ML20236Q644: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ . _ _ _ _ _ _ -           _ _ _ _ _
{{#Wiki_filter:_ _ _ _ _ _. _ _ _ _ _ _ -
O
O
$8 ATTACIIMENT 1       ,
$8 ATTACIIMENT 1 i
i PROPOSED TECHNICAL SPECIFICATION PAGES 8711200200 871112 PDR   ADOCK 05000409 P               PDR PCl-39
PROPOSED TECHNICAL SPECIFICATION PAGES 8711200200 871112 PDR ADOCK 05000409 P
PDR PCl-39


6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1   The Plant Superintendent shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.
6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant Superintendent shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.
6.1.2 The Shift Supervisor (or during his absence from the Control Room, a designated individual) shall be responsible for Control Room command function.
6.1.2 The Shift Supervisor (or during his absence from the Control Room, a designated individual) shall be responsible for Control Room command function.
A management directive to this effect, signed by the highest level of corporate mar.cgement shall be reissued to all station personnel on an annual basis.
A management directive to this effect, signed by the highest level of corporate mar.cgement shall be reissued to all station personnel on an annual basis.
6.2 ORGANIZATION OFFSITE 6.2.1   The offsite organization for unit management and technical support shall be as shown on Figure 6.2 1-1.
6.2 ORGANIZATION OFFSITE 6.2.1 The offsite organization for unit management and technical support shall be as shown on Figure 6.2 1-1.
UNIT STAFF 6.2.2   The unit organization shall be as shown on Figure 6.2.2-1 and
UNIT STAFF 6.2.2 The unit organization shall be as shown on Figure 6.2.2-1 and a.
: a. Each on duty shift shall be composed of at least one Shift Supervisor with a Senior Reactor Operator License and one Operator, who is qualified as a Control Room watchstander.*
Each on duty shift shall be composed of at least one Shift Supervisor with a Senior Reactor Operator License and one Operator, who is qualified as a Control Room watchstander.*
: b. A qualified Control Room Operator or Shift Supervisor shall be within visual and/or audio distance of the Control Room annunciators.
b.
: c. All spent fuel handling shall be directly supervised by either a Licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling.
A qualified Control Room Operator or Shift Supervisor shall be within visual and/or audio distance of the Control Room annunciators.
: d. At least one additional Operator and one Health Physics Technician shall be onsite when spent fuel or a spent fuel shipping cask is being handled or when non-routine evolutions are being conducted in the Fuel Element Storage Well.
c.
* Shift crew composition may be one less than the minimum requirements for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.                           This provision does not permit any shift crew position to be unfilled upon shift change due to an oncoming shift crew member being late or absent.
All spent fuel handling shall be directly supervised by either a Licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling.
d.
At least one additional Operator and one Health Physics Technician shall be onsite when spent fuel or a spent fuel shipping cask is being handled or when non-routine evolutions are being conducted in the Fuel Element Storage Well.
* Shift crew composition may be one less than the minimum requirements for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
This provision does not permit any shift crew position to be unfilled upon shift change due to an oncoming shift crew member being late or absent.
6-0 l
6-0 l
Reference 5 also affects this page.
Reference 5 also affects this page.
PCl-39 E_____________________________________.___ _ _ _ _ _ _ __ _    _ _ _ _ _ _ _ . -
PCl-39 E_____________________________________.___


_ _ . - . = . _ _ - . . - - - - ._
_ _. -. =. _ _ -.. - - - -._
e d i THIS PAGE INTENTIONALLY LEFT BLANK.
e d i THIS PAGE INTENTIONALLY LEFT BLANK.
6-4 Reference 5 also affects this page.
6-4 Reference 5 also affects this page.
Line 47: Line 52:
1 1
1 1
1 i
1 i
_ _ ___ _                      D
D


MINIMUM STAFFING REQUIREMENT  
MINIMUM STAFFING REQUIREMENT  


==SUMMARY==
==SUMMARY==
 
Potential Accident Minimum Staffing CFH/SRO*
Minimum Staffing Potential Accident CFH/SRO*     Control Room                         Aux Operator                           Other Qualified   Qualified                             Qualified 1
Control Room Aux Operator Other Qualified Qualified Qualified Loss of Offsite Power 1
Loss of Offsite Power           1 Loss of FESW Cooling                           1 Uncontrolled Liquid Waste                       1                                   1 Discharge 1
1 Loss of FESW Cooling 1
FESW Pipe Break                 1 1
Uncontrolled Liquid Waste 1
Wind and Tornado                 1 1
1 Discharge FESW Pipe Break 1
Seismic Event                   1 1             1                                                                         2 Fire Spent Fuel Handling               1             1 Accident 1
1 Wind and Tornado 1
Shipping Cask or Heavy           1             1 Load Drop into FESW
1 Seismic Event 1
* Currently, the Shift Supervisor is required to be a licensed Senior Reactor Operator. After the Decommissioning Plan is approved, a certification program will be conducted in lieu of maintaining licensed operations personnel. The                                                     l Shift Supervisor will then be a Certified Fuel Handler, rather than an SRO.
1 Fire 1
1 2
Spent Fuel Handling 1
1 Accident Shipping Cask or Heavy 1
1 1
Load Drop into FESW Currently, the Shift Supervisor is required to be a licensed Senior Reactor Operator. After the Decommissioning Plan is approved, a certification program will be conducted in lieu of maintaining licensed operations personnel. The l
Shift Supervisor will then be a Certified Fuel Handler, rather than an SRO.
I l
I l
l
l
                                                                  ----------_--_______,,_,m.         _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _      _
----------_--_______,,_,m.


    . es i     '
es i
i l.
i l.
LOSS OF i
LOSS OF i
l Emergency Dieselj l       l--------jGenerators Startj---------------------------------------
l Emergency Dieselj l
l Loss   l l0f     l                                                                         - jlA EDG Sta l0ffsitej--------jlB EDG Starts                     l---l Operator Attemtpsl     l
l--------jGenerators Startj---------------------------------------
            .l Power l                         l1A EDG Doesn't   l     lTo Start 1A EDG l---l l0ccurs l                                                                         - l Operator l       l--                                                                           l Start 1A i
l Loss l
l                                                                     - l1B EDG Sta
l0f l
                          !                                                                  l l                                                                   l l-----l1A EDG Starts l-----l Operator Attemptsj---l l                   l1B EDG Doesn'tl       lTo Start 1B EDG l   l l                                                                     - l Operator l                                                                         l Start 1B l                                                                     - lBoth EDGs l                                                                   l l                                                                   l     l Operator S l                                                                     - l1B E       No l                                                                   l
- jlA EDG Sta l0ffsitej--------jlB EDG Starts l---l Operator Attemtpsl l
                          !                                                                  l l                                                                   l
.l Power l
                            ---- lNeither EDGl--------j0perator Attempts l-----joperator S l Starts   l           lTo Start Both EDGsl--       l1A       N l
l1A EDG Doesn't l
l    l Operator
lTo Start 1A EDG l---l l0ccurs l
                                                                                                - l Start Eith
- l Operator l
        - ~
l--
l Start 1A i
l
- l1B EDG Sta l
l l
l-----l1A EDG Starts l-----l Operator Attemptsj---l l
l1B EDG Doesn'tl lTo Start 1B EDG l
l l
- l Operator l
l Start 1B l
- lBoth EDGs l
l l
l l Operator S l
- l1B E No l
l l
l l
---- lNeither EDGl--------j0perator Attempts l-----joperator S l Starts l
lTo Start Both EDGsl--
l1A N
l l
l Operator
- l Start Eith
- ~


$ITE POWER l
$ITE POWER l
l llB FESW l                   l Operator Restarts l------------
l llB FESW l l Operator Restarts l------------
,_____________-----l Running l----l---lCCW Pumps                                                                                                                             l                                             l l l                                                                               l i
,_____________-----l Running l----l---lCCW Pumps l
l l
l l
l _____
l _____
0_-     e                                                                               I                                                                                                                                   1 0       8                                                                               8                                                                                             1                                     1 l                                                                               l                                                   - l operator Cross-                   ll                                      l
0_-
_      l                                                                               l                                                 l       l connects Ess. Buses l-                                                 l stl--(----------(--l1B FESW Pumps l---                                                                                                                                                                                     l
e I
_l     l                                 l                                             l                   l Running           l---joperator Restarts:------------
i 1
l                                 l                                             l                                                 l1B CCW Pumps                     l
0 8
        .                                .                                            i m      I                                 i                                             1 n                                 ,
8 1
= . .<__i                                  i t                                 i                                                                                                                               i i                                 1                                                                                                                               '
1 l
l                                 l                                                                                          -l operator Cross-                       l l
l
4 l
- l operator Cross-l l l
I li l connects Ess. Buses l
l l
_      $                                  1                                                                                       i stl--(----(--------lNeither FESWl-------j0perator Restarts                                                                                                                       l----------------
l l connects Ess. Buses l-l
_j     l i
_stl--(----------(--l1B FESW Pumps l---
l i
l
l i
_l l
l Pump Can Runl                     l1A CCW Pump                 j a                     !
l l
a ml- I                                     l I
l Running l---joperator Restarts:------------
i m                                        I                     i                                                                                                                                                           a re tsl------                                                         l                                                                                                                                                           TI LI                                                               !                                                                                                                      APERTUltE i,                                                                                                                                                CARD l
l l
i is-l_________                                                                                                                                                                       he Avadahle on Li                                                                                                                                                                                     %perture Card T j---------------lNeither FESWl--------lNeither CCW l--------------------
l l1B CCW Pumps l
Gl
i I
[D,G                                                                                                         l Pump Can Runl                       l Pump Can Runj (continued on next page) 3mlAObaOO-01
i 1
m
<__i n
i
=..
t i
i i
1 l
l
-l operator Cross-l l
l l l connects Ess. Buses l 4
I i
1 i
stl--(----(--------lNeither FESWl-------j0perator Restarts l----------------
_j l
l l
l Pump Can Runl l1A CCW Pump j
i i
i a
ml-I l
I a
i I
i a re tsl------
l TI m
LI APERTUltE i
CARD l
i is-l_________
he Avadahle on Li
%perture Card T j---------------lNeither FESWl--------lNeither CCW l--------------------
[D,G l l Pump Can Runl l Pump Can Runj G
(continued on next page) 3mlAObaOO-01


rr -.,--, --_ --
rr -.,--, --_ --
1
1 i
      .                                                                                                                                              i i
i LOSSOF0$
LOSSOF0$
(cos lHPSW Diesel (s)l lOperats
(cos lHPSW Diesel (s)l                                                                                             lOperats
-------l Start On Low l---------------------------------------------jCross-a l
                -------l Start On Low         l---------------------------------------------jCross-a l       lHPSW Pressure l                                                                                         l   lHPSW TG l                                                                                                                 l   l Coolers l       lHPSW Diesels   l   l0perator Attemptsj         l1A Or 1B HPSW l-
lHPSW Pressure l l
                        ----jDo Not Auto       l---lTo Start 1A Or 1Bj---jDiesel Startedj l Start         j   lHPSW Diesel           jj l lNeither HPSW                                         l
lHPSW TG l
                                                                              -l Diesel Can Be                                       l-----------o l Started                                             j lHPSW Diesel (s)l
l l Coolers l
                ---l Start On Low       l l lHPSW Pressure l                                                                       l 1
lHPSW Diesels l
1 1                                                                                         1 l lHPSW Diesels       l     l Operator Attemptsj       l1A Or 1B             l l l Operator                                 l
l0perator Attemptsj l1A Or 1B HPSW l-
                    -jDo Not Auto       l---lTo Start 1A Or 1Bj---lHPSW Diesell---l Manually                                                   l--c l Start         l     lHPSW Diesel         jj l Started                 l                     l Cross-                 l l                                               l connects               l l lNeither           l                           lHPSW To                 j
----jDo Not Auto l---lTo Start 1A Or 1Bj---jDiesel Startedj l Start j
                                                                        -jHPSW Can         l-                         lCCW Coolers!
lHPSW Diesel jj l lNeither HPSW l
;.                                                                        lBe Started l l l
-l Diesel Can Be l-----------o l Started j
                                              ................................<..,/                             ................o 1
lHPSW Diesel (s)l
i l         lTo Compensate For           !
---l Start On Low l
                -----------------------------instrumentation                         l------------------------o lWithout Power And/or!
l lHPSW Pressure l l
lAfter Batteries Are l l Depleted, Operator l l Checks FESW Locally l l Periodically               j
1 1
1 1
l lHPSW Diesels l
l Operator Attemptsj l1A Or 1B l l l Operator l
-jDo Not Auto l---lTo Start 1A Or 1Bj---lHPSW Diesell---l Manually l--c l Start l
lHPSW Diesel jj l Started l
l Cross-l l
l connects l
l lNeither l
lHPSW To j
-jHPSW Can l-lCCW Coolers!
lBe Started l l l
................................<..,/
................o 1
i l
lTo Compensate For
-----------------------------instrumentation l------------------------o lWithout Power And/or!
lAfter Batteries Are l l Depleted, Operator l
l Checks FESW Locally l l Periodically j
* As of January 1, 1988
* As of January 1, 1988


Line 124: Line 207:
iSITE POWER
iSITE POWER
;'d)
;'d)
JHanually!                                   l Adequate FESW     j   l Evaluate Emergency l           lMake Required l inn: cts                               l----l Cooling Achieved l---l Plan                         l---l Notifications l CCW                                   l i
JHanually!
l o______._______________
l Adequate FESW j
l Evaluate Emergency l lMake Required l inn: cts l----l Cooling Achieved l---l Plan l---l Notifications l CCW l
i l
o______._______________
l 1
l 1
i l
i l
l l
l l
l i,
l i,
/some FESW Cooling l                                     l                                                           '{'{
/some FESW Cooling l l
&chieved. As Con-l--                                     l
'{'{
.e rvatism Assume l                                   ll                                                       APER,I,URE4 2 me As No Cooling l                                   ll ll                               l Operator Addsj CARD ll                           - l Colder Water l l j                       j     lFrom OHST         l   Also AvaMahle on ll                               lWhich Delays l a_-------------------                                     l l
&chieved. As Con-l--
l    l Boiling         l bdure Ord l                       l o------------------l Evaluate l---lMake                                       l---lFESW         l-------------------
l
l Emergency l   l Required l     l Starts l l Plan     l   lNotifi- l       l Boiling l l cations l       lAfter     l l5 Days *l i-S711ao0800 - ca.
.e rvatism Assume l ll APER,I,URE4 2 me As No Cooling l ll CARD ll l Operator Addsj ll
- l Colder Water l l j j
lFrom OHST l
Also AvaMahle on ll l
lWhich Delays l bdure Ord a_-------------------
l l
l Boiling l
l l
o------------------l Evaluate l---lMake l---lFESW l-------------------
l Emergency l l Required l l Starts l l Plan l
lNotifi-l l Boiling l l cations l lAfter l
l5 Days *l i-S711ao0800 - ca.
1 (continued on next page)
1 (continued on next page)
?
?
i I
i I
b     _ _ _ _ _ _ . _ . _ _ _ _ . _ _  .                    _                                    _                                  .b
b
.b


