ML20237A976: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:__                         _
{{#Wiki_filter:__
s UNITED STATES NUCLEAR REGULATORY COMMISSION                 ,
s UNITED STATES NUCLEAR REGULATORY COMMISSION
m..  .; a 1997 i
,,.; a 1997 m..
LICENSE AMENDMENT FOR SPECIAL NUCLEAR MATERIAL SAFEGUARDS l
i LICENSE AMENDMENT FOR SPECIAL NUCLEAR MATERIAL SAFEGUARDS l
i Pursuant to the Atomic Energy Act of 1954, as amended, the Energy                         l Reorganization Act of 1974, and Title 10, Code of Federal Regulations, Chapter 1. Part 70, the following amendment to the special nuclear material license identified below is hereby issued, incorporating specific safeguards               l requirements for special nuclear material.                                               I
i Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, and Title 10, Code of Federal Regulations, Chapter 1. Part 70, the following amendment to the special nuclear material license identified below is hereby issued, incorporating specific safeguards l
                                                                                              )
requirements for special nuclear material.
l License:                                                                                 )
I
Name:   C-E Power Systems                             License No: SNM-33 Combustion Engineering , Inc.
)
Safeguards Amendment:     SG-1 Address: Highway P Hematite, Missouri 63047                   Docket No.:   70-36 I
l License:
)
Name:
C-E Power Systems License No: SNM-33 Combustion Engineering, Inc.
Safeguards Amendment:
SG-1 Address: Highway P Hematite, Missouri 63047 Docket No.:
70-36 I
Date issued: November 30, 1987 A reissue of MPP-3 in its entirety l
Date issued: November 30, 1987 A reissue of MPP-3 in its entirety l
CONDITIONS                                       l Section 1.0 --- Material Control & Accounting 1.1 The licensee shall, no later than 60 days after the date of issuance of this license condition, follow Chapters 1.0 through 8.0 of its               ,
CONDITIONS Section 1.0 --- Material Control & Accounting 1.1 The licensee shall, no later than 60 days after the date of issuance of this license condition, follow Chapters 1.0 through 8.0 of its Fundamental Nuclear Material Control Plan submitted pucsuant to 10 CFR 74.31(b), titled " Fundamental Nuclear Material Control Plan, Combustion Engineering, Inc.,
Fundamental Nuclear Material Control Plan submitted pucsuant to               l 10 CFR 74.31(b), titled " Fundamental Nuclear Material Control Plan, Combustion Engineering, Inc., Hematite Plant," dated January 1986 and as revised by June 1987, Revision 1 pages. Revisions to this Plan shall be made in accordance with the provisions of either 10 CFR 70.32(c) or 70.34.                                                             '
Hematite Plant," dated January 1986 and as revised by June 1987, Revision 1 pages.
Revisions to this Plan shall be made in accordance with the provisions of either 10 CFR 70.32(c) or 70.34.
Section 2.0 --- Physical Protection For SNM of Low Strategic Significance 2.1 The licensee shall follow the security plan entitled, " Physical Security Plan for Protection of Nuclear Material of Low Strategic Significance" dated May 1980; as revised by page 2-1 dated October 1987; and as rev!. sed in accordance with the previsions of 10 CFR
Section 2.0 --- Physical Protection For SNM of Low Strategic Significance 2.1 The licensee shall follow the security plan entitled, " Physical Security Plan for Protection of Nuclear Material of Low Strategic Significance" dated May 1980; as revised by page 2-1 dated October 1987; and as rev!. sed in accordance with the previsions of 10 CFR
: 70. 32 (e) .
: 70. 32 (e).
8712150379 071130 PDR   ADOCK 07000036 C                     PDR
8712150379 071130 PDR ADOCK 07000036 C
PDR


t I                                                                                                                                                                                                       l
t I
                                                                            .                                                    -                                          4207                             j
l 4207 j
: v.       .-
v.
l 2.2 The licensee shall ensure that the surveillance tour, conducted by     I the guard or authorized person in accordance with Section 3.1.1, includes surveillance over the UF6 utdoor storage area.
l 2.2 The licensee shall ensure that the surveillance tour, conducted by I
For the Commission Ls     'A     /Ad E. William B ach, Chief Licensing Branch Division of Safeguards and Transportation, NMSS Date issued: November 30, 1987 1
the guard or authorized person in accordance with Section 3.1.1, includes surveillance over the UF6 utdoor storage area.
For the Commission Ls
'A
/Ad E. William B ach, Chief Licensing Branch Division of Safeguards and Transportation, NMSS Date issued: November 30, 1987 1
i l
i l
l i
l i
i
i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _                                    _                                _ __ J}}
_ __ J}}

Latest revision as of 08:30, 2 December 2024

Safeguards Amend SG-1 to License SNM-33,requiring Implementation of Revised Fundamental Nuclear Matl Control Plan
ML20237A976
Person / Time
Site: 07000036
Issue date: 11/30/1987
From: Brach E
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20237A927 List:
References
NUDOCS 8712150379
Download: ML20237A976 (2)


Text

__

s UNITED STATES NUCLEAR REGULATORY COMMISSION

,,.; a 1997 m..

i LICENSE AMENDMENT FOR SPECIAL NUCLEAR MATERIAL SAFEGUARDS l

i Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, and Title 10, Code of Federal Regulations, Chapter 1. Part 70, the following amendment to the special nuclear material license identified below is hereby issued, incorporating specific safeguards l

requirements for special nuclear material.

I

)

l License:

)

Name:

C-E Power Systems License No: SNM-33 Combustion Engineering, Inc.

Safeguards Amendment:

SG-1 Address: Highway P Hematite, Missouri 63047 Docket No.:

70-36 I

Date issued: November 30, 1987 A reissue of MPP-3 in its entirety l

CONDITIONS Section 1.0 --- Material Control & Accounting 1.1 The licensee shall, no later than 60 days after the date of issuance of this license condition, follow Chapters 1.0 through 8.0 of its Fundamental Nuclear Material Control Plan submitted pucsuant to 10 CFR 74.31(b), titled " Fundamental Nuclear Material Control Plan, Combustion Engineering, Inc.,

Hematite Plant," dated January 1986 and as revised by June 1987, Revision 1 pages.

Revisions to this Plan shall be made in accordance with the provisions of either 10 CFR 70.32(c) or 70.34.

Section 2.0 --- Physical Protection For SNM of Low Strategic Significance 2.1 The licensee shall follow the security plan entitled, " Physical Security Plan for Protection of Nuclear Material of Low Strategic Significance" dated May 1980; as revised by page 2-1 dated October 1987; and as rev!. sed in accordance with the previsions of 10 CFR

70. 32 (e).

8712150379 071130 PDR ADOCK 07000036 C

PDR

t I

l 4207 j

v.

l 2.2 The licensee shall ensure that the surveillance tour, conducted by I

the guard or authorized person in accordance with Section 3.1.1, includes surveillance over the UF6 utdoor storage area.

For the Commission Ls

'A

/Ad E. William B ach, Chief Licensing Branch Division of Safeguards and Transportation, NMSS Date issued: November 30, 1987 1

i l

l i

i

_ __ J