ML20236J907: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
9 | - - c v --- | ||
9 p | |||
yyy PRELIMINARY NOTIFICATION A | |||
October 4, 1976 PRELDiINARY NOTIFICATION OF SAFEGUARDS EVENT-- | :y EXEMPT FROM PUBLIC DISCLOSURE PURSUANT TO,10 CFR 2.790(d) | ||
October 4, 1976 PRELDiINARY NOTIFICATION OF SAFEGUARDS EVENT-- | |||
PNS-76-56 | |||
,This preliminary notification constitutes EARLY notice of events of POSSIBLE national security or public interest significance. | |||
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date. | |||
Facility: | Facility: | ||
Commonwealth Edison Company, Zion Station Zion, Illinois (50M53 G 030O | |||
==Subject:== | ==Subject:== | ||
INTRUDER APPREHENDED WITHIN PROTECTED AREA At 10:00 a.m. October 3, 1976, a seventeen-year old high school student, who was camping at Illinois State Beach Park, south of Zion Station, approached the southeast ec.rner of the protected area fence. | |||
INTRUDER APPREHENDED WITHIN PROTECTED AREA At 10:00 a.m. October 3, 1976, a seventeen-year old high school student, who was camping at Illinois State Beach Park, south of Zion Station, | l His presence was detected by the intrusion alarm and his movements were observed remotely on the CCTV system. | ||
approached the southeast ec.rner of the protected area fence. His presence was detected by the intrusion alarm and his movements were observed remotely on the CCTV system. Two guards were di'apatched to | Two guards were di'apatched to the scene. | ||
the scene. | The intruder continued north on the beach (public property) sgg and broke the Infra-red alarm beam when he climbed over the barbed i | ||
~ | |||
wire barrier fronting the concrete ' forebay wall. As he proceeded south k | |||
wire barrier fronting the concrete ' forebay wall. As he proceeded south | on the walkway of the forebay, he was apprehended by the guards. | ||
~ | |||
He offered no resistence. He was 1nterviewed by the shift supervisor who turned him over to the Zion Police. | |||
coming over the fence was "to see the reactor." He was held by the Zion Police for a few hours and turned over to his father. Commonwealth Edison plans to prefer charges for trespassing. At this time there has | The intruder's stated reason for coming over the fence was "to see the reactor." He was held by the Zion Police for a few hours and turned over to his father. | ||
Commonwealth Edison or Region III. | Commonwealth Edison plans to prefer charges for trespassing. At this time there has 6 | ||
been no known press coverage and no press release is planned by either | |||
/ | |||
Commonwealth Edison or Region III. | |||
j) l Region III received notification of this occurrence by telephone from Zion Station at 8:20 a.m. on October 4, 1976. | |||
The IAT has been notified. | The IAT has been notified. | ||
O | O | ||
==Contact:== | ==Contact:== | ||
RFWarnick, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 | RFWarnick, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 | ||
) | |||
Distribution: | Distribution: | ||
Chairman,Rowden | Chairman,Rowden Cou:sissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer. CA G. F. Murphy, JCAE Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, AIA K. R. Chapman, NMSS R. G. Ryan, OSP Transmitted: | ||
( | PBldg[ | ||
MNBB 2 , ; Luge | H St j | ||
EXEMPT FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790(d) t | ( | ||
j}} | MNBB 2, | ||
; Luge EXEMPT FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790(d) t 70 3 761004 PRELDIINARY NOTIFICATION E 056----- | |||
j PNS PDR | |||
-}} | |||
Latest revision as of 01:34, 3 December 2024
| ML20236J907 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 10/04/1976 |
| From: | Roy G, Thompson D, Warnick R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PNS-76-056, PNS-76-56, NUDOCS 9807090063 | |
| Download: ML20236J907 (1) | |
Text
-
- - c v ---
9 p
yyy PRELIMINARY NOTIFICATION A
- y EXEMPT FROM PUBLIC DISCLOSURE PURSUANT TO,10 CFR 2.790(d)
October 4, 1976 PRELDiINARY NOTIFICATION OF SAFEGUARDS EVENT--
PNS-76-56
,This preliminary notification constitutes EARLY notice of events of POSSIBLE national security or public interest significance.
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.
Facility:
Commonwealth Edison Company, Zion Station Zion, Illinois (50M53 G 030O
Subject:
INTRUDER APPREHENDED WITHIN PROTECTED AREA At 10:00 a.m. October 3, 1976, a seventeen-year old high school student, who was camping at Illinois State Beach Park, south of Zion Station, approached the southeast ec.rner of the protected area fence.
l His presence was detected by the intrusion alarm and his movements were observed remotely on the CCTV system.
Two guards were di'apatched to the scene.
The intruder continued north on the beach (public property) sgg and broke the Infra-red alarm beam when he climbed over the barbed i
~
wire barrier fronting the concrete ' forebay wall. As he proceeded south k
on the walkway of the forebay, he was apprehended by the guards.
~
He offered no resistence. He was 1nterviewed by the shift supervisor who turned him over to the Zion Police.
The intruder's stated reason for coming over the fence was "to see the reactor." He was held by the Zion Police for a few hours and turned over to his father.
Commonwealth Edison plans to prefer charges for trespassing. At this time there has 6
been no known press coverage and no press release is planned by either
/
Commonwealth Edison or Region III.
j) l Region III received notification of this occurrence by telephone from Zion Station at 8:20 a.m. on October 4, 1976.
The IAT has been notified.
O
Contact:
RFWarnick, IE x27261 GWRoy, IE x27261 DThompson, IE x27541
)
Distribution:
Chairman,Rowden Cou:sissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer. CA G. F. Murphy, JCAE Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, AIA K. R. Chapman, NMSS R. G. Ryan, OSP Transmitted:
PBldg[
H St j
(
MNBB 2,
- Luge EXEMPT FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790(d) t 70 3 761004 PRELDIINARY NOTIFICATION E 056-----
-