LOSS OF d (cs l Operator Adds   l       l Operator Adds   l
LOSS OF d (cs l Operator Adds l
                                                                      - l Colder Water       j   - l Colder Water     l l     lFrom OHST Whichl   l     lFrom OHST Whichj j     l Delays Control l   l     l Delays Fuel     j j     l Rod Uncovering l   l     jUncovering       l l                         l l     l Tops of     j     l     l Top Of Fuel   j
l Operator Adds l
                                                            ----------l Control Rods!-----------l Uncovered         l l Uncovered atl           lat 23.1 Days *l l13.6 Days
- l Colder Water j
- l Colder Water l
l lFrom OHST Whichl l
lFrom OHST Whichj j
l Delays Control l l
l Delays Fuel j
j l Rod Uncovering l l
jUncovering l
l l
l l Tops of j
l l Top Of Fuel j
----------l Control Rods!-----------l Uncovered l
l Uncovered atl lat 23.1 Days *l l13.6 Days
* l l
* l l
l l
l l
                                                            *As of January 1, 1988 1
*As of January 1, 1988 1
f.
f.
iI   _ _ _ _ _ _ _ _ . _ . _ _ _ _ . _ . _ _ _ . _ _ _ _ _
iI


manm_--
manm_--
Line 153: Line 263:
$ITE POWER d) l rgig APERTURE CARD Also AvaHahle On Aperture Card 8'1II9009D0- 05
$ITE POWER d) l rgig APERTURE CARD Also AvaHahle On Aperture Card 8'1II9009D0- 05


s LOSS OF OFFSITE POWER NO. OF PEOPLE                 LOCATION TASK                                                       C.R. 1 PLANT               l OF EVOLUTION l COMMENTS
s LOSS OF OFFSITE POWER NO. OF PEOPLE LOCATION TASK C.R.
                                                                                !              l                                                                        l
1 PLANT l OF EVOLUTION l COMMENTS l
: 1. Loss off offsite power                                   1         l             l Control Room l Recognize alarm occurs.                                                             l             l                                                                         l l             l                                                                         l l             l                                                                         l
l
: 2. Operator attempts                                         1         l             l Control Room j to start diesels.                                                   l             l                                                                         l l               l                                                                         !
: 1. Loss off offsite power 1
                                                                                !              l                                                                         !
l l Control Room l Recognize alarm occurs.
: 3. Operator cross-                                           1         l             l Control Room j connects Ess. Buses.                                                 l             l                                                                         l l             l                                                                         l
l l
                                                                                \             l                                                                         l
l l
: 4. Operator restarts                                         1         l             l Control Room j CCW pumps.                                                           l             l                                                                         l I                                                                         I
l l
                                                                                \             l                                                                         l S. Operator starts HPSW                                     1           l             l Control Room l Pumps.                                                               l             l                                                                         l l             l                                                                         l l             l                                                                         l
l l
: 6. Operator starts HPSW                                                 j           1 l Cribhouse                                                               j locally.                                                             l             l                                                                         l
l
                                                                                  \             \                                                                         \
: 2. Operator attempts 1
l             l                                                                         l
l l Control Room j to start diesels.
: 7. Operator cross-                                                       l           1 i Turbine Bldg.j connects HPSW to CCW                                                 j             l Mezz.                                                                   l Coolers.                                                             l             l                                                                         l l             l                                                                         l l             l                                                                         l
l l
: 8. Operator takes local                                                 l           1 l Cont. Bldg.                                                             l FESW 1evel.                                                           l             l 701' Level                                                             l l             l                                                                       \
l l
l             l                                                                         l
l l
: 9. Operator adds water to                                                 l         1 l Cont. Bldg. j FESW.                                                                 l             l 701' Level orj l             l Relief Valve l                                                                                 .'
: 3. Operator cross-1 l
l            l Platform                                                               j i             l                                                                         l l             !                                                                        l
l Control Room j connects Ess. Buses.
: 10. Evaluate as per                                         1           l             l Control Room l Certified Fuel Emergency Plan.                                                     l             l                                                                         l Handler l             l                                                                         l
l l
                                                                                  \             l                                                                         l Page 1 of 2
l l
l l
\\
l l
: 4. Operator restarts 1
l l Control Room j CCW pumps.
l l
l I
I
\\
l l
S. Operator starts HPSW 1
l l Control Room l Pumps.
l l
l l
l l
l l
l
: 6. Operator starts HPSW j
1 l Cribhouse j
locally.
l l
l
\\
\\
\\
l l
l
: 7. Operator cross-l 1
i Turbine Bldg.j connects HPSW to CCW j
l Mezz.
l Coolers.
l l
l l
l l
l l
l
: 8. Operator takes local l
1 l Cont. Bldg.
l FESW 1evel.
l l 701' Level l
l l
\\
l l
l
: 9. Operator adds water to l
1 l Cont. Bldg.
j FESW.
l l 701' Level orj l
l Relief Valve l l
l Platform j
i l
l l
l
: 10. Evaluate as per 1
l l Control Room l Certified Fuel Emergency Plan.
l l
l Handler l
l l
\\
l l
Page 1 of 2


I l
I l
LOSS OF 0FFSITE POWER NO. OF PEOPLE       LOCATION TASK                               C.R. ! PLANT   ! 0F EVOLUTION l COMMENTS l       l               l
LOSS OF 0FFSITE POWER NO. OF PEOPLE LOCATION TASK C.R.
: 11. Make notifications as           1     l       l Control Room l per Emergency Plan.                   l       l               l Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified l
! PLANT
                                                                                                        )
! 0F EVOLUTION l COMMENTS l
l                                                                                                       I 1
l l
1 Page 2 of 2 I
: 11. Make notifications as 1
m_ _ _ - - -                        -    - - -        -  --      - - - - - -    -  -- -
l l Control Room l per Emergency Plan.
l l
l Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified l
)
l I
1 1
Page 2 of 2 I
m_ _ _ - - -
i
i


y LOSS l
y LOSS l
l l
l l
lBoth FESW l     l Loss Ofl l Pumps Failj---lFESW       l--------------------------------------------
lBoth FESW l l Loss Ofl l Pumps Failj---lFESW l--------------------------------------------
l Cooling l                                                     l i
l Cooling l l
l I
i l
i lBoth CCW j       l Loss Ofl                                                     l l Pumps Faill---jFESW         l                                                   l lOr CCW     l     l Cooling l                                                   l l System     j                                                                   l---jo l Shutdown l                                                                     l     lM l     lF l     lP lBoth LPSW l       l Loss Ofl     l Operator!   lHPSW Cross!     lFESW     l   l     l l Pumps Faill---jFESW         l---lAttemptsj---jConnected l---l Cooling l         l l0r LPSW   l     l Cooling l     lTo Cross-                     l Restored!   l l System     l                     l Connect j                                   j l Shutdown   l                     lHPSW To j     jHP5W Cannotj                 j lCCW       l---jBe Cross-   l---------------l l                                                                             l Coolers l   l Connected l                 l l Loss Ofl                                                                       l lFESW     l                                                                       l l Cooling l                                                                       l lFor     l lOther j lCause l u_   _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _
I i
lBoth CCW j l Loss Ofl l
l Pumps Faill---jFESW l
l lOr CCW l
l Cooling l l
l System j
l---jo l Shutdown l l
lM l
lF l
lP lBoth LPSW l l Loss Ofl l Operator!
lHPSW Cross!
lFESW l
l l
l Pumps Faill---jFESW l---lAttemptsj---jConnected l---l Cooling l l
l0r LPSW l
l Cooling l lTo Cross-l Restored!
l l System l
l Connect j j
l Shutdown l
lHPSW To j jHP5W Cannotj j
lCCW l---jBe Cross-l---------------l l
l Coolers l l Connected l
l l Loss Ofl l
lFESW l
l l Cooling l l
lFor l
lOther j lCause l
u_


F FESW COOLING l
F FESW COOLING l
                            -l Action Taken) l lTo Restore   l l l Cooling       l l
-l Action Taken) l lTo Restore l
l l                        l Time To Boiling l l l Operator Adds!       lAnd Uncovery     l l-l Water to FESWl---l Increases           l I
l l Cooling l
l rator j     l Operator j l lOperatorj     lFESW       l   l Top Of   l     l Top Of l itors l---l Monitors l---l Monitors l---l Commences l---l Control M Temp!                                                                l---l Fuel       l lFESW     j lCB Rad- l   l Boiling j     l Rods       j     (Un-iodi- l     l Level   l     liation l   lAfter     j   lUncoveredj l covered l ly   -l   lPeriodi- l     l Levels j   j5 Days     l   l13.6 Daysj       l23.1     l lcally   l     lPeriodi-l                                       l Days   j lcally   l TI APERTURE CARD Also AvaMahle On HAparture Card 81II9000D0 - 04
l l
l l Time To Boiling l l l Operator Adds!
lAnd Uncovery l
l-l Water to FESWl---l Increases l
I l
rator j l Operator j l lOperatorj lFESW l
l Top Of l
l Top Of l itors l---l Monitors l---l Monitors l---l Commences l---l Control l---l Fuel l
M Temp!
lFESW j
lCB Rad-l l Boiling j
l Rods j
(Un-iodi-l l Level l
liation l
lAfter j
lUncoveredj l covered l ly
-l lPeriodi-l l Levels j
j5 Days l
l13.6 Daysj l23.1 l
lcally l
lPeriodi-l l Days j
lcally l
TI APERTURE CARD Also AvaMahle On HAparture Card 81II9000D0 - 04


4 LOSS OF FESW COOLING LOCATION                               .l TASK                           NO. OF PEOPLE     j OF EVOLUTION l           COMMENTS C.R. l Plant     l                  l
4 LOSS OF FESW COOLING LOCATION
                                                    !          l                   l                           !
.l TASK NO. OF PEOPLE j OF EVOLUTION l COMMENTS C.R. l Plant l
                                                                                                              .j
l l
: 1. Recognize loss               1   l           l Control Room l of FESW cooling               l           l                   l
l
                                                    \           l                   l l         l                   l
: 1. Recognize loss 1
: 2. Operator tries to                 i     1   j T.B. Mezz.       l                             l j
l l Control Room l
cross-connect HPSW             l           l Floor             l; j           j                  l to CCW Coolers.
.j of FESW cooling l
l           l                   l
l l
: 3. Operator monitors           1     l           l Control Room l FESW temperature.               l           l                   l l           l                   l l           l                   l                             l
\\
: 4. Operator monitors             1     l         l Control Room j                                 {
l l
FESW 1evel.                       l     1     l or 701 Level l l           l                   l l                             l
l l
: 5. Operator adds water           1     l           l Control Room j l                  l to FESW.-                       l l           l                   l l           l                   l
l
: 6. Operator monitors             1     l           l Control Room j Containment Building             j           j                   l l
: 2. Operator tries to i
Rad levels.                       l           l                                           ,
1 j T.B. Mezz.
l         !                    !                        '
l l
7.~ Action taken to             1     l           l Control Room j       ESWSS Restore FESW ccoling.             l   2     j Outside & T.Bj       Possibly (long term)                       l           l Grade.           l I
cross-connect HPSW l
l          l Location         l j         j could vary         l                     '
l Floor l;
l           j depending on j j         j cause.             l                     ;
j to CCW Coolers.
Minimum Staffing Requirement 1 Control Room Qualified Operator a
j j
Page 1 of 1   l I
l l
t L
l l
: 3. Operator monitors 1
l l Control Room l FESW temperature.
l l
l l
l l
l l
l l
: 4. Operator monitors 1
l l Control Room j
{
FESW 1evel.
l 1
l or 701 Level l l
l l
l l
: 5. Operator adds water 1
l l Control Room j to FESW.-
l l
l l
l l
l l
l
: 6. Operator monitors 1
l l Control Room j Containment Building j
j l
Rad levels.
l l
l l
7.~ Action taken to 1
l l Control Room j ESWSS Restore FESW ccoling.
l 2
j Outside & T.Bj Possibly (long term) l l Grade.
l l
l Location l
I j
j could vary l
l j depending on j j
j cause.
l Minimum Staffing Requirement 1 Control Room Qualified Operator a
Page 1 of 1 l
I t
L


                ,d 9n-UNCONTROLLED l Operator Starts Pumping l     l Contents Of   j l Waste or Retention Tank l---l Normal Activity l lTo River Which Is Not j l Sampled Or Was         l---l Contents Of l---l Waste Water       l---l Auto Val l Incorrectly Analyzed   l     lHigh Activity l   l Monitor Alarms l     l Closes O lHigh Acti lTerminati lDischa
,d 9n-UNCONTROLLED l Operator Starts Pumping l l Contents Of j
l Waste or Retention Tank l---l Normal Activity l lTo River Which Is Not j
l Sampled Or Was l---l Contents Of l---l Waste Water l---l Auto Val l Incorrectly Analyzed l
lHigh Activity l l Monitor Alarms l l Closes O lHigh Acti lTerminati lDischa


hUIDWASTEDISCHARGE
hUIDWASTEDISCHARGE
~
~ l---l Auto Valvej
l---l Auto Valvej       - l Operator Closesj--------------
- l Operator Closesj--------------
l     l Fails To l---l jValve From C.R.l                       l yl     'lClose     l   l                                       l   l Call In l l                     l                                       l--l Desired j
l l Fails To l---l jValve From C.R.l l
_l                     l                                       l   lPersonnelj l                                       l l     l Valve Will Notl--l Operator l-
yl
                          - lClose Remotely l l Terminates!
'lClose l
l Discharge l l Locally   j ryrg APERTURE CARD Also AvaMahle On
l l
                                                                        ~%perture Card 89 IDotoD2 sod- 06
l Call In l
l l
l--l Desired j
_l l
l lPersonnelj l
l l
l Valve Will Notl--l Operator l-
- lClose Remotely l l Terminates!
l Discharge l l Locally j
ryrg APERTURE CARD Also AvaMahle On
~%perture Card 89 IDotoD2 sod- 06


UNCONTROLLED LIQUID WASTE DISCHARGE OPERATOR RESPONSE ACTIONS
UNCONTROLLED LIQUID WASTE DISCHARGE OPERATOR RESPONSE ACTIONS
                                                                                                              ~ LOCATION NO. 0F PEOPLE   l OF EVOLUTION l         COMMENTS
~ LOCATION TASK NO. 0F PEOPLE l OF EVOLUTION l COMMENTS C.R.
!                                                        TASK
j Plant-l l
'                                                                                        C.R. j Plant-   l                 l i                 j 1
1 i
j l
: 1. Operator observes high 1
l l Control Room l l
waste water activity
.l l
l alarm.
j l
l l
L l
o
: 2. Operator checks waste 1
l l Control Room l water activity monitor.
l l
l l
I I
l I
l l
: 3. Operator checks flow to' 1
j j Control Room j see if valve closed.
I j
l l
l l
\\
l l
: 4. Operator tries to close 1
l l Control Room l valve using thumb-l l
l wheel.
l l
l l
l l
l
: 5. Operator manually closes l
1 l T.B. Grade l
valve near standpipe.
j l
l l
\\
\\
l l
l
: 6. Operator stops running i
1 l T.B. Tunnel l
l l
l or C.B.
l pump.
l l Basement l
l l
l
l
: 1. Operator observes high 1      l        l Control Room l waste water activity              .l        l                l l                                                                                                j alarm.                                      l                l l        !                !
: 7. Call in desired 1
o L                                                                                                  l        !                !
l j
: 2. Operator checks waste          1       l        l Control Room l                              ;
j personnel.
water activity monitor.              l       l                l l
l l
I        I                l l                l                          l I
l l
: 3. Operator checks flow to'      1      j        j Control Room j j
see if valve closed.                I                          l l        l                l
                                                                                                    \        l                l
: 4. Operator tries to close        1      l        l Control Room l valve using thumb-                  l        l                  l wheel.                                l        l                l l                          I l        l l                !                          !
: 5. Operator manually closes                l  1    l T.B. Grade      l valve near standpipe.                j         l                l                        ,
l l        \                \
l        l                l
: 6. Operator stops running                  i  1    l T.B. Tunnel    l                        l pump.                                  l        l or C.B.        l                        l l Basement        l                        l l                                                    '
l       l                 l j                j
: 7. Call in desired                1        l personnel.                              l        l                l l
Onshift Staffing Required (Minimum Required) 1 in Control Room - Control Room Qualified Operator 1 in Plant - Auxiliary Operator Qualified Page 1 of 1 l
Onshift Staffing Required (Minimum Required) 1 in Control Room - Control Room Qualified Operator 1 in Plant - Auxiliary Operator Qualified Page 1 of 1 l
l 1
l 1


