1 tSQ Ni.
w M
'I N
MM Log # TXX-6913-l h
5 File # 10110 0
=-
=
903.10
-j Ref- # 10CFR50.55(e)
L TUELECTRIC wmien c. coumn-November 4, 1987 Emutive W:q Presidem l I
-U. S. Nuclear. Regulatory Commission ATTN: Document Control Desk Washington,-'D.C. 20555 i
SUBJECT:
COMANCllE PEAK. STEAM ELECTRIC STATION (CPSES)
J !l DOCKET NOS. 50-445 AND 50-446 SEISMIC DESIGN OF CONDUIT l
SDAR: CP-86-53:(INTERIMREPORT) l Gentlemeni y
'On October 21, 1986, we notified you by our letter, logged TXX-6054, of a deficiency involving the seismic design of conduit,-which we deemed reportable under the provisions of 10CFR50.55(e). Our last report, logged TXX-6727.was l
submitted on Septem'oer 17, 1987.
This is an interim report submitted to status corrective action. implemented to date.
l In our last report (TXX-6727) we noted that the additional' testing performed
.to evaluate-the ability of the fiber glass cloth / resin material to resist torsional moments'had been completed. Currently, we are continuing our analysis of the_ test results to determine the required corrective actions for the affected conduits.
Our next report on this issue will be submitted no later than December 4, 1987.
Very truly yours,
]
h> (0 W. G. Counsil By:
D. R. Woodlan Supervisor, Docket Licensing j
I RSB/grr c - R. D. Martin, Region IV Resident Inspectors, CPSES (3) i A
/
IQ j
400 North Olive Street LB 81 Dallas, Texa.s 75201 l
n.