TXX-6661, Final Deficiency Rept CP-84-28 Re Rosemount Transmitters W/Leakage Path Between Sensor Module & Housing.Initially Reported on 841119.Affected Transmitters Repaired,Reworked & Reinstalled.Supporting Documentation Available at Site: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
7 M Ps*,i M ll=l"
7 M Ps*,i M ll=l" =
                                                                      =~                  Log # TXX-6661 Fi1e # 10110 E       E                             907 1UELECTRIC wimm c.
Log # TXX-6661
c",""""
~
Executive Vice Pvsident August 25, 1987 U. S. Nuclear Regulatory Commission                                                                 '
Fi1e # 10110 E
Attn: Document Control Desk Washington, D. C. 20555
E 907 1UELECTRIC wimm c. c",""""
August 25, 1987 Executive Vice Pvsident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 00tKET NOS. 50-445 AND 50-446 ROSEMOUNT TRANSMITTERS SDAR: CP-84-28 (FINAL REPORT) l Gentlemen:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 00tKET NOS. 50-445 AND 50-446 ROSEMOUNT TRANSMITTERS SDAR: CP-84-28 (FINAL REPORT) l Gentlemen:
On November 19, 1984, we notified you by our letter, logged TXX-4364, of a deficiency regarding transmitters with a potential leakage path between the sensor module and housing which we deemed reportable under the provisions of 10CFR50.55(e). This item was subsequently identified by our last report logged TXX-6435, dated May 13, 1987, as an item for which the corrective l               actions were formulated but the schedule for the implementation of those actions was not established. This is a final report submitted to status I               corrective actions which have been implemented.
On November 19, 1984, we notified you by our letter, logged TXX-4364, of a deficiency regarding transmitters with a potential leakage path between the sensor module and housing which we deemed reportable under the provisions of 10CFR50.55(e).
This item was subsequently identified by our last report logged TXX-6435, dated May 13, 1987, as an item for which the corrective l
actions were formulated but the schedule for the implementation of those actions was not established.
This is a final report submitted to status I
corrective actions which have been implemented.
As previously stated in our report logged TXX-4364, the affected transmitters were documented on nonconformance reports (NCR) I-84-100466-S (closed December 16,1986) for Unit 1 and NCR I-84-200169 (closed October 29,1984) for Unit 2.
As previously stated in our report logged TXX-4364, the affected transmitters were documented on nonconformance reports (NCR) I-84-100466-S (closed December 16,1986) for Unit 1 and NCR I-84-200169 (closed October 29,1984) for Unit 2.
In accordance with the NCR's, the affected transmitters have been repaired or reworked at either the supplier's facility or the site and reinstalled.
In accordance with the NCR's, the affected transmitters have been repaired or reworked at either the supplier's facility or the site and reinstalled.
,              Supporting documentation is available at the CPSES site for your Inspector's review.
Supporting documentation is available at the CPSES site for your Inspector's review.
Very truly yours, IJ . C . M W. G. Counsil By:             .
Very truly yours, IJ. C. M W. G. Counsil By:
v/W. Beck tice President, Nuclear Engineering c-       Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) q 1                                                                                                               D l                                             @ Nonis Olhe Sm LB 81 Dallas, Taas 75201 D    DO            O        45 i S                         PDR E_________
v/W. Beck tice President, Nuclear Engineering c-Mr. R. D. Martin, Region IV q
Resident inspectors, CPSES (3) 1 D
l D
DO O
45
@ Nonis Olhe Sm LB 81 Dallas, Taas 75201 i
S PDR E


g_
g_
I
I
                    'I p,           %
'I p,
b             3 Ot-9;%*/
b 3
9;%*/
Ta 1
Ta 1
s Y       h
Ot-
          /             e     l m       <
-s Y
h
/
l e
m i
i I
i I
l 1
l 1
i I
l l
1 l
l l
i}}
i}}

Latest revision as of 07:03, 2 December 2024

Final Deficiency Rept CP-84-28 Re Rosemount Transmitters W/Leakage Path Between Sensor Module & Housing.Initially Reported on 841119.Affected Transmitters Repaired,Reworked & Reinstalled.Supporting Documentation Available at Site
ML20238A551
Person / Time
Site: Comanche Peak  
Issue date: 08/25/1987
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-84-28, TXX-6661, NUDOCS 8708310123
Download: ML20238A551 (2)


Text

-

7 M Ps*,i M ll=l" =

Log # TXX-6661

~

Fi1e # 10110 E

E 907 1UELECTRIC wimm c. c",""""

August 25, 1987 Executive Vice Pvsident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 00tKET NOS. 50-445 AND 50-446 ROSEMOUNT TRANSMITTERS SDAR: CP-84-28 (FINAL REPORT) l Gentlemen:

On November 19, 1984, we notified you by our letter, logged TXX-4364, of a deficiency regarding transmitters with a potential leakage path between the sensor module and housing which we deemed reportable under the provisions of 10CFR50.55(e).

This item was subsequently identified by our last report logged TXX-6435, dated May 13, 1987, as an item for which the corrective l

actions were formulated but the schedule for the implementation of those actions was not established.

This is a final report submitted to status I

corrective actions which have been implemented.

As previously stated in our report logged TXX-4364, the affected transmitters were documented on nonconformance reports (NCR) I-84-100466-S (closed December 16,1986) for Unit 1 and NCR I-84-200169 (closed October 29,1984) for Unit 2.

In accordance with the NCR's, the affected transmitters have been repaired or reworked at either the supplier's facility or the site and reinstalled.

Supporting documentation is available at the CPSES site for your Inspector's review.

Very truly yours, IJ. C. M W. G. Counsil By:

v/W. Beck tice President, Nuclear Engineering c-Mr. R. D. Martin, Region IV q

Resident inspectors, CPSES (3) 1 D

l D

DO O

45

@ Nonis Olhe Sm LB 81 Dallas, Taas 75201 i

S PDR E

g_

I

'I p,

b 3

9;%*/

Ta 1

Ot-

-s Y

h

/

l e

m i

i I

l 1

i