        .=-
.=-
7 i
7 i
I i
I i
l                                                                                                       FESW SYSTEM lFESW System l     IFESW Startsj           lFESW Lo/Highl           l Operator!       l Operator l                 l l           l Pipe Breaksj---lTo Lose           l---l Alarms In           l---l Checks l---l Checks l---l l Water         l       l Control Room l         jFESW       j     l Rad                     l   l lWhen Level l           l Level     l     l Monitors!                   l l Drops To         l                                                     l l695'             l l Operator Checks l     l Operator Initiates!
l FESW SYSTEM lFESW System l IFESW Startsj lFESW Lo/Highl l Operator!
            -----l0ut Situation Inl---l Additional Makeup l---
l Operator l l
l   l Protective Cloth-                                           l l   ling With Rad       l j   l Monitor If No     l l l   lHigh Rad Alarms l     l       l Operator l         l Operator       l     lWhen level                     l l                           l---l Secures             l---lDe-energizes     l---jReaches ~                       l--
l l Pipe Breaksj---lTo Lose l---l Alarms In l---l Checks l---l Checks l---l l Water l
l                           l       jFESW Pumpj           l Electrical     l     l686' Control!
l Control Room l jFESW j
l Equipment Inj         l Rod In Upper!
l Rad l
l Cont. Bldg. l         l Tier Start. l lTo Uncover                     l lOnce Level Stabilizes!             l Estimate Dose l           l Call In     l     l Assess
l lWhen Level l
            -----l Operator May Secure l---lIn Containment---l Additional l---l Corrective l Remote Fill Valve         l       l Building             l     l Personnel l         l Action l Options
l Level l
            *0ther FESW Lines Penetrate The Well Higher Except For The Bottom Entry Pump
l Monitors!
      -w
l l Drops To l
l l695' l
l Operator Checks l l Operator Initiates!
-----l0ut Situation Inl---l Additional Makeup l---
l l Protective Cloth-l l
ling With Rad l
j l Monitor If No l
l l
lHigh Rad Alarms l l
l Operator l l Operator l
lWhen level l
l l---l Secures l---lDe-energizes l---jReaches ~
l--
l l
jFESW Pumpj l Electrical l
l686' Control!
l Equipment Inj l Rod In Upper!
l Cont. Bldg. l l Tier Start. l lTo Uncover l
lOnce Level Stabilizes!
l Estimate Dose l l Call In l
l Assess
-----l Operator May Secure l---lIn Containment---l Additional l---l Corrective l Remote Fill Valve l
l Building l
l Personnel l l Action l Options
*0ther FESW Lines Penetrate The Well Higher Except For The Bottom Entry Pump
-w


i
i
                                                                                                                                                                                            -I
-I
                                                                                                                                                                                                .j 1
.j 1
J
J
}PE~ BREAK 1 4
}PE~ BREAK 1 4
1
1
:l I
:l I
                                                                                                                                                                                              .i i
.i i
st. Bldg.'-(CB)l         -l Operator Opens l-                                             l Operator Checks!                                                     lOperatorj                     ,'
st. Bldg.'-(CB)l
Boding, Alarms l---lFESW Remote                                                     l---lDemin Water                                                       l---lMay Iso-l------
-l Operator Opens l-l Operator Checks!
Deictor,DC         l       l Fill Valve                                             l-   l Availability                                                   l   l late-CB l pund: Alarms Inj '
lOperatorj Boding, Alarms l---lFESW Remote l---lDemin Water l---lMay Iso-l------
atrol' Room-       j
Deictor,DC l
                                                                                                                                                                                            ' l, l Operator In l'
l Fill Valve l-l Availability l
                - l Control' Room l                                               -
l late-CB l pund: Alarms Inj '
            'l     l Checks Rad j                                                 l 2rea Rad j. l'       l Monitor                                               l     l     l Lowest Level                                                   l Normal FESW     l Monitor. l--l       l Reading                                               ~l. l---l Reached Is l---l Cooling Un-                                                       l- --         .,
atrol' Room-j
j~ 679'                                                          lAvailable, 11 arms Irl- lL                                                                     l                                                                     l                   j sontroll l     l     lEveryone In .l l                                                                                                                     lSee Loss Of     l~
' l, l Operator In l'
loom And-l. l .jArea' Evacuates l l                                                                                                                         lFESW Scenario.l Locally ~l-         .l Including                                                 l-                                                                           lThough Less     l l Operator                                                 j                                                                           jTime is Avail-l lable For Action lTo Restore     l l Cooling, > 1   l l Day Still To   l l Boiling       l
- l Control' Room l
  -l Team Re-enter l p-lCB for Assess-
'l l Checks Rad j l
  .'jmsnt And/or -l I
2rea Rad j. l' l Monitor l
['******                                                                                                                                                     g r1tI,2Db2DO- Ola L~
l l Lowest Level l Normal FESW l
Monitor. l--l l Reading
~l.
l---l Reached Is l---l Cooling Un-l- --
11 arms Irl-lL l
j~ 679' l
lAvailable, j
sontroll l l
lEveryone In
.l l
lSee Loss Of l~
loom And-l. l.jArea' Evacuates l l
lFESW Scenario.l Locally
~l-
.l Including l-lThough Less l
l Operator j
jTime is Avail-l lable For Action lTo Restore l
l Cooling, > 1 l
l Day Still To l
l Boiling l
-l Team Re-enter l p-lCB for Assess-
.'jmsnt And/or -l I
['******
g r1tI,2Db2DO-Ola L~
TI
TI
.scharge Line Which Has Redundant Check Valves.                                                                                                                       APERTURE f
.scharge Line Which Has Redundant Check Valves.
APERTURE f
CARD
~
~
CARD r
r Also XvaMahle On
Also XvaMahle On
~%perture Card
                                                                                                                                                                      ~%perture Card


m.;         ,
m.;
      -r E+                                               ,
-r E+
FESW' SYSTEM PIPE BREAK
FESW' SYSTEM PIPE BREAK
                                                                                                                                                                                                                                                                                                                          .1 NO.:0F~ PEOPLE-                                                 -LOCATION:
.1 NO.:0F~ PEOPLE-
TASK-                                                                                                                                 C.R. !' PLANT
-LOCATION:
                                                                                                                                                                                                                                                    ~
TASK-C.R.
l OF EVOLUTION !' COMMENTS l             l                       l'
!' PLANT l OF EVOLUTION !' COMMENTS
: 1. Low'FESW alarm.                                                                                                                         .1                                 j.             l Control Room'l-
~
:l             gl                         l                                                               -l l             l                       l 2.LOperator checks FESW                                                                                                                   'l -                           .l         .. j Control' Room l
l l
                                          . level.-                                                                                                                                                         ,j           1     l 701'' Level           l I         'l                       .l
l'
: 3. Operator checks' Rad.                                                                                                                     1-                               j.           l Control Room l-monitors.                                                                                                                                                             j'         .l                         l                                                                   !
: 1. Low'FESW alarm.
l             j                       i                                                                     :
.1 j.
I              i                       l Containment Building
l Control Room'l-
                            ' 4'.                                                                                                                                               1                                l          - l Control Room.l
:l gl l
                                          ' flooding alarm & DC.                                                                                                                                                l              j.                      l Ground alarm.
-l l
: l.            l                  'l                                                                      1
l l
                                                                                                                                                                                                                  !.            l                      l l              l                .
2.LOperator checks FESW
'l -
.l j Control' Room l
. level.-
,j 1
l 701'' Level l
I
'l
.l
: 3. Operator checks' Rad.
1-j.
l Control Room l-monitors.
j'
.l l
l j
i I
i l
' 4'. Containment Building 1
l
l
: 5. Operator, opens FESW 1                               l             l Control Room l Makeup Valve.                                                                                                                                                         l             l                       l                                                                     ,
- l Control Room.l
l             l                       l                                                                    l
' flooding alarm & DC.
                                                                                                                                                                                                            -l                 l-                     l 6.. Operator checks Demin 1                               l             l Control Room l                                                                             'I Water availability.                                                                                                                                                 l             l                       l l             l                       I.
l j.
I             i                       !
l Ground alarm.
                            -7.-Operator isolates                                                                                                                             1                               l             l Control Room l Cont. Bldg..                                                                                                                                                         l       1   j Locally iso- l l             l lates manual l l             l valves in             l l             l T. B. Tunnel l l             l                       l                                                                       :
l.
i             i                       !
l
: 8. Operator enters Cont.                                                                                                                     I                               j.
'l 1
                                                                                                                                                                                                                            'l Control Room l Bldg.'to check out                                                                                                                                                 j       1     l                       l situation if possible.                                                                                                                                             l             l                       l l             !                      !
l l
                                                                                                                                                                                                          .l                 1                       i 9.: Operator, initiates' l Relief Valve l
l l
                                                                                                                                                                                                          -l            1 additional makeup.                                                                                                                                                 l             l Platform             l I             I                       l                                                                     \
l
                                                                                                                                .                                                                              l             \                       l
: 5. Operator, opens FESW 1
: 10. Operator secures FESW                                                                                                                   1                                 l             l Control Room l
l l Control Room l Makeup Valve.
                                      , ' pump.~                                                                                                                                                               j       'l     l C.B. Grade           l l             l Floor                 l l                                                                                                                                                                                                                                                                 Page 1 of 2
l l
_ _ . . , _ _ _ _ _ _ -                      _ _ _ _ _ - _ . - _ - - - _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                      - - -  - - - - - - - - - - - - - - - - - - - - - - ~ - - - ~
l l
l l
l
-l l-l 6.. Operator checks Demin 1
l l Control Room l
'I Water availability.
l l
l l
l I.
I i
-7.-Operator isolates 1
l l Control Room l Cont. Bldg..
l 1
j Locally iso-l l
l lates manual l l
l valves in l
l l T. B. Tunnel l l
l l
i i
: 8. Operator enters Cont.
I j.
'l Control Room l Bldg.'to check out j
1 l
l situation if possible.
l l
l l
.l 1
i 9.: Operator, initiates'
-l 1
l Relief Valve l additional makeup.
l l Platform l
I I
l
\\
l
\\
l
: 10. Operator secures FESW 1
l l Control Room l
, ' pump.~
j
'l l C.B. Grade l
l l Floor l
l Page 1 of 2
- ~ - - - ~


!                                                                                                                                                        I l.
I l.
l                                                                                           FESW SYSTEM PIPE BREAK                                       l I
l FESW SYSTEM PIPE BREAK l
NO. OF PEOPLE               LOCATION TASK                                                               C.R. ! PLANT       ! 0F EVOLUTION l COMMENTS I             l                   !
I NO. OF PEOPLE LOCATION TASK C.R.
11.. Operator opens MCA                                             1   l             l Control Room i breaker switch,                     j             j                   l l             l                   l l                   l l             l l
! PLANT
: 12. Operator received Hi                                             1   l             l Control Room l                         J Rad monitor alarms &               l             l                   l evacuates Cont. Bldg.             l             l                   j                   f l             l                   l                   \
! 0F EVOLUTION l COMMENTS I
                                                                                                  !            l                   l                   \
l 11.. Operator opens MCA 1
l l Control Room i breaker switch, j
j l
l l
l l
l l
l
: 12. Operator received Hi 1
l l Control Room l l
J Rad monitor alarms &
l l
l evacuates Cont. Bldg.
l l
j f
l l
l
\\
l l
\\
t
t
: 13. Estimate dose in Cont.                                         1   l             l Control Room l CFH Qualified Bldg.                               l             l                   l l             l                   l
: 13. Estimate dose in Cont.
                                                                                                  !            !                    l
1 l
: 14. Call in more                                                   1     l           l Control Room j personnel.                         l           l                   l l           l                   l l           l                   l
l Control Room l CFH Qualified Bldg.
: 15. Assess corrective                                               1     l           l Control Room l Long term. No one actions and teau                   j 2         l Cont. Bldg. l enters alone after     ,
l l
enters Cont. Bldg.                 l           l                   l eracuation. l to assess or repair.               l           l                   l Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified
l l
                                                                                                                                                        \
l l
l
: 14. Call in more 1
l l Control Room j personnel.
l l
l l
l l
l l
l
: 15. Assess corrective 1
l l Control Room l Long term. No one actions and teau j
2 l Cont. Bldg.
l enters alone after enters Cont. Bldg.
l l
l eracuation.
l to assess or repair.
l l
l Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified
\\
1 1
1 1
l i
l i
Line 341: Line 806:
0 l
0 l


a_ . -
a_. -
i, WIND
i, WIND
_ lIf Operator l_
_ lIf Operator l_
l   lIs In C.B.,l l l   j0perator   ll l Design l     l Containment l   l Turbine l   lIf Stacksj   j   l Survives   ll l Basis   l---l Building     l---l Building l---jFall,Theyj---l                   l--
l lIs In C.B.,l l
lHigh     l     l Withstands l   l Diesel l   lDo Not     l   l lIf Operator l l l Wind Orl     l Event       l   l Building l l Impact CBl   l_lIs Elsewherel_l l Tornado l                       lCribhse j                       lMay Survive j l Event l                         l Switch- l l0ccurs*l                         l yard Arej l Damaged j
l j0perator ll l Design l l Containment l l Turbine l lIf Stacksj j
l Survives ll l Basis l---l Building l---l Building l---jFall,Theyj---l l--
lHigh l
l Withstands l l Diesel l
lDo Not l
l lIf Operator l l l Wind Orl l Event l
l Building l l Impact CBl l_lIs Elsewherel_l l Tornado l lCribhse j lMay Survive j l Event l
l Switch-l l0ccurs*l l yard Arej l Damaged j
* Of Magnitude and Causing Damage as Discussed in the Consequence Study.
* Of Magnitude and Causing Damage as Discussed in the Consequence Study.


_ _ _ _ . _ . _ _ _ _ _ _ _ _ _                                                ,,      _ ,          mm..
mm..
o 7
o 7
                                                                            )
)
iTORNADO' s,
iTORNADO' s,
I i
I i
l1 1
l 1
Qtential. j '- ~jSubstantialj                                         l Assess l ~   lClassifyj- lMake Reg'dl' l Call Inj 2nt ':-             l---l Time                           _    .l---l Damage l---l Emergency--lNotifica- l--lHP And l.                             l ncques.l                   l Available-. .l'' lTo                               l- ~jPer Planj   ltions         l   lOther j
1 Qtential. j '- ~jSubstantialj l Assess l ~
: Most . j                 l(Days) Be- j ' l Equip-l                                                                   l Desired!
lClassifyj-lMake Reg'dl' l Call Inj l
tcern Are .l fore Action l                                           l ment l                                         l Person-j.               -l bilar.Tol- lMust be                                             l                                                     lnel       l 3s 0f' 'j; .lTaken To                                           l 7 site. j. .l Protect-                                         !
2nt ':-
Mr Withj                 -l Fuel                               j                                                                                 >
l---l Time
Blure Ofl-5 Onsitel rer                 l l
.l---l Damage l---l Emergency--lNotifica-l--lHP And l.
ncques.l l Available-..l''
lTo l-
~jPer Planj ltions l
lOther j
: Most. j l(Days) Be-j '
l Equip-l l Desired!
tcern Are
.l fore Action l l ment l
l Person-j.
bilar.Tol-lMust be l
lnel l
3s 0f' 'j;.lTaken To l
7 site.
j.
.l Protect-Mr Withj
-l Fuel j
l Blure Ofl-5 Onsitel rer l
l r
l r
[                                                                                             891I2002h0- 01 h
[
Tl APERTURE l1                                                                                                               CARD
891I2002h0- 01 h
.                                                                                                        Also Avaliable On~
Tl APERTURE l1 CARD Also Avaliable On~
Aperture Card L:____.___- _ _ _ _    .___:___.__u_______________.__.-____._______________           __ .__:.____n________________.____.____.____ _    _ _ o
Aperture Card L:____.___-
.___:___.__u_______________.__.-____._______________
.__:.____n________________.____.____._____ _ _ o


