _ - _ _ - _ _ _ _ - _ _ - - _ . _ _ _ - _ - _ _ _ | |||
_ | |||
_ | |||
. | |||
, | |||
.; o . | .; o | ||
. | |||
Nebraska Public Power District | |||
-2- | |||
i | |||
cc w/ enclosure: | |||
Guy Horn, Division Manager | |||
of Nuclear Operations | |||
, | |||
Cooper Nuclear Station | |||
' | |||
P. O. Box 98 | |||
Brownville, Nebraska | |||
68321 | |||
Kansas Radiation Control Program Director | |||
Nebraska Radiation Control Program Director | |||
bec distrib. by RIV: | |||
bec (DMB IE06) | |||
*RPB | |||
DRSP | |||
*RRI | |||
R. D. Martin, RA | |||
*Section Chief (RPB/A) | |||
*D. Weiss, RM/ALF | |||
RPSB | |||
*RSB | |||
* MIS System | |||
* Project Inspector, RPB | |||
*RIV File | |||
*R. Hall | |||
*RSTS Operator | |||
*W. Long, NRR Project Manager | |||
*B. Murray | |||
R. L. Bangart | |||
*w/766 | |||
l | |||
; | |||
__-_--_ -_-___ a | |||
}} | }} | ||
Latest revision as of 01:43, 3 December 2024
| ML20236H933 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 07/30/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20236H937 | List: |
| References | |
| NUDOCS 8708050404 | |
| Download: ML20236H933 (2) | |
See also: IR 05000298/1987016
Text
_
._. _ _ _ _ _ __ _ _ _-_ - ___
,o
,.
Jill 3 0198*1
l
l
In Reply Refer To:
Docket:
.50-298/87-16
Nebraska Public Power District
l
ATTN:
George A. Trevors
Division Manager - Nuclear Support
P. O. Box 499
Columbus, NE
68601
Gentlemen:
This refers to the inspection conducted by Mr. H. L. Scott accompanied by Mr.
B. Murray, of this office during the period July 6-10, 1987, of activities
authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to
the discussion of our findings with Mr. G. R. Horn and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included portions of the radiation
protection program.
Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
}
persannel, and observations by the NRC inspector.
The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
/s/
<
J. E. Gagliardo, Chief
Reactor Projects Branch
Encloture:
Appendix - NRC Inspection Report
50-298/87-16
cc w/ enclosure: (see next page)
8708050404 870730
ADDCK 05000298
G
C}.t'
\\h
RIV:FRPS(f
$d
1
C:FRP F
C:RPSB
PyB
C:RPB
/ HLScott/tw
}BMurray
LAYand M
JPJbudon
JEGaqi
do
f 1/g1/87
1 'l /p t'/87
A/p /87 i
/r}1/87
7/t.f)
\\ \\
- _ _ - _ _ - _ _ _ _ - _ _ - - _ . _ _ _ - _ - _ _ _
_
_
.
,
.; o
.
Nebraska Public Power District
-2-
i
cc w/ enclosure:
Guy Horn, Division Manager
of Nuclear Operations
,
Cooper Nuclear Station
'
P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec distrib. by RIV:
bec (DMB IE06)
- RPB
DRSP
- RRI
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, RM/ALF
RPSB
- RSB
- MIS System
- Project Inspector, RPB
- RIV File
- R. Hall
- RSTS Operator
- W. Long, NRR Project Manager
- B. Murray
R. L. Bangart
- w/766
l
__-_--_ -_-___ a