Final Deficiency Rept CP-86-53 Re Seismic Design of Conduit. Initially Reported on 861021.Installation of Fiberglass Cloth/Resin Matl or Optional Conduit Supports Currently Scheduled for Completion by 880420
ML20236P157
Person / Time
Site: Comanche Peak  
Issue date: 11/13/1987
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-53, TXX-6966, NUDOCS 8711170177
Download: ML20236P157 (1)


Text

_ _ _ _.

1

(;

1 1

'I g

4 I

=

Log # TXX-6966 3

L 5

Fi1e #-10110 I

.=

=

.903.10-Ref #10CFR50.55(e) 1

7EFELECTRIC

' Nove aber 13, 1987 Milliam G. Counsil-l\\

Emmtive Vice Prnident l

-U. S. Nuclear Regulatory Commission Attention:

Document Control Desk p

Washington, D. C. 20555 L

i

SUBJECT:

COMANCHE PEAK. STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 SEISMIC DESIGN OF CONDVIT SDAR:

CP-86-53-(FINALREPORT) i Gentlemen:

j

'i On October 21, 1986, we notified you by our letter, logged TXX-6054, of a l

deficiency involving the seismic design of conduit, which we deemed reportable under the provisions of 10CFR50.55(e). Our latest report on this issue was B

TXX-6913, dated November 4,1987.

c The additional testing performed to evaluate the ability of the fiber glass l

cloth / resin material-to resist torsional moments has been completed.

The test results indicate'that the fiberglass cloth / resin material will resist the torsional moments and is an acceptable solution for use outside containment'.

As an alternative, conduit supports may be substituted as required on a case by case basis for the fiberglass cloth / resin material to resist the torsional moments.

Installation of the fiberglass cloth / resin material or optional conduit i

supports is currently scheduled for completion by April 20, 1988.

Very truly yours, h,b b W. G. Co nsil l

8711170177 871113 PDR ADOCK 05 5

g:

y S

D. R. Woodlan Supervisor, Docket Licensing

{

RSB:tgj c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) p i/

\\

400 North Olive Street LB 81 Dallas, Texas 75201

-