                        ~
~
l
l
                                                                                                                                          .j WIND AND TORNADO LOCATION TASK                       NO. OF PEOPLE l OF EVOLUT10" l COMMENTS C.R. l Plant     l                             l l         l                             l 1, Recognize event.         1   l         l Control Room l l         l                             l l         l                             l
.j WIND AND TORNADO LOCATION TASK NO. OF PEOPLE l OF EVOLUT10" l COMMENTS C.R. l Plant l
: 2. Operator survives.             l   1     l Cont. Bldg.                 l Operator in l         l                             l Control Room may l         l                             l not survive.
l l
l         l                             l                                   l l         l                             l
l l
: 3. Assess damage to         1     l   1     l Plant Tour & l equipment. .                   l         l Control Room l l         l                             l l         l                             l
1, Recognize event.
: 4. Classify as per           1     l         l Control Room l                                                   .
1 l
Emergency Plan.               l         l                             l                                   l t
l Control Room l l
l         l                             l l         l                             l                                  1
l l
: 5. Make required             1     l         l Control Room l~
l l
notifications.                 j         l                             l l         l                             l l         l                             l
l
: 6. Call in other             1     l         l Control Room l                                                   l personnel.                     l         l                             l
: 2. Operator survives.
* Refer to Loss of Offsite Power for Subsequent Actions                                                         ;
l 1
Minimum Staffing Requirement 1 Certified Fuel Handler Qualified 1 Auxiliary Operator Qualified 1
l Cont. Bldg.
l Operator in l
l l Control Room may l
l l not survive.
l l
l l
l l
l
: 3. Assess damage to 1
l 1
l Plant Tour & l equipment..
l l Control Room l l
l l
l l
l
: 4. Classify as per 1
l l Control Room l Emergency Plan.
l l
l l
t l
l l
l l
l 1
: 5. Make required 1
l l Control Room l~
notifications.
j l
l l
l l
l l
l
: 6. Call in other 1
l l Control Room l l
personnel.
l l
l
* Refer to Loss of Offsite Power for Subsequent Actions Minimum Staffing Requirement 1 Certified Fuel Handler Qualified 1 Auxiliary Operator Qualified 1
i Page 1 of 1
i Page 1 of 1


            ._            __.-                                                                                    l I,
l I,
a N
a N
  )                                                                                                             Sf l!
)
Sf l!
1 N
1 N
f
f
)
)
F
F
)'
)'t l:
t l:
i j'
i j'
f' .
f'.
l-1 i'
l-1 i'
  )
)
l Design Basis l   l Cont. Bldg.l lSome Damagaj       lIn Cont. Bldg.l   lFESW L l~                          l Earthquake- j---lAnd Stacks l---joccurs To     l---lSome Equipment l---l Break-l
l~
  !'                          l0ccurs       j   l Withstand j   l Diesel Bldg l     l Damage, FESW -j   lCausia
l Design Basis l l Cont. Bldg.l lSome Damagaj lIn Cont. Bldg.l lFESW L l Earthquake-j---lAnd Stacks l---joccurs To l---lSome Equipment l---l Break-l l0ccurs j
: 3.                                              l Event     l lTurb. Bldg.j       l Intact, Dis-   l l0f Lem lCribhouse l       l charge Line -l   '
l Withstand j l Diesel Bldg l l Damage, FESW -j lCausia l Event l
Point 1 l Intact Between!     Contrs lWell And Check!   lAre Ps l Valves         l lUncov@
lTurb. Bldg.j l Intact, Dis-l l0f Lem 3.
lCribhouse l
l charge Line
-l Point 1 l Intact Between!
Contrs lWell And Check!
lAre Ps l Valves l
lUncov@
l Fuel @
l Fuel @
lCoverm wm______.
lCoverm wm______.


2IC EVENT May l     l Consequences Similarl     l Loss Of Offsitel     lSubstant.l                 l Assess l sherel---lTo FESW System Pipe l---lAnd Onsite Power---l Time (Day)---l Damage l 1ss     l   l Break Event, But     l     lPossible Due Toj       lAvailablel                 lTo     l o     j   l Remote Fill Valve     l     l Switchyard,         l lFor       l               l Equip-j te     l   lMay Not Work. Local l       l Turbine Bldg. &l     l Response.l               l ment   l bds     j l(701') Rad Levels       l     l Diesel Bldg.       l l Refer To l 111y l     lHigh, But Time         l     l Damage.             l l Loss Of l But!   lAvailable For         l                             l0ffsite j
2IC EVENT May l l Consequences Similarl l Loss Of Offsitel lSubstant.l l Assess l sherel---lTo FESW System Pipe l---lAnd Onsite Power---l Time (Day)---l Damage l 1ss l
.ns    j   l Response             l                             l Power   !
l Break Event, But l
l                                                         l Event   l TI APERTURE CARD Ab4 AvaMahle on Aperture Card e7ll200200 -08
lPossible Due Toj lAvailablel lTo l
o j
l Remote Fill Valve l
l Switchyard, l
lFor l
l Equip-j te l
lMay Not Work. Local l l Turbine Bldg. &l l Response.l l ment l
bds j
l(701') Rad Levels l
l Diesel Bldg.
l l Refer To l 111y l lHigh, But Time l
l Damage.
l l Loss Of l
But!
lAvailable For l
l0ffsite j
j l Response l
l Power
.ns l
l Event l
TI APERTURE CARD Ab4 AvaMahle on Aperture Card e7ll200200 -08


SEISMIC EVENT LOCATION TASK                                                     NO. OF PEOPLE j OF EVOLUTION j     COMMENTS C.R. l Plant     l               l
SEISMIC EVENT LOCATION TASK NO. OF PEOPLE j OF EVOLUTION j COMMENTS C.R. l Plant l
                                                                                                          !        l              l
l l
: 1. Recognize event.                                     1   l         l Control Room l l         l               \
l
                                                                                                          !        l               l
: 1. Recognize event.
: 2. Assess damage to                                       1   l 1     l Plant Tour & l equipment.                                 j         j Control Room l l         !              !
1 l
                                                                                                          !        !              l
l Control Room l l
: 3. Add water to FESW                                       1   l         l Control Room l remote.                                     l         l               l l         !              !
l
l         l               l 3a. Add water to FESW                                         l   1     l 701' Level   j local.                                     l         l               l l         l               l l         l               l
\\
: 4. Response to affected                                     1   l         l Control Room l equipment.                                 l         l               l Refer to Loss of Offsite Power and/or FESW Line Break for Subsequent Actions Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified l                                                                                                                                           Page 1 of 1
l l
: 2. Assess damage to 1
l 1
l Plant Tour & l equipment.
j j Control Room l l
l
: 3. Add water to FESW 1
l l Control Room l remote.
l l
l l
l l
l 3a. Add water to FESW l
1 l 701' Level j
local.
l l
l l
l l
l l
l
: 4. Response to affected 1
l l Control Room l equipment.
l l
l Refer to Loss of Offsite Power and/or FESW Line Break for Subsequent Actions Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified l
Page 1 of 1


ne l
ne l
l Fire l         l Fire l     l Operator                                                     j       l Operator l               lFireResponsej l Breaks l-----l Alarm l---l Responds By                                                     l-----l Announces l---l Team Respondst lOut   j   j   l_     l   l Checking Panelj l l Fire &                                                           l         lTo Assess               ;
l Fire l
j                                                                                    l   l Location l               l Situation             :
l Fire l l Operator j
l                                   l                                                                                     l  lOn Pane         l l   l Fire     l     l0bserverl                                                     l
l Operator l
                                      - jobservedl---lContactsj-----
lFireResponsej l Breaks l-----l Alarm l---l Responds By l-----l Announces l---l Team Respondst lOut j
l Control l l Room                                                   l 1
j l_
i l
l l Checking Panelj l
l Fire &
l lTo Assess j
l l Location l l Situation l
l l
lOn Pane l
l l Fire l
l0bserverl l
- jobservedl---lContactsj-----
l Control l l Room l
1 i
l


(RE l
(RE l
l l
l l
l Operator!   l Fire Re-                   l     l Person Calls!         l Operator   l i--l Starts l---lsponse Teamj-----l Genoa Fire                     l-----l Monitors       l l1 HPSW j     l Fights Fire l--                 l Dept. For   l jj       lHPSW Sys. l                       l l Diesel l                                 l   l Assistance l ll       l Rad Monitorj                       j I                   II                                           I
l Operator!
_________________ l                                             l l     lIf Fire In       l                 l
l Fire Re-l l Person Calls!
                                                                          - l Control Room,     j --                 . . , .
l Operator l
l Operator         l l Monitors HPSW j l Diesels Locally l (continued on next page)                         -
i--l Starts l---lsponse Teamj-----l Genoa Fire l-----l Monitors l
87/1260200 - D9 TI APERTURE CARD Also Avagable On Aperture Card
l1 HPSW j l Fights Fire l--
l Dept. For l jj lHPSW Sys.
l l
l Diesel l
l l Assistance l ll l Rad Monitorj j
I II I
_________________ l l
l lIf Fire In l
l
- l Control Room, j --
l Operator l
l Monitors HPSW j l Diesels Locally l (continued on next page) 87/1260200 - D9 TI APERTURE CARD Also Avagable On Aperture Card


F (C
F (C
                                                                                                                                                  - l Fire Inl---jFire It j   l Turbine l l lContro l   l Bldg. ll lRoo l                 l l                 1 l
- l Fire Inl---jFire It j
l---l Fire Inl---l Lose l     l Diesel l         lEss.
l Turbine l l lContro l
l     lBidg. l           l& 1B l                         l Int.
l Bldg.
l                         l125V I l                         lD.B.
ll lRoo l
l l
1 l
l---l Fire Inl---l Lose l
l Diesel l lEss.
l lBidg.
l l& 1B l
l Int.
l l125V I l
lD.B.
l l
l l
l
l
                                                                                        - lMake Requiredj -                                     l l                         l Notifications! l l Account   l   l l Evaluate l l                                           l--lFor All   l---l---l Fire In             l---lL
- lMake Requiredj -
                                                    ----lIf Emer- l                                                             lPersonnell   l     l Cont. Bldg.j           lF lgency Perl                                                                 l                               l l Plan     l                                                               l l                           -jSpr j                         l l& P l     l Fire Inl         l lW/0 l---l Crib- l---l l l     l house   l       l l                         l lHPS l                           -l Dam l
l l
l Notifications!
l l Account l
l l Evaluate l l l--lFor All l---l---l Fire In l---lL
----lIf Emer-l lPersonnell l
l Cont. Bldg.j lF lgency Perl l
l l Plan l
l l
-jSpr j
l l& P l
l Fire Inl l lW/0 l---l Crib-l---l l
l l house l
l l
l lHPS l
-l Dam l
l i
l i
l l
l l
i l
i l
l     l Fire In Otherj             l
l l Fire In Otherj l
                                                                                                                                                  - l Building Or l---l l0utside               ll l
- l Building Or l---l l0utside l l l
ll
ll
                                                                                                                                                                                  -l l
-l l
l l
l l


i
i
                                                                                                                                                                                                  ;i n-
;i n-
>lOpsrator j---l Potential Plant l---l Considerable l---l Concentration l l Monitors:l !~l Consequences                           l' jTime Avail- l                                                     lOn Extinguish-l-lHPSW Sys.l l'l Bounded By Loss l                                   lable (Days) l                                             ling Fire           l lFrom-               ' j-l     l0f Offsite     .       l           lTo Correct. l
>lOpsrator j---l Potential Plant l---l Considerable l---l Concentration l l Monitors:l !~l Consequences l'
-lCribhousej l l Power' Accident j .jEquip. Damagej sl---'l Potential l---l Consider-.l---lConcentra l---l Operator l---l Operator l l-       l Plant Con-               lable Time l-         l tion on                                               l     l Starts l         l Observes l l       lcequencesl               lAvailablel           l Extinguish-                                                 l1A FESW j         lFESW         l bl       l Bounded By               l(Days) Tol-           ling Fire l                                                   l Pump If j       l Locally l
jTime Avail-l lOn Extinguish-l-lHPSW Sys.l l'l Bounded By Loss l lable (Days) l ling Fire l
'l       l Loss Of l-               l Correct -l                                                                         lNot         j     lPeriodi- l
lFrom-
,j       l0ffsite             l-   lEquipmentj.                                                                         jRunning l         lcally         l l Power.             l     l Damage         l                                                                                       lSince FESW                                           .
' j-l l0f Offsite.
jAccident'j.                                                                                                                       l Level Inst.
l lTo Correct. l
l Analysis j.                                                                                                                       lW/0 Power l l Refer Toj         l Considerable                                                   l Concentration l
-lCribhousej l l Power' Accident j
,l---l Potential l Damage Of-l---l     l- Loss Of           l---l Time Avail- l---jon Extinguish-j j       l Concern Isj                 jFESW         l     lable (Days) l                                                   ling Fire           l                                             o gj         :-l Loss Of             l     l Cooling l         lTo Restore                                               l                                                                       H lFESW Pumpsj               'l Accident l         lFESW Cooling l l Hook Up Toj---lConcentra-l Drs . Work , l ..                                                                                                     lG-3 For       l     l tion'On       j                                       i st.Firo           l-                                                                                                 l Fire Sup- l         l Extinguish-cificant l                                                                                                           lpression j           jing Fire       l nt Damaanj               -lLPSW Pump (s)           l-----------------l Water Or                                                       j                                                             i j lStill Operatej                                     j                                       lUse ESWSS l                                                                   )
.jEquip. Damagej sl---'l Potential l---l Consider-.l---lConcentra l---l Operator l---l Operator l l-l Plant Con-lable Time l-l tion on l
Scolsl-----l                                                                 !                                      l Pump         l                 Tl                                           i j             -lLPSW Pumps l---l Consequence l l Damaged           l     lTo Plant                                                   l                             APERTURE lSame As                                                   !                                  CARI)                                         ,
l Starts l
l Loss of FESWl                                                                                                                               l l Cooling /                                                 l l Considerable!                                                                         Also AvaMahle on l Time (Days) l                                                                           '%perttare Card lAvailable Toj l Restore                                                   j Plant             l       l Concentration On l 87/120DMb-m                                                            l nequencesl---l Extinguishing Firej                                                                                                                                                                   '
l Observes l l
9 in           l-       l Loss Ofj         l Considerable l                                                 lImmediate         l     lGo To Loss!
lcequencesl lAvailablel l Extinguish-l1A FESW j lFESW l
schyard l---l0ffsitej---jTime Avail-                                                 l---l Concentration l---l0f Offsitej Dgas           j         l Power l           lable (Days) l                                                   lOn Extinguish-           l Power       l                                           1 grve           l                             lTo Respond                             l                         ling Fire           l     l Accident     j psformerl l
bl l Bounded By l(Days) Tol-ling Fire l
i
l Pump If j l Locally l
_ . _ . _ . _ _ _ _ . _ _ _ _ _      l
'l l Loss Of l-l Correct -l lNot j
lPeriodi-l
,j l0ffsite l-lEquipmentj.
jRunning l lcally l
l Power.
l l Damage l
lSince FESW jAccident'j.
l Level Inst.
l Analysis j.
lW/0 Power l
,l---l Potential l-l Refer Toj l Considerable l Concentration l l Damage Of-l---l Loss Of l---l Time Avail-l---jon Extinguish-j j
l Concern Isj jFESW l
lable (Days) l ling Fire l
o gj
:-l Loss Of l
l Cooling l lTo Restore l
H lFESW Pumpsj
'l Accident l lFESW Cooling l l Hook Up Toj---lConcentra-l Drs. Work, l..
lG-3 For l
l tion'On j
i st.Firo l-l Fire Sup-l l Extinguish-cificant l lpression j
jing Fire l
nt Damaanj
-lLPSW Pump (s) l-----------------l Water Or j
i j lStill Operatej j
lUse ESWSS l
)
Scolsl-----l l Pump l
Tl i
j
-lLPSW Pumps l---l Consequence l l Damaged l
lTo Plant l
APERTURE lSame As CARI) l Loss of FESWl l
l Cooling /
l l Considerable!
Also AvaMahle on l Time (Days) l
'%perttare Card lAvailable Toj l Restore j
87/120DMb-m Plant l
l Concentration On l l
nequencesl---l Extinguishing Firej 9 in l-l Loss Ofj l Considerable l lImmediate l
lGo To Loss!
schyard l---l0ffsitej---jTime Avail-l---l Concentration l---l0f Offsitej Dgas j
l Power l lable (Days) l lOn Extinguish-l Power l
1 grve l
lTo Respond l
ling Fire l
l Accident j
psformerl l
i l


