TXX-6966, Final Deficiency Rept CP-86-53 Re Seismic Design of Conduit. Initially Reported on 861021.Installation of Fiberglass Cloth/Resin Matl or Optional Conduit Supports Currently Scheduled for Completion by 880420: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ _ . | {{#Wiki_filter:_ _ _ _. | ||
1 | 1 | ||
(; | (; | ||
1 1 | |||
I | 'I g | ||
4 I | |||
= | |||
Log # TXX-6966 3 | |||
L 5 | |||
Fi1e #-10110 I | |||
.= | |||
Attention: | = | ||
i | .903.10-Ref #10CFR50.55(e) 1 | ||
: 7EFELECTRIC | |||
' Nove aber 13, 1987 Milliam G. Counsil-l\\ | |||
Emmtive Vice Prnident l | |||
-U. S. Nuclear Regulatory Commission Attention: | |||
Document Control Desk p | |||
Washington, D. C. 20555 L | |||
i | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK. STEAM ELECTRIC STATION (CPSES) | COMANCHE PEAK. STEAM ELECTRIC STATION (CPSES) | ||
DOCKET N05. 50-445 AND 50-446 SEISMIC DESIGN OF CONDVIT SDAR: | DOCKET N05. 50-445 AND 50-446 SEISMIC DESIGN OF CONDVIT SDAR: | ||
CP-86-53-(FINALREPORT) i Gentlemen: | |||
under the provisions of 10CFR50.55(e). Our latest report on this issue was | j | ||
The additional testing performed to evaluate the ability of the fiber glass | 'i On October 21, 1986, we notified you by our letter, logged TXX-6054, of a l | ||
deficiency involving the seismic design of conduit, which we deemed reportable under the provisions of 10CFR50.55(e). Our latest report on this issue was B | |||
Installation of the fiberglass cloth / resin material or optional conduit | TXX-6913, dated November 4,1987. | ||
Very truly yours, h,b b W. G. Co nsil 8711170177 871113 | c The additional testing performed to evaluate the ability of the fiber glass l | ||
y | cloth / resin material-to resist torsional moments has been completed. | ||
The test results indicate'that the fiberglass cloth / resin material will resist the torsional moments and is an acceptable solution for use outside containment'. | |||
RSB:tgj c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) | As an alternative, conduit supports may be substituted as required on a case by case basis for the fiberglass cloth / resin material to resist the torsional moments. | ||
i/ | Installation of the fiberglass cloth / resin material or optional conduit i | ||
supports is currently scheduled for completion by April 20, 1988. | |||
400 North Olive Street | Very truly yours, h,b b W. G. Co nsil l | ||
8711170177 871113 PDR ADOCK 05 5 | |||
g: | |||
y S | |||
D. R. Woodlan Supervisor, Docket Licensing | |||
{ | |||
RSB:tgj c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) p i/ | |||
\\ | |||
400 North Olive Street LB 81 Dallas, Texas 75201 | |||
-}} | |||
Latest revision as of 00:37, 3 December 2024
| ML20236P157 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/13/1987 |
| From: | Counsil W, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-86-53, TXX-6966, NUDOCS 8711170177 | |
| Download: ML20236P157 (1) | |
Text
_ _ _ _.
1
(;
1 1
'I g
4 I
=
Log # TXX-6966 3
L 5
Fi1e #-10110 I
.=
=
.903.10-Ref #10CFR50.55(e) 1
- 7EFELECTRIC
' Nove aber 13, 1987 Milliam G. Counsil-l\\
Emmtive Vice Prnident l
-U. S. Nuclear Regulatory Commission Attention:
Document Control Desk p
Washington, D. C. 20555 L
i
SUBJECT:
COMANCHE PEAK. STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 SEISMIC DESIGN OF CONDVIT SDAR:
CP-86-53-(FINALREPORT) i Gentlemen:
j
'i On October 21, 1986, we notified you by our letter, logged TXX-6054, of a l
deficiency involving the seismic design of conduit, which we deemed reportable under the provisions of 10CFR50.55(e). Our latest report on this issue was B
TXX-6913, dated November 4,1987.
c The additional testing performed to evaluate the ability of the fiber glass l
cloth / resin material-to resist torsional moments has been completed.
The test results indicate'that the fiberglass cloth / resin material will resist the torsional moments and is an acceptable solution for use outside containment'.
As an alternative, conduit supports may be substituted as required on a case by case basis for the fiberglass cloth / resin material to resist the torsional moments.
Installation of the fiberglass cloth / resin material or optional conduit i
supports is currently scheduled for completion by April 20, 1988.
Very truly yours, h,b b W. G. Co nsil l
8711170177 871113 PDR ADOCK 05 5
g:
y S
D. R. Woodlan Supervisor, Docket Licensing
{
RSB:tgj c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) p i/
\\
400 North Olive Street LB 81 Dallas, Texas 75201
-