FIRE NO. OF PEOPLE         LOCATION TASK                         C.R. ! PIANT   ! 0F EVOLUTION ! COMMENTS l         l                 l
FIRE NO. OF PEOPLE LOCATION TASK C.R.
: 1. Fire alarm & acknow-       1   l         l Control Room l ledgement.                     l         l                 l l         l                 l l         l                 l
! PIANT
: 2. Fire observed and               l   1   l Plant           !
! 0F EVOLUTION ! COMMENTS l
Control Room contacted.       l         j                 j
l l
                                              !        l                 l l         l                l
: 1. Fire alarm & acknow-1 l
: 3. Operator alerts fire       1   l         l               -l brigade.                       l         l                 l 1         l                 l l         l                 l
l Control Room l ledgement.
: 4. Fire brigade responds. 1   l         l Control Room j j   1   l Fire Location l Brigade leader l         l               l l         l                 l
l l
: 5. Operator starts > 1 _
l l
1    l         l Control Room l HPSW pump or ensures           l         l                 l auto start.                     l         l                 l l         l                 l l         l                 l
l l
: 6. Fire fighting,                 j   3     j Fire Locationi 1-Operations l         l                 l 2-Other or Ops.
l l
1     l         l Control Room l Calls additional l       l                 l help from local   ;
l
l         l                l Fire. Dept.
: 2. Fire observed and l
l         l                 l
1 l Plant Control Room contacted.
: 7. Operator monitors Rad     1     l         l Control Room l levels, HPSW pressure,         j   1     l Fire Location! Brigade leader.
l j
                & adjusts vent flow as         l         l                 l directed.                       l         l                 l                   l l         l                 l l         l                 l                   '
j l
: 8. Fire in Control Room-           l   1     l Cribhouse       l operator monitors HPSW         l         l                 l pressure in Cribhouse.         j         l                 l                   3 I       I                 l i       !                l                   l
l l
: 9. Evaluate as per           1     l         l Control Room l Shift Supervisor     i Emergency Plan.                 l         l                 l i
l l
Page 1 of 2   l 1
: 3. Operator alerts fire 1
l E____----------                                                                                   1
l l
-l brigade.
l l
l 1
l l
l l
l
: 4. Fire brigade responds.
1 l
l Control Room j j
1 l Fire Location l Brigade leader l
l l
l l
l
: 5. Operator starts > 1 1
l l Control Room l HPSW pump or ensures l
l l
auto start.
l l
l l
l l
l l
l
: 6. Fire fighting, j
3 j Fire Locationi 1-Operations l
l l 2-Other or Ops.
1 l
l Control Room l Calls additional l
l l help from local l
l l Fire. Dept.
l l
l
: 7. Operator monitors Rad 1
l l Control Room l levels, HPSW pressure, j
1 l Fire Location! Brigade leader.
& adjusts vent flow as l
l l
directed.
l l
l l
l l
l l
l l
: 8. Fire in Control Room-l 1
l Cribhouse l
operator monitors HPSW l
l l
pressure in Cribhouse.
j l
l 3
I I
l i
l l
: 9. Evaluate as per 1
l l Control Room l Shift Supervisor i'
Emergency Plan.
l l
l i
Page 1 of 2 l
1 l
E____----------
1


:.                                                                                                      f l
f l
FIRE                                                     i l
i FIRE l
                                        .NO. OF PEOPLE       LOCATION                                       '
.NO. OF PEOPLE LOCATION
          . TASK                         C.R. ! PLANT   l OF EVOLUTION l COMMENTS
. TASK C.R.
                                                !        !                l 10.'Make notifications.       1   l         l Control Room l I         I'               I l         l               l                                 ,
! PLANT l OF EVOLUTION l COMMENTS l
: 11. Account for personnel. 1   l         l Control Room l l   1     l Fire Location!
10.'Make notifications.
I         I               I l         l               l
1 l
: 12. Fire in Cribhouse-             l   2     l River Bank orl                                   l deploy ESWSS Pumps or'         l         l SW of Turbine l cross-connect with             l         l Building       l G-3.                           l         l               l                                 l NOTE:' Fire in other locations covered by other scenarios.                                       i Minimum Staffing Requirements l
l Control Room l I
4 People of which                                             1 1 - Certified Fuel Handler Qualified, Fire Brigade Leader Qualified 1 Control Room Operator Qualified, Fire Brigade Leader Qualified 1
I' I
l l
l
: 11. Account for personnel.
1 l
l Control Room l l
1 l Fire Location!
I I
I l
l l
: 12. Fire in Cribhouse-l 2
l River Bank orl l
deploy ESWSS Pumps or' l
l SW of Turbine l cross-connect with l
l Building l
G-3.
l l
l l
NOTE:' Fire in other locations covered by other scenarios.
i Minimum Staffing Requirements l
1 4 People of which 1 - Certified Fuel Handler Qualified, Fire Brigade Leader Qualified 1 Control Room Operator Qualified, Fire Brigade Leader Qualified 1
i i
i i
j Page 2 of 2 i
j Page 2 of 2 i
i f
i f
_ _ _ . ____ _ __ a
_ _ _. ____ _ __ a


r H:
r H:
[.         y a.
[.
y a.
SPENT FUEL E o
SPENT FUEL E o
lDuring Fuel l-                 l Fuel         l     l Cladding l         l Cladding l                     l Area.           j' l@
lDuring Fuel l-l Fuel l
l Handling'Inl'--l Assembly l---lOn All-                         l---l Gap Gas 'l---jRadiationl---lC u                        jFESW, Fuel'l                   l Hits         l     l Pins In ~ l       l Activity. l                   l Monitor- j' lQ l Assembly' l                   lAnother     j. lBoth As- l .l Starts                         'l     l Alarms .'l           j@
l Cladding l
1 Drops Off         j           l Assembly   l-     lsemblies   j       jExiting                   l     l   Locally       &l- -l6
l Cladding l l Area.
                        .lHolst             l
j' l@
                                                          ~
l Handling'Inl'--l Assembly l---lOn All-l---l Gap Gas
lIs Damagedj         l Cladding-l                     lIn Control. jy j& Bubbling l                   l Room'           l lUp Throughl l Pool Waterj l Prompt Actions                     l       lLong Term
'l---jRadiationl---lC jFESW, Fuel'l l Hits l
                                    - l Cont. Bldg.           l------- jRelease Is l---lSame As In Other j ---l0fl Activity                        What TG
l Pins In ~ l l Activity. l l Monitor-j' lQ u
(
l Assembly' l
                                  ? 'jIsolates-               j'     l     l Limited   l       l Chain But Offsite.
lAnother j.
l                                 l                           l Dose Less                           l L 'll or more l                   l Operator (s)l       l Cont. Bldg.l
lBoth As-l
                                    - l Cont. Bldg.l---jAttempts tol---lIs Isolated l l Iso. Valves l           'l Isolate . ll                                       '~
.l Starts
lMonitorj lDo Not~               j     l Cont. Bldg.l-l .l Cont. Bldg.                                                   lClast lClose                l lCannot Be               .
'l l Alarms
                                                                                                                            ---l Stack l---lEmerg
.'l j@
_l Isolated               j       l Release l           lPer0 l Stack l             l Max. Postulated Offsite Dose *l
1 Drops Off j
                                    - l Release l---l0.05 mrem Whole Body                                       l-----------------------<
l Assembly l-lsemblies j
l                           l4.2 mrem       Skin                             l
jExiting l
~
l Locally &l- -l6
.lHolst l
~
lIs Damagedj l Cladding-l lIn Control.
jy j& Bubbling l l Room' l
lUp Throughl l Pool Waterj l Prompt Actions l
lLong Term
- l Cont. Bldg. l------- jRelease Is l---lSame As In Other j ---l0f What TG
? 'jIsolates-j' l
l Limited l
l Chain But Offsite.
l Activity (
l l
l Dose Less l
L 'll or more l
l Operator (s)l l Cont. Bldg.l
- l Cont. Bldg.l---jAttempts tol---lIs Isolated l l Iso. Valves l
'l Isolate. ll lDo Not~
j l Cont. Bldg.l-l.l Cont. Bldg.
lMonitorj lClast
'~
lCannot Be
. ---l Stack l---lEmerg lClose l
_l Isolated j
l Release l lPer0 l Stack l
l Max. Postulated Offsite Dose *l
- l Release l---l0.05 mrem Whole Body l-----------------------<
l l4.2 mrem Skin l
l
l
                          .....j j     l Ground Release                 l     l Max. Postulated Offsite Dose *j                               l Monitor
~
                                    - l(Leak To other                     l---l2.25 mrem   Whole           Body                         l---j0ffsite-
.....j j
    <                                  lThan Turbine Bldg)j.                   j187 mrem Skin                                             j     l Rad Leve:
l Ground Release l
l Max. Postulated Offsite Dose *j l Monitor
- l(Leak To other l---l2.25 mrem Whole Body l---j0ffsite-lThan Turbine Bldg)j.
j187 mrem Skin j
l Rad Leve:
* As of October 1987
* As of October 1987
  -~
-~


L L .
L L
s L
s L
SLING ACCIDENT ~
SLING ACCIDENT ~
pber ofj.               l Fuel =         l Cont. Bldg.l           jOperator j                                     l Operator.l----------
pber ofj.
D1.'       -l     a-l Handling; ---l   Gas   Activity---jchecks-                                       l---l   Evacuates   l
l Fuel =
$dling l               l Crew     .      l Monitor-       l       l           Activity                   &       l Cont.     l bw Op:ns . lEvacuatej                     l Alarms In l           l         Radiation                     l       l Building' l tidg2- ~ j'                             .jControl Rm'l           l Monitors j msker       j                                                                                                                               j l
l Cont. Bldg.l jOperator j l Operator.l----------
btorminstionl Do With'                 l a Building:               !
D1.'
t-lfy                 lMake Notifi- l           l Call In l   lMake Pre-                                           l     l Monitor   j sney.; e---l cations To               l---lHP Tech.l---l11minary Dosej---lOnsite                                                   l------
-l a-l Handling; ---l Gas Activity---jchecks-l---l Evacuates l
> Plan l; -   .l State, County l                           l Assessment                                         l     l Rad Levelsj lNRC, Plant       l
$dling l l Crew l Monitor-l l Activity &
              -jSupt. And l
l Cont.
l Reactor Eng. l                                                                                                           ,
l bw Op:ns
1 l
. lEvacuatej l Alarms In l l Radiation l l Building' l tidg2- ~ j'
.jControl Rm'l l Monitors j msker j
j l
btorminstionl Do With' l
a Building:
t-lfy lMake Notifi-l l Call In l lMake Pre-l l Monitor j
sney.; e---l cations To l---lHP Tech.l---l11minary Dosej---lOnsite l------
> Plan l; -
.l State, County l l Assessment l
l Rad Levelsj lNRC, Plant l
-jSupt. And l
l Reactor Eng. l 1
l l
l n.
l
l
: n.                                                                                                                                           l
.l
    '!                                                                                                                                        l
-l Conduct Dosej-l Develop l
    .l            -l Conduct Dosej-         l Develop       l                                                                               l 3;l-----l Assessment                 l---jRecovery Plan l'                                                                                   l y;                                                                                                           87//Zbogoo-II 2l --                                                                                                                     TI APERTURE CARD                 i Also Avalfable On
l 3;l-----l Assessment l---jRecovery Plan l' l
                                                                                                                " Aperture Card
y; 87//Zbogoo-II 2l --
TI APERTURE CARD i
Also Avalfable On
" Aperture Card


7,
7,
{3 i
{3 i
          ,                                                                                                                                                    4 SPENT FUEL HANDLING ACCIDENT NO. OF PEOPLE                   LOCATION TASK                                                   C.R. l PLANT     ! 0F EVOLUTION 1 COMMENTS l           1       -
4 SPENT FUEL HANDLING ACCIDENT NO. OF PEOPLE LOCATION TASK C.R.
                                                                                                                                  . l                         '
l PLANT
: 1. CFH opens bridge                                       l     1     l 701' Level       l breaker.                                         l             l                 l J
! 0F EVOLUTION 1 COMMENTS l
l             l                l l
1 l
l             l                                         ?
: 1. CFH opens bridge l
: 2. Operator checks C.B.                               -1   l             l                 l activity and radiation.                         l             l Control Room l l             I                 l                       '
1 l 701' Level l
I           l                 l
breaker.
: 3. Operator evacuates C.B.                             1   l           l Control Room j I             l                 l l             l                 l
l l
: 4. Operator tries to                                       j             l                 j isolate C.B. remotely.                     1   l             l Control Room l I             I                 I l           l                 l
l l
: 5. Operator tries to                                       l     1     l T.B. Tunnel     l                     {"
l l
isolate C.B. locally.                           l             l                 l
J l
                                                                                                          !            l                l t             l                 l                     ,
l l
: 6. Monitor stack releases.                             1*l               l                 l l             l                 l
?
                                                                                                          ;            l                 l
: 2. Operator checks C.B.
: 7. Classify as per                                     1     l           l Control Room j Shift Supervisor Emergency Plan.                                   l           l                 l l             l                 l l             l                 l
-1 l
: 8. Make notifications as                             1     l             l Control Room l per amergency Plan.                               l 4
l l
l i
activity and radiation.
l i
l l Control Room l l
: 9. Monitor onsite dose                                       l   1       lOnsite levels.                                           l             l                 l l             l                 !
I l
                                                                                                            !            !                l
I l
: 10. Preliminary assess dose.                         1     l             l Control Room j CFH Qualified
l
: 3. Operator evacuates C.B.
1 l
l Control Room j I
l l
l l
l
: 4. Operator tries to j
l j
isolate C.B. remotely.
1 l
l Control Room l I
I I
l l
l
: 5. Operator tries to l
1 l T.B. Tunnel l
{
isolate C.B. locally.
l l
l l
l t
l l
: 6. Monitor stack releases.
1*l l
l l
l l
l l
: 7. Classify as per 1
l l Control Room j Shift Supervisor Emergency Plan.
l l
l l
l l
l l
l
: 8. Make notifications as 1
l l Control Room l per amergency Plan.
l l
l 4
i i
lOnsite
: 9. Monitor onsite dose l
1 levels.
l l
l l
l l
: 10. Preliminary assess dose.
1 l
l Control Room j CFH Qualified
* CFH and/or Control Room Qualified Operator i
* CFH and/or Control Room Qualified Operator i
Minimum Staffing Requirements 2 People                                           j
Minimum Staffing Requirements 2 People j
                                                                                                                                                                ?
?
1 - Certified Fuel Handler Qualified                                       i 1 - Control Room Operator Qualified                                       l Page 1 of 1     !
1 - Certified Fuel Handler Qualified i
l 1
1 - Control Room Operator Qualified l
Page 1 of 1 l
1 l
l
l
_ _ - - - - _ _ _ _ _ - _ - - - - - - - - - - _ - - - - _                - - - _ - -  -  - - - -                                                          .- l


t
t
  ! ennus ' cttw
! ennus ' cttw
:O t,
:O t,
11 SHIPPING CASK OR L
11 SHIPPING CASK OR L
lDuring Fuell           l Heavy l     l Cladding Ofl     l Cladding Gap l           l Area             l       ll l Shipping,       l   l Load j       lAll Fuel l       l Gas Activity l           l Radiation l               l; l Shipping         l---lDropsj---l Assemblies l---jStarts Exiting--l Monitors l --- j(
lDuring Fuell l Heavy l l Cladding Ofl l Cladding Gap l l Area l
l Cask Falls j         lInto l       lIn FESW     l     l Cladding And!           l Alarm           j       ll jFrom Crane l           lFESW j       l Ruptures   l     l Bubbling Up l           l Locally & l               jj lInto FESW l                                             lThrough Pool!             lIn Control!
ll l Shipping, l
l Room             l l .'
l Load j lAll Fuel l
l Gas Activity l l Radiation l l;
l Shipping l---lDropsj---l Assemblies l---jStarts Exiting--l Monitors l --- j(
l Cask Falls j lInto l lIn FESW l
l Cladding And!
l Alarm j
ll jFrom Crane l lFESW j l Ruptures l
l Bubbling Up l l Locally & l jj lInto FESW l lThrough Pool!
lIn Control!
l Room l
l.'
l i
l i
l                                                                                                             lReleasej             ll L                     - l Cont. Bldg.         l--------------------------------------------jIs                             l --- j f
l lReleasej ll L
: l.                 l     l Isolates On       l                                                     l       l Limited l           l1 l     lHigh Activityj                                                           j                               lj l                                                                               l                               l1 l                                                       _l Cont. Bldg.l---                                       h l                                                     l   lIs Isolated!                                         l(
- l Cont. Bldg.
l     l1 Or More Cont, j         l Operator (s)l. l                                                         lj
l--------------------------------------------jIs l --- j f l.
                      - l Isolation Valves l--jAttempts Toj---!
l l Isolates On l
l                         lDo Not Close         j   l Isolate       l   l_ jCont. Bldg.j         l Monitor l               lCls l Cont. Bldg.l         lCannot Be l---l Stack                 l---l Ems l Isolated   l       l Releases l             l As 2 lPer
l l Limited l l1 l
                          - l Stack     l----------l Max Postulated Offsite Dose *j-l     lReleasej                 l4.2 mrem Whole Body               jj                                   ___
lHigh Activityj j
l                              l350 mrem Skin                     ll             lMonitorj           lCor
lj l
                  ---l                                                                       l---j0ffsitel---lDo; j     l Ground Releasej         l Max Postulated Offsite Dose *l     l           l Rad     j         l&g
l l1 l
                          - l Leak To Other l---jl86 mrem Whole Body                       l-             l Levels l lThan Turbine l           l15.6 Rem Skin                     l l Building         l
_l Cont. Bldg.l---
h l
l lIs Isolated!
l(
l l1 Or More Cont, j l Operator (s)l.
l lj
- l Isolation Valves l--jAttempts Toj---!
l lDo Not Close j
l Isolate l
l_ jCont. Bldg.j l Monitor l lCls l Cont. Bldg.l lCannot Be l---l Stack l---l Ems l Isolated l
l Releases l l As 2 lPer
- l Stack l----------l Max Postulated Offsite Dose *j-l lReleasej l4.2 mrem Whole Body jj l
l350 mrem Skin ll lMonitorj lCor
---l l---j0ffsitel---lDo; j
l Ground Releasej l Max Postulated Offsite Dose *l l l Rad j
l&g
- l Leak To Other l---jl86 mrem Whole Body l-l Levels l lThan Turbine l
l15.6 Rem Skin l
l Building l
* As of October 1987
* As of October 1987
              ~a
~a


f 3                                                                                                                                                                                                       -.
f 3
    -Qj
-Qj
                                                                                                                                                                                                                'l j
'l LOAD DROP INTO.FESW j
LOAD DROP INTO.FESW I
I Ej; l Cont. Bldg.lL
Ej;                     l Cont. Bldg.lL 'l Operator.j                                                               l Operator.l
'l Operator.j l Operator.l
    ~- l '.
~- l '. 'l Gas Activity-l Checks.. l l Evacuates l Ll---l Monitor ~l---l Cont.
                      'l Gas Activity- l Checks. . l                                                                 l Evacuates l                                                                                 ;
l------------------
I~
L l --- l Monitor'..
L l --- l Monitor'. . Ll---l Monitor ~l---l Cont.                                                                                                                       l------------------
j.
      .l. 'l Alarms:In j. lFor Ac . l                                                                               l Building j ill                   - l Control' -         l     'jtivity & l ll Room'               j'-     l Radiation)-
lFor Ac. l l Building j I~
.l.
'l Alarms:In ill t
- l Control' -
l
'jtivity & l ll Room' j'-
l Radiation)-
1
1
                                                                                                                                                                                                                .)
.)
Actions l                         .lLong Term             l OIn Other---l Determination l                                                                                                                                                                                       1
Actions l
) But- j j'                           jof What To Do!                                                                                                                                                             i 3 Do Notl                             jWith7Activityj p Ba:Taken. -lIn Building j skly And j .                                                                                                                                                                                                     ;
.lLong Term l
fDoses'-l                                                                                                                                                                                                         i se -                     j.                                                                                                                                                                                     1 l-       'lMake Notifi-l                         l Call In                             l                     lMake Pre-j                                                     -l Monitor l.
OIn Other---l Determination l 1
[---l cations To l---lHP Tech (s)l---lliminary l---lOnsite l-----------                                                                                                                                           l
But-j j' jof What To Do!
[.       'l County,'NRC,l                       j& Anyone                             j                     l Dose                                                 l Rad   j                     )
i
[       'l State, Plant!                         lElse                                 l                     l Assessment l Levels !
)
        -jSuperinendent                         l Wanted                               l
3 Do Notl jWith7Activityj p Ba:Taken. -lIn Building j
        ;jReactor Eng.j-                                                                                                                                                                                           !
skly And j.
l i
fDoses'-l i
o.
se -
ji             l Develop-l                                                                                                                                                                                    <
j.
Recovery l
1 l-
@[---{i               Plan            ,
'lMake Notifi-l l Call In l
[ ((M M M                 /g T1                   !
lMake Pre-j
APERTURE                   j CARD Aha Available On Aperture Card               i
-l Monitor l.
[---l cations To l---lHP Tech (s)l---lliminary l---lOnsite l-----------
l
[.
'l County,'NRC,l j& Anyone j
l Dose l
Rad j
)
[
'l State, Plant!
lElse l
l Assessment
- Levels !
l
-jSuperinendent l Wanted l
;jReactor Eng.j-l i
o.ji l Develop-l
@[---{i
[ ((M M M
/g Recovery l Plan T1 APERTURE j
CARD Aha Available On Aperture Card i


l N'
l N'
                                                                                                                                                                                            .j
.j
                              ' SHIPPING CASK OR HEAVY LOAD DROP INTO FESW                                                                                                                   i LOCATION TASK                         NO. OF PEOPLE l OF EVOLUTION l COMMENTS                                                                                                             '
' SHIPPING CASK OR HEAVY LOAD DROP INTO FESW i
C.R. j Plant   l                                           l
LOCATION TASK NO. OF PEOPLE l OF EVOLUTION l COMMENTS C.R.
                                                  !        l                                            l
j Plant l
: 10. Dose assessment.           1   l         l Control Room l CFH Qualified I         !                                            l i         j                                           i
l l
: 11. Monitor Rad levels.         1   l         l Control Room l Note: 10 & 11 done l         l                                           l at same time and                                                                   i j         j                                           l continue for dur-l-       l                                           l ation of release.                                                                 i Minimum Staffing Requirement I
l
3 People of which                                                                                                                               !a l
: 10. Dose assessment.
1 - Certified Fuel Handler with Dose Assessment Training                                                                                                               i 1 - Control Room Qualified Operator                                                                                                                         l 1 - Auxiliary Operator Qualified l
1 l
                                                                                                                                                                                                  \
l Control Room l CFH Qualified I
l i
j i
: 11. Monitor Rad levels.
1 l
l Control Room l Note: 10 & 11 done l
l l at same time and i
j j
l continue for dur-l-
l l ation of release.
i Minimum Staffing Requirement I
3 People of which al 1 - Certified Fuel Handler with Dose Assessment Training i
1 - Control Room Qualified Operator l
1 - Auxiliary Operator Qualified l
\\
I Page 2 of 2 o
I Page 2 of 2 o


r.
r.
1:,
1:,
1 J                                                                                                                                                     1 1
1 J
1 1
1 SHIPPING CASK OR HEAVY LOAD DROP INTO FESW l
1 SHIPPING CASK OR HEAVY LOAD DROP INTO FESW l
1 i 4 LOCATION NO. OF PEOPLE j OF EVOLUTION l COMMENTS                                                                       j TASK
1 i
                                      .C.R. l Plant j'             l
4 LOCATION TASK NO. OF PEOPLE j OF EVOLUTION l COMMENTS j
                                              !        l              l
.C.R. l Plant j'
: 1. Cask or heavy load           1   l       l Control Room l At'least 1 drop into.FESW.                   l   2   l 701' Level l CFH's.
l l
I       l               l l       l               l
l
: 2. ARM's alarm locally           1   l       l Control Room j
: 1. Cask or heavy load 1
            & in Control Room.               l       l               l                                                                               l i
l l Control Room l At'least 1 drop into.FESW.
l       l               I
l 2
                                              !        l               !                                                                              l '
l 701' Level l CFH's.
: 3. Containment Building         1   l       l Control Room j evacuation.                     l       l               l                                                                               ,
I l
l       !
l l
                                              !        l               !                                                                              l
l l
: 4. Operator. monitors Rad       1   l-       l Control Room j monitors in Control               l       l               l
: 2. ARM's alarm locally 1
          . Room.                           l       l               l l       l               l l       l                l l
l l Control Room j
: 5. Recognize Containment         1   l       l Control Room l Building not isolated             l   1   l T.B. Tunnel j l                                                                              l and isolate remotely             l       l and/or locally.                   !      l               l                                                                             .l l       l               l l       l               l
& in Control Room.
: 6. Monitor' stack releases.     1     l       l Control Room l l       l               l
l l
                                              \       \               \
l l
: 7. Classify as per               1     i       l Control Room l Shift Supv.(Cert.
l l
Emergency Plan.                   l       l               l Fuel Handler)
I i
: 8. Make notifications as         1     l       l Control Room l Emergency Plan.                   l       l               l I       I               I I       I               I
l l
: 9. Call in additional             1     l       l Control Room l personnel.                         l       l               l l       l               l l       l               l Page 1 of 2 l
: 3. Containment Building 1
l l Control Room j evacuation.
l l
l l
l l
: 4. Operator. monitors Rad 1
l-l Control Room j monitors in Control l
l l
. Room.
l l
l l
l l
l l
l
: 5. Recognize Containment 1
l l Control Room l l
Building not isolated l
1 l T.B. Tunnel j
and isolate remotely l
l l
l and/or locally.
l l
.l l
l l
l l
l
: 6. Monitor' stack releases.
1 l
l Control Room l l
l l
\\
\\
\\
: 7. Classify as per 1
i l Control Room l Shift Supv.(Cert.
Emergency Plan.
l l
l Fuel Handler)
: 8. Make notifications as 1
l l Control Room l Emergency Plan.
l l
l I
I I
I I
I
: 9. Call in additional 1
l l Control Room l personnel.
l l
l l
l l
l l
l Page 1 of 2 l
l
l
                                                              --          - - - - - . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ .}}
- - - - -. _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _.}}

Latest revision as of 00:21, 3 December 2024

Proposed Tech Specs,Revising Administrative Section Due to Permanent Shutdown of Plant on 870430
ML20236Q644
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/12/1987
From:
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML20236Q633 List:
References
NUDOCS 8711200200
Download: ML20236Q644 (42)


Text

{{#Wiki_filter:_ _ _ _ _ _. _ _ _ _ _ _ - O $8 ATTACIIMENT 1 i PROPOSED TECHNICAL SPECIFICATION PAGES 8711200200 871112 PDR ADOCK 05000409 P PDR PCl-39

6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Plant Superintendent shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence. 6.1.2 The Shift Supervisor (or during his absence from the Control Room, a designated individual) shall be responsible for Control Room command function. A management directive to this effect, signed by the highest level of corporate mar.cgement shall be reissued to all station personnel on an annual basis. 6.2 ORGANIZATION OFFSITE 6.2.1 The offsite organization for unit management and technical support shall be as shown on Figure 6.2 1-1. UNIT STAFF 6.2.2 The unit organization shall be as shown on Figure 6.2.2-1 and a. Each on duty shift shall be composed of at least one Shift Supervisor with a Senior Reactor Operator License and one Operator, who is qualified as a Control Room watchstander.* b. A qualified Control Room Operator or Shift Supervisor shall be within visual and/or audio distance of the Control Room annunciators. c. All spent fuel handling shall be directly supervised by either a Licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling. d. At least one additional Operator and one Health Physics Technician shall be onsite when spent fuel or a spent fuel shipping cask is being handled or when non-routine evolutions are being conducted in the Fuel Element Storage Well.

  • Shift crew composition may be one less than the minimum requirements for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

This provision does not permit any shift crew position to be unfilled upon shift change due to an oncoming shift crew member being late or absent. 6-0 l Reference 5 also affects this page. PCl-39 E_____________________________________.___

_ _. -. =. _ _ -.. - - - -._ e d i THIS PAGE INTENTIONALLY LEFT BLANK. 6-4 Reference 5 also affects this page. PC1-39

4 l ATTACHMENT 2 STAFFING EVALUATION I i l l i 1 1 1 i D

MINIMUM STAFFING REQUIREMENT

SUMMARY

Potential Accident Minimum Staffing CFH/SRO* Control Room Aux Operator Other Qualified Qualified Qualified Loss of Offsite Power 1 1 Loss of FESW Cooling 1 Uncontrolled Liquid Waste 1 1 Discharge FESW Pipe Break 1 1 Wind and Tornado 1 1 Seismic Event 1 1 Fire 1 1 2 Spent Fuel Handling 1 1 Accident Shipping Cask or Heavy 1 1 1 Load Drop into FESW Currently, the Shift Supervisor is required to be a licensed Senior Reactor Operator. After the Decommissioning Plan is approved, a certification program will be conducted in lieu of maintaining licensed operations personnel. The l Shift Supervisor will then be a Certified Fuel Handler, rather than an SRO. I l l


_--_______,,_,m.

es i i l. LOSS OF i l Emergency Dieselj l l--------jGenerators Startj--------------------------------------- l Loss l l0f l - jlA EDG Sta l0ffsitej--------jlB EDG Starts l---l Operator Attemtpsl l .l Power l l1A EDG Doesn't l lTo Start 1A EDG l---l l0ccurs l - l Operator l l-- l Start 1A i l - l1B EDG Sta l l l l-----l1A EDG Starts l-----l Operator Attemptsj---l l l1B EDG Doesn'tl lTo Start 1B EDG l l l - l Operator l l Start 1B l - lBoth EDGs l l l l l Operator S l - l1B E No l l l l l


lNeither EDGl--------j0perator Attempts l-----joperator S l Starts l

lTo Start Both EDGsl-- l1A N l l l Operator - l Start Eith - ~

$ITE POWER l l llB FESW l l Operator Restarts l------------ ,_____________-----l Running l----l---lCCW Pumps l l l l l l _____ 0_- e I i 1 0 8 8 1 1 l l - l operator Cross-l l l l l l l connects Ess. Buses l-l _stl--(----------(--l1B FESW Pumps l--- l _l l l l l Running l---joperator Restarts:------------ l l l l1B CCW Pumps l i I i 1 m <__i n i =.. t i i i 1 l l -l operator Cross-l l l l l connects Ess. Buses l 4 I i 1 i stl--(----(--------lNeither FESWl-------j0perator Restarts l---------------- _j l l l l Pump Can Runl l1A CCW Pump j i i i a ml-I l I a i I i a re tsl------ l TI m LI APERTUltE i CARD l i is-l_________ he Avadahle on Li %perture Card T j---------------lNeither FESWl--------lNeither CCW l-------------------- [D,G l l Pump Can Runl l Pump Can Runj G (continued on next page) 3mlAObaOO-01

rr -.,--, --_ -- 1 i i LOSSOF0$ (cos lHPSW Diesel (s)l lOperats


l Start On Low l---------------------------------------------jCross-a l

lHPSW Pressure l l lHPSW TG l l l Coolers l lHPSW Diesels l l0perator Attemptsj l1A Or 1B HPSW l-


jDo Not Auto l---lTo Start 1A Or 1Bj---jDiesel Startedj l Start j

lHPSW Diesel jj l lNeither HPSW l -l Diesel Can Be l-----------o l Started j lHPSW Diesel (s)l ---l Start On Low l l lHPSW Pressure l l 1 1 1 1 l lHPSW Diesels l l Operator Attemptsj l1A Or 1B l l l Operator l -jDo Not Auto l---lTo Start 1A Or 1Bj---lHPSW Diesell---l Manually l--c l Start l lHPSW Diesel jj l Started l l Cross-l l l connects l l lNeither l lHPSW To j -jHPSW Can l-lCCW Coolers! lBe Started l l l ................................<..,/ ................o 1 i l lTo Compensate For


instrumentation l------------------------o lWithout Power And/or!

lAfter Batteries Are l l Depleted, Operator l l Checks FESW Locally l l Periodically j

  • As of January 1, 1988

l 1 iSITE POWER

'd)

JHanually! l Adequate FESW j l Evaluate Emergency l lMake Required l inn: cts l----l Cooling Achieved l---l Plan l---l Notifications l CCW l i l o______._______________ l 1 i l l l l i, /some FESW Cooling l l '{'{ &chieved. As Con-l-- l .e rvatism Assume l ll APER,I,URE4 2 me As No Cooling l ll CARD ll l Operator Addsj ll - l Colder Water l l j j lFrom OHST l Also AvaMahle on ll l lWhich Delays l bdure Ord a_------------------- l l l Boiling l l l o------------------l Evaluate l---lMake l---lFESW l------------------- l Emergency l l Required l l Starts l l Plan l lNotifi-l l Boiling l l cations l lAfter l l5 Days *l i-S711ao0800 - ca. 1 (continued on next page) ? i I b .b

LOSS OF d (cs l Operator Adds l l Operator Adds l - l Colder Water j - l Colder Water l l lFrom OHST Whichl l lFrom OHST Whichj j l Delays Control l l l Delays Fuel j j l Rod Uncovering l l jUncovering l l l l l Tops of j l l Top Of Fuel j


l Control Rods!-----------l Uncovered l

l Uncovered atl lat 23.1 Days *l l13.6 Days

  • l l

l l

  • As of January 1, 1988 1

f. iI

manm_-- i $ITE POWER d) l rgig APERTURE CARD Also AvaHahle On Aperture Card 8'1II9009D0- 05

s LOSS OF OFFSITE POWER NO. OF PEOPLE LOCATION TASK C.R. 1 PLANT l OF EVOLUTION l COMMENTS l l

1. Loss off offsite power 1

l l Control Room l Recognize alarm occurs. l l l l l l l l l

2. Operator attempts 1

l l Control Room j to start diesels. l l l l l l

3. Operator cross-1 l

l Control Room j connects Ess. Buses. l l l l l l \\ l l

4. Operator restarts 1

l l Control Room j CCW pumps. l l l I I \\ l l S. Operator starts HPSW 1 l l Control Room l Pumps. l l l l l l l l l

6. Operator starts HPSW j

1 l Cribhouse j locally. l l l \\ \\ \\ l l l

7. Operator cross-l 1

i Turbine Bldg.j connects HPSW to CCW j l Mezz. l Coolers. l l l l l l l l l

8. Operator takes local l

1 l Cont. Bldg. l FESW 1evel. l l 701' Level l l l \\ l l l

9. Operator adds water to l

1 l Cont. Bldg. j FESW. l l 701' Level orj l l Relief Valve l l l Platform j i l l l l

10. Evaluate as per 1

l l Control Room l Certified Fuel Emergency Plan. l l l Handler l l l \\ l l Page 1 of 2

I l LOSS OF 0FFSITE POWER NO. OF PEOPLE LOCATION TASK C.R. ! PLANT ! 0F EVOLUTION l COMMENTS l l l

11. Make notifications as 1

l l Control Room l per Emergency Plan. l l l Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified l ) l I 1 1 Page 2 of 2 I m_ _ _ - - - i

y LOSS l l l lBoth FESW l l Loss Ofl l Pumps Failj---lFESW l-------------------------------------------- l Cooling l l i l I i lBoth CCW j l Loss Ofl l l Pumps Faill---jFESW l l lOr CCW l l Cooling l l l System j l---jo l Shutdown l l lM l lF l lP lBoth LPSW l l Loss Ofl l Operator! lHPSW Cross! lFESW l l l l Pumps Faill---jFESW l---lAttemptsj---jConnected l---l Cooling l l l0r LPSW l l Cooling l lTo Cross-l Restored! l l System l l Connect j j l Shutdown l lHPSW To j jHP5W Cannotj j lCCW l---jBe Cross-l---------------l l l Coolers l l Connected l l l Loss Ofl l lFESW l l l Cooling l l lFor l lOther j lCause l u_

F FESW COOLING l -l Action Taken) l lTo Restore l l l Cooling l l l l l Time To Boiling l l l Operator Adds! lAnd Uncovery l l-l Water to FESWl---l Increases l I l rator j l Operator j l lOperatorj lFESW l l Top Of l l Top Of l itors l---l Monitors l---l Monitors l---l Commences l---l Control l---l Fuel l M Temp! lFESW j lCB Rad-l l Boiling j l Rods j (Un-iodi-l l Level l liation l lAfter j lUncoveredj l covered l ly -l lPeriodi-l l Levels j j5 Days l l13.6 Daysj l23.1 l lcally l lPeriodi-l l Days j lcally l TI APERTURE CARD Also AvaMahle On HAparture Card 81II9000D0 - 04

4 LOSS OF FESW COOLING LOCATION .l TASK NO. OF PEOPLE j OF EVOLUTION l COMMENTS C.R. l Plant l l l l

1. Recognize loss 1

l l Control Room l .j of FESW cooling l l l \\ l l l l l

2. Operator tries to i

1 j T.B. Mezz. l l cross-connect HPSW l l Floor l; j to CCW Coolers. j j l l l l

3. Operator monitors 1

l l Control Room l FESW temperature. l l l l l l l l l l

4. Operator monitors 1

l l Control Room j { FESW 1evel. l 1 l or 701 Level l l l l l l

5. Operator adds water 1

l l Control Room j to FESW.- l l l l l l l l l

6. Operator monitors 1

l l Control Room j Containment Building j j l Rad levels. l l l l 7.~ Action taken to 1 l l Control Room j ESWSS Restore FESW ccoling. l 2 j Outside & T.Bj Possibly (long term) l l Grade. l l l Location l I j j could vary l l j depending on j j j cause. l Minimum Staffing Requirement 1 Control Room Qualified Operator a Page 1 of 1 l I t L

,d 9n-UNCONTROLLED l Operator Starts Pumping l l Contents Of j l Waste or Retention Tank l---l Normal Activity l lTo River Which Is Not j l Sampled Or Was l---l Contents Of l---l Waste Water l---l Auto Val l Incorrectly Analyzed l lHigh Activity l l Monitor Alarms l l Closes O lHigh Acti lTerminati lDischa

hUIDWASTEDISCHARGE ~ l---l Auto Valvej - l Operator Closesj-------------- l l Fails To l---l jValve From C.R.l l yl 'lClose l l l l Call In l l l l--l Desired j _l l l lPersonnelj l l l l Valve Will Notl--l Operator l- - lClose Remotely l l Terminates! l Discharge l l Locally j ryrg APERTURE CARD Also AvaMahle On ~%perture Card 89 IDotoD2 sod- 06

UNCONTROLLED LIQUID WASTE DISCHARGE OPERATOR RESPONSE ACTIONS ~ LOCATION TASK NO. 0F PEOPLE l OF EVOLUTION l COMMENTS C.R. j Plant-l l 1 i j l

1. Operator observes high 1

l l Control Room l l waste water activity .l l l alarm. j l l l L l o

2. Operator checks waste 1

l l Control Room l water activity monitor. l l l l I I l I l l

3. Operator checks flow to' 1

j j Control Room j see if valve closed. I j l l l l \\ l l

4. Operator tries to close 1

l l Control Room l valve using thumb-l l l wheel. l l l l l l l

5. Operator manually closes l

1 l T.B. Grade l valve near standpipe. j l l l \\ \\ l l l

6. Operator stops running i

1 l T.B. Tunnel l l l l or C.B. l pump. l l Basement l l l l

7. Call in desired 1

l j j personnel. l l l l Onshift Staffing Required (Minimum Required) 1 in Control Room - Control Room Qualified Operator 1 in Plant - Auxiliary Operator Qualified Page 1 of 1 l l 1

.=- 7 i I i l FESW SYSTEM lFESW System l IFESW Startsj lFESW Lo/Highl l Operator! l Operator l l l l Pipe Breaksj---lTo Lose l---l Alarms In l---l Checks l---l Checks l---l l Water l l Control Room l jFESW j l Rad l l lWhen Level l l Level l l Monitors! l l Drops To l l l695' l l Operator Checks l l Operator Initiates!


l0ut Situation Inl---l Additional Makeup l---

l l Protective Cloth-l l ling With Rad l j l Monitor If No l l l lHigh Rad Alarms l l l Operator l l Operator l lWhen level l l l---l Secures l---lDe-energizes l---jReaches ~ l-- l l jFESW Pumpj l Electrical l l686' Control! l Equipment Inj l Rod In Upper! l Cont. Bldg. l l Tier Start. l lTo Uncover l lOnce Level Stabilizes! l Estimate Dose l l Call In l l Assess


l Operator May Secure l---lIn Containment---l Additional l---l Corrective l Remote Fill Valve l

l Building l l Personnel l l Action l Options

  • 0ther FESW Lines Penetrate The Well Higher Except For The Bottom Entry Pump

-w

i -I .j 1 J }PE~ BREAK 1 4 1

l I

.i i st. Bldg.'-(CB)l -l Operator Opens l-l Operator Checks! lOperatorj Boding, Alarms l---lFESW Remote l---lDemin Water l---lMay Iso-l------ Deictor,DC l l Fill Valve l-l Availability l l late-CB l pund: Alarms Inj ' atrol' Room-j ' l, l Operator In l' - l Control' Room l 'l l Checks Rad j l 2rea Rad j. l' l Monitor l l l Lowest Level l Normal FESW l Monitor. l--l l Reading ~l. l---l Reached Is l---l Cooling Un-l- -- 11 arms Irl-lL l j~ 679' l lAvailable, j sontroll l l lEveryone In .l l lSee Loss Of l~ loom And-l. l.jArea' Evacuates l l lFESW Scenario.l Locally ~l- .l Including l-lThough Less l l Operator j jTime is Avail-l lable For Action lTo Restore l l Cooling, > 1 l l Day Still To l l Boiling l -l Team Re-enter l p-lCB for Assess- .'jmsnt And/or -l I ['****** g r1tI,2Db2DO-Ola L~ TI .scharge Line Which Has Redundant Check Valves. APERTURE f CARD ~ r Also XvaMahle On ~%perture Card

m.; -r E+ FESW' SYSTEM PIPE BREAK .1 NO.:0F~ PEOPLE- -LOCATION: TASK-C.R. !' PLANT l OF EVOLUTION !' COMMENTS ~ l l l'

1. Low'FESW alarm.

.1 j. l Control Room'l-

l gl l

-l l l l 2.LOperator checks FESW 'l - .l j Control' Room l . level.- ,j 1 l 701 Level l I 'l .l

3. Operator checks' Rad.

1-j. l Control Room l-monitors. j' .l l l j i I i l ' 4'. Containment Building 1 l - l Control Room.l ' flooding alarm & DC. l j. l Ground alarm. l. l 'l 1 l l l l l

5. Operator, opens FESW 1

l l Control Room l Makeup Valve. l l l l l l l -l l-l 6.. Operator checks Demin 1 l l Control Room l 'I Water availability. l l l l l I. I i -7.-Operator isolates 1 l l Control Room l Cont. Bldg.. l 1 j Locally iso-l l l lates manual l l l valves in l l l T. B. Tunnel l l l l i i

8. Operator enters Cont.

I j. 'l Control Room l Bldg.'to check out j 1 l l situation if possible. l l l l .l 1 i 9.: Operator, initiates' -l 1 l Relief Valve l additional makeup. l l Platform l I I l \\ l \\ l

10. Operator secures FESW 1

l l Control Room l , ' pump.~ j 'l l C.B. Grade l l l Floor l l Page 1 of 2 - ~ - - - ~

I l. l FESW SYSTEM PIPE BREAK l I NO. OF PEOPLE LOCATION TASK C.R. ! PLANT ! 0F EVOLUTION l COMMENTS I l 11.. Operator opens MCA 1 l l Control Room i breaker switch, j j l l l l l l l l

12. Operator received Hi 1

l l Control Room l l J Rad monitor alarms & l l l evacuates Cont. Bldg. l l j f l l l \\ l l \\ t

13. Estimate dose in Cont.

1 l l Control Room l CFH Qualified Bldg. l l l l l l l

14. Call in more 1

l l Control Room j personnel. l l l l l l l l l

15. Assess corrective 1

l l Control Room l Long term. No one actions and teau j 2 l Cont. Bldg. l enters alone after enters Cont. Bldg. l l l eracuation. l to assess or repair. l l l Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified \\ 1 1 l i Page 2 of 2 3 0 l

a_. - i, WIND _ lIf Operator l_ l lIs In C.B.,l l l j0perator ll l Design l l Containment l l Turbine l lIf Stacksj j l Survives ll l Basis l---l Building l---l Building l---jFall,Theyj---l l-- lHigh l l Withstands l l Diesel l lDo Not l l lIf Operator l l l Wind Orl l Event l l Building l l Impact CBl l_lIs Elsewherel_l l Tornado l lCribhse j lMay Survive j l Event l l Switch-l l0ccurs*l l yard Arej l Damaged j

  • Of Magnitude and Causing Damage as Discussed in the Consequence Study.

mm.. o 7 ) iTORNADO' s, I i l 1 1 Qtential. j '- ~jSubstantialj l Assess l ~ lClassifyj-lMake Reg'dl' l Call Inj l 2nt ':- l---l Time .l---l Damage l---l Emergency--lNotifica-l--lHP And l. ncques.l l Available-..l lTo l- ~jPer Planj ltions l lOther j

Most. j l(Days) Be-j '

l Equip-l l Desired! tcern Are .l fore Action l l ment l l Person-j. bilar.Tol-lMust be l lnel l 3s 0f' 'j;.lTaken To l 7 site. j. .l Protect-Mr Withj -l Fuel j l Blure Ofl-5 Onsitel rer l l r [ 891I2002h0- 01 h Tl APERTURE l1 CARD Also Avaliable On~ Aperture Card L:____.___- .___:___.__u_______________.__.-____._______________ .__:.____n________________.____.____._____ _ _ o

~ l .j WIND AND TORNADO LOCATION TASK NO. OF PEOPLE l OF EVOLUT10" l COMMENTS C.R. l Plant l l l l l 1, Recognize event. 1 l l Control Room l l l l l l l

2. Operator survives.

l 1 l Cont. Bldg. l Operator in l l l Control Room may l l l not survive. l l l l l l l

3. Assess damage to 1

l 1 l Plant Tour & l equipment.. l l Control Room l l l l l l l

4. Classify as per 1

l l Control Room l Emergency Plan. l l l l t l l l l l l 1

5. Make required 1

l l Control Room l~ notifications. j l l l l l l l l

6. Call in other 1

l l Control Room l l personnel. l l l

  • Refer to Loss of Offsite Power for Subsequent Actions Minimum Staffing Requirement 1 Certified Fuel Handler Qualified 1 Auxiliary Operator Qualified 1

i Page 1 of 1

l I, a N ) Sf l! 1 N f ) F )'t l: i j' f'. l-1 i' ) l~ l Design Basis l l Cont. Bldg.l lSome Damagaj lIn Cont. Bldg.l lFESW L l Earthquake-j---lAnd Stacks l---joccurs To l---lSome Equipment l---l Break-l l0ccurs j l Withstand j l Diesel Bldg l l Damage, FESW -j lCausia l Event l lTurb. Bldg.j l Intact, Dis-l l0f Lem 3. lCribhouse l l charge Line -l Point 1 l Intact Between! Contrs lWell And Check! lAre Ps l Valves l lUncov@ l Fuel @ lCoverm wm______.

2IC EVENT May l l Consequences Similarl l Loss Of Offsitel lSubstant.l l Assess l sherel---lTo FESW System Pipe l---lAnd Onsite Power---l Time (Day)---l Damage l 1ss l l Break Event, But l lPossible Due Toj lAvailablel lTo l o j l Remote Fill Valve l l Switchyard, l lFor l l Equip-j te l lMay Not Work. Local l l Turbine Bldg. &l l Response.l l ment l bds j l(701') Rad Levels l l Diesel Bldg. l l Refer To l 111y l lHigh, But Time l l Damage. l l Loss Of l But! lAvailable For l l0ffsite j j l Response l l Power .ns l l Event l TI APERTURE CARD Ab4 AvaMahle on Aperture Card e7ll200200 -08

SEISMIC EVENT LOCATION TASK NO. OF PEOPLE j OF EVOLUTION j COMMENTS C.R. l Plant l l l l

1. Recognize event.

1 l l Control Room l l l \\ l l

2. Assess damage to 1

l 1 l Plant Tour & l equipment. j j Control Room l l l

3. Add water to FESW 1

l l Control Room l remote. l l l l l l l 3a. Add water to FESW l 1 l 701' Level j local. l l l l l l l l l

4. Response to affected 1

l l Control Room l equipment. l l l Refer to Loss of Offsite Power and/or FESW Line Break for Subsequent Actions Minimum Staffing Requirements 1 - Certified Fuel Handler Qualified 1 - Auxiliary Operator Qualified l Page 1 of 1

ne l l Fire l l Fire l l Operator j l Operator l lFireResponsej l Breaks l-----l Alarm l---l Responds By l-----l Announces l---l Team Respondst lOut j j l_ l l Checking Panelj l l Fire & l lTo Assess j l l Location l l Situation l l l lOn Pane l l l Fire l l0bserverl l - jobservedl---lContactsj----- l Control l l Room l 1 i l

(RE l l l l Operator! l Fire Re-l l Person Calls! l Operator l i--l Starts l---lsponse Teamj-----l Genoa Fire l-----l Monitors l l1 HPSW j l Fights Fire l-- l Dept. For l jj lHPSW Sys. l l l Diesel l l l Assistance l ll l Rad Monitorj j I II I _________________ l l l lIf Fire In l l - l Control Room, j -- l Operator l l Monitors HPSW j l Diesels Locally l (continued on next page) 87/1260200 - D9 TI APERTURE CARD Also Avagable On Aperture Card

F (C - l Fire Inl---jFire It j l Turbine l l lContro l l Bldg. ll lRoo l l l 1 l l---l Fire Inl---l Lose l l Diesel l lEss. l lBidg. l l& 1B l l Int. l l125V I l lD.B. l l l - lMake Requiredj - l l l Notifications! l l Account l l l Evaluate l l l--lFor All l---l---l Fire In l---lL


lIf Emer-l lPersonnell l

l Cont. Bldg.j lF lgency Perl l l l Plan l l l -jSpr j l l& P l l Fire Inl l lW/0 l---l Crib-l---l l l l house l l l l lHPS l -l Dam l l i l l i l l l Fire In Otherj l - l Building Or l---l l0utside l l l ll -l l l l

i

i n-

>lOpsrator j---l Potential Plant l---l Considerable l---l Concentration l l Monitors:l !~l Consequences l' jTime Avail-l lOn Extinguish-l-lHPSW Sys.l l'l Bounded By Loss l lable (Days) l ling Fire l lFrom- ' j-l l0f Offsite. l lTo Correct. l -lCribhousej l l Power' Accident j .jEquip. Damagej sl---'l Potential l---l Consider-.l---lConcentra l---l Operator l---l Operator l l-l Plant Con-lable Time l-l tion on l l Starts l l Observes l l lcequencesl lAvailablel l Extinguish-l1A FESW j lFESW l bl l Bounded By l(Days) Tol-ling Fire l l Pump If j l Locally l 'l l Loss Of l-l Correct -l lNot j lPeriodi-l ,j l0ffsite l-lEquipmentj. jRunning l lcally l l Power. l l Damage l lSince FESW jAccident'j. l Level Inst. l Analysis j. lW/0 Power l ,l---l Potential l-l Refer Toj l Considerable l Concentration l l Damage Of-l---l Loss Of l---l Time Avail-l---jon Extinguish-j j l Concern Isj jFESW l lable (Days) l ling Fire l o gj

-l Loss Of l

l Cooling l lTo Restore l H lFESW Pumpsj 'l Accident l lFESW Cooling l l Hook Up Toj---lConcentra-l Drs. Work, l.. lG-3 For l l tion'On j i st.Firo l-l Fire Sup-l l Extinguish-cificant l lpression j jing Fire l nt Damaanj -lLPSW Pump (s) l-----------------l Water Or j i j lStill Operatej j lUse ESWSS l ) Scolsl-----l l Pump l Tl i j -lLPSW Pumps l---l Consequence l l Damaged l lTo Plant l APERTURE lSame As CARI) l Loss of FESWl l l Cooling / l l Considerable! Also AvaMahle on l Time (Days) l '%perttare Card lAvailable Toj l Restore j 87/120DMb-m Plant l l Concentration On l l nequencesl---l Extinguishing Firej 9 in l-l Loss Ofj l Considerable l lImmediate l lGo To Loss! schyard l---l0ffsitej---jTime Avail-l---l Concentration l---l0f Offsitej Dgas j l Power l lable (Days) l lOn Extinguish-l Power l 1 grve l lTo Respond l ling Fire l l Accident j psformerl l i l

FIRE NO. OF PEOPLE LOCATION TASK C.R. ! PIANT ! 0F EVOLUTION ! COMMENTS l l l

1. Fire alarm & acknow-1 l

l Control Room l ledgement. l l l l l l l l l

2. Fire observed and l

1 l Plant Control Room contacted. l j j l l l l l

3. Operator alerts fire 1

l l -l brigade. l l l 1 l l l l l

4. Fire brigade responds.

1 l l Control Room j j 1 l Fire Location l Brigade leader l l l l l l

5. Operator starts > 1 1

l l Control Room l HPSW pump or ensures l l l auto start. l l l l l l l l l

6. Fire fighting, j

3 j Fire Locationi 1-Operations l l l 2-Other or Ops. 1 l l Control Room l Calls additional l l l help from local l l l Fire. Dept. l l l

7. Operator monitors Rad 1

l l Control Room l levels, HPSW pressure, j 1 l Fire Location! Brigade leader. & adjusts vent flow as l l l directed. l l l l l l l l l l

8. Fire in Control Room-l 1

l Cribhouse l operator monitors HPSW l l l pressure in Cribhouse. j l l 3 I I l i l l

9. Evaluate as per 1

l l Control Room l Shift Supervisor i' Emergency Plan. l l l i Page 1 of 2 l 1 l E____---------- 1

f l i FIRE l .NO. OF PEOPLE LOCATION . TASK C.R. ! PLANT l OF EVOLUTION l COMMENTS l 10.'Make notifications. 1 l l Control Room l I I' I l l l

11. Account for personnel.

1 l l Control Room l l 1 l Fire Location! I I I l l l

12. Fire in Cribhouse-l 2

l River Bank orl l deploy ESWSS Pumps or' l l SW of Turbine l cross-connect with l l Building l G-3. l l l l NOTE:' Fire in other locations covered by other scenarios. i Minimum Staffing Requirements l 1 4 People of which 1 - Certified Fuel Handler Qualified, Fire Brigade Leader Qualified 1 Control Room Operator Qualified, Fire Brigade Leader Qualified 1 i i j Page 2 of 2 i i f _ _ _. ____ _ __ a

r H: [. y a. SPENT FUEL E o lDuring Fuel l-l Fuel l l Cladding l l Cladding l l Area. j' l@ l Handling'Inl'--l Assembly l---lOn All-l---l Gap Gas 'l---jRadiationl---lC jFESW, Fuel'l l Hits l l Pins In ~ l l Activity. l l Monitor-j' lQ u l Assembly' l lAnother j. lBoth As-l .l Starts 'l l Alarms .'l j@ 1 Drops Off j l Assembly l-lsemblies j jExiting l l Locally &l- -l6 .lHolst l ~ lIs Damagedj l Cladding-l lIn Control. jy j& Bubbling l l Room' l lUp Throughl l Pool Waterj l Prompt Actions l lLong Term - l Cont. Bldg. l------- jRelease Is l---lSame As In Other j ---l0f What TG ? 'jIsolates-j' l l Limited l l Chain But Offsite. l Activity ( l l l Dose Less l L 'll or more l l Operator (s)l l Cont. Bldg.l - l Cont. Bldg.l---jAttempts tol---lIs Isolated l l Iso. Valves l 'l Isolate. ll lDo Not~ j l Cont. Bldg.l-l.l Cont. Bldg. lMonitorj lClast '~ lCannot Be . ---l Stack l---lEmerg lClose l _l Isolated j l Release l lPer0 l Stack l l Max. Postulated Offsite Dose *l - l Release l---l0.05 mrem Whole Body l-----------------------< l l4.2 mrem Skin l l ~ .....j j l Ground Release l l Max. Postulated Offsite Dose *j l Monitor - l(Leak To other l---l2.25 mrem Whole Body l---j0ffsite-lThan Turbine Bldg)j. j187 mrem Skin j l Rad Leve:

  • As of October 1987

-~

L L s L SLING ACCIDENT ~ pber ofj. l Fuel = l Cont. Bldg.l jOperator j l Operator.l---------- D1.' -l a-l Handling; ---l Gas Activity---jchecks-l---l Evacuates l $dling l l Crew l Monitor-l l Activity & l Cont. l bw Op:ns . lEvacuatej l Alarms In l l Radiation l l Building' l tidg2- ~ j' .jControl Rm'l l Monitors j msker j j l btorminstionl Do With' l a Building: t-lfy lMake Notifi-l l Call In l lMake Pre-l l Monitor j sney.; e---l cations To l---lHP Tech.l---l11minary Dosej---lOnsite l------ > Plan l; - .l State, County l l Assessment l l Rad Levelsj lNRC, Plant l -jSupt. And l l Reactor Eng. l 1 l l l n. l .l -l Conduct Dosej-l Develop l l 3;l-----l Assessment l---jRecovery Plan l' l y; 87//Zbogoo-II 2l -- TI APERTURE CARD i Also Avalfable On " Aperture Card

7, {3 i 4 SPENT FUEL HANDLING ACCIDENT NO. OF PEOPLE LOCATION TASK C.R. l PLANT ! 0F EVOLUTION 1 COMMENTS l 1 l

1. CFH opens bridge l

1 l 701' Level l breaker. l l l l l l J l l l ?

2. Operator checks C.B.

-1 l l l activity and radiation. l l Control Room l l I l I l l

3. Operator evacuates C.B.

1 l l Control Room j I l l l l l

4. Operator tries to j

l j isolate C.B. remotely. 1 l l Control Room l I I I l l l

5. Operator tries to l

1 l T.B. Tunnel l { isolate C.B. locally. l l l l l t l l

6. Monitor stack releases.

1*l l l l l l l l

7. Classify as per 1

l l Control Room j Shift Supervisor Emergency Plan. l l l l l l l l l

8. Make notifications as 1

l l Control Room l per amergency Plan. l l l 4 i i lOnsite

9. Monitor onsite dose l

1 levels. l l l l l l

10. Preliminary assess dose.

1 l l Control Room j CFH Qualified

  • CFH and/or Control Room Qualified Operator i

Minimum Staffing Requirements 2 People j ? 1 - Certified Fuel Handler Qualified i 1 - Control Room Operator Qualified l Page 1 of 1 l 1 l l

t ! ennus ' cttw

O t,

11 SHIPPING CASK OR L lDuring Fuell l Heavy l l Cladding Ofl l Cladding Gap l l Area l ll l Shipping, l l Load j lAll Fuel l l Gas Activity l l Radiation l l; l Shipping l---lDropsj---l Assemblies l---jStarts Exiting--l Monitors l --- j( l Cask Falls j lInto l lIn FESW l l Cladding And! l Alarm j ll jFrom Crane l lFESW j l Ruptures l l Bubbling Up l l Locally & l jj lInto FESW l lThrough Pool! lIn Control! l Room l l.' l i l lReleasej ll L - l Cont. Bldg. l--------------------------------------------jIs l --- j f l. l l Isolates On l l l Limited l l1 l lHigh Activityj j lj l l l1 l _l Cont. Bldg.l--- h l l lIs Isolated! l( l l1 Or More Cont, j l Operator (s)l. l lj - l Isolation Valves l--jAttempts Toj---! l lDo Not Close j l Isolate l l_ jCont. Bldg.j l Monitor l lCls l Cont. Bldg.l lCannot Be l---l Stack l---l Ems l Isolated l l Releases l l As 2 lPer - l Stack l----------l Max Postulated Offsite Dose *j-l lReleasej l4.2 mrem Whole Body jj l l350 mrem Skin ll lMonitorj lCor ---l l---j0ffsitel---lDo; j l Ground Releasej l Max Postulated Offsite Dose *l l l Rad j l&g - l Leak To Other l---jl86 mrem Whole Body l-l Levels l lThan Turbine l l15.6 Rem Skin l l Building l

  • As of October 1987

~a

f 3 -Qj 'l LOAD DROP INTO.FESW j I Ej; l Cont. Bldg.lL 'l Operator.j l Operator.l ~- l '. 'l Gas Activity-l Checks.. l l Evacuates l Ll---l Monitor ~l---l Cont. l------------------ L l --- l Monitor'.. j. lFor Ac. l l Building j I~ .l. 'l Alarms:In ill t - l Control' - l 'jtivity & l ll Room' j'- l Radiation)- 1 .) Actions l .lLong Term l OIn Other---l Determination l 1 But-j j' jof What To Do! i ) 3 Do Notl jWith7Activityj p Ba:Taken. -lIn Building j skly And j. fDoses'-l i se - j. 1 l- 'lMake Notifi-l l Call In l lMake Pre-j -l Monitor l. [---l cations To l---lHP Tech (s)l---lliminary l---lOnsite l----------- l [. 'l County,'NRC,l j& Anyone j l Dose l Rad j ) [ 'l State, Plant! lElse l l Assessment - Levels ! l -jSuperinendent l Wanted l

jReactor Eng.j-l i

o.ji l Develop-l @[---{i [ ((M M M /g Recovery l Plan T1 APERTURE j CARD Aha Available On Aperture Card i

l N' .j ' SHIPPING CASK OR HEAVY LOAD DROP INTO FESW i LOCATION TASK NO. OF PEOPLE l OF EVOLUTION l COMMENTS C.R. j Plant l l l l

10. Dose assessment.

1 l l Control Room l CFH Qualified I l i j i

11. Monitor Rad levels.

1 l l Control Room l Note: 10 & 11 done l l l at same time and i j j l continue for dur-l- l l ation of release. i Minimum Staffing Requirement I 3 People of which al 1 - Certified Fuel Handler with Dose Assessment Training i 1 - Control Room Qualified Operator l 1 - Auxiliary Operator Qualified l \\ I Page 2 of 2 o

r. 1:, 1 J 1 1 1 SHIPPING CASK OR HEAVY LOAD DROP INTO FESW l 1 i 4 LOCATION TASK NO. OF PEOPLE j OF EVOLUTION l COMMENTS j .C.R. l Plant j' l l l

1. Cask or heavy load 1

l l Control Room l At'least 1 drop into.FESW. l 2 l 701' Level l CFH's. I l l l l l

2. ARM's alarm locally 1

l l Control Room j & in Control Room. l l l l l l I i l l

3. Containment Building 1

l l Control Room j evacuation. l l l l l l

4. Operator. monitors Rad 1

l-l Control Room j monitors in Control l l l . Room. l l l l l l l l l

5. Recognize Containment 1

l l Control Room l l Building not isolated l 1 l T.B. Tunnel j and isolate remotely l l l l and/or locally. l l .l l l l l l l

6. Monitor' stack releases.

1 l l Control Room l l l l \\ \\ \\

7. Classify as per 1

i l Control Room l Shift Supv.(Cert. Emergency Plan. l l l Fuel Handler)

8. Make notifications as 1

l l Control Room l Emergency Plan. l l l I I I I I I

9. Call in additional 1

l l Control Room l personnel. l l l l l l l l l Page 1 of 2 l l - - - - -. _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _.}}