TXX-6661, Final Deficiency Rept CP-84-28 Re Rosemount Transmitters W/Leakage Path Between Sensor Module & Housing.Initially Reported on 841119.Affected Transmitters Repaired,Reworked & Reinstalled.Supporting Documentation Available at Site

From kanterella
(Redirected from TXX-6661)
Jump to navigation Jump to search
Final Deficiency Rept CP-84-28 Re Rosemount Transmitters W/Leakage Path Between Sensor Module & Housing.Initially Reported on 841119.Affected Transmitters Repaired,Reworked & Reinstalled.Supporting Documentation Available at Site
ML20238A551
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/25/1987
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-84-28, TXX-6661, NUDOCS 8708310123
Download: ML20238A551 (2)


Text

-

7 M Ps*,i M ll=l"

=~ Log # TXX-6661 Fi1e # 10110 E E 907 1UELECTRIC wimm c.

c",""""

Executive Vice Pvsident August 25, 1987 U. S. Nuclear Regulatory Commission '

Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) 00tKET NOS. 50-445 AND 50-446 ROSEMOUNT TRANSMITTERS SDAR: CP-84-28 (FINAL REPORT) l Gentlemen:

On November 19, 1984, we notified you by our letter, logged TXX-4364, of a deficiency regarding transmitters with a potential leakage path between the sensor module and housing which we deemed reportable under the provisions of 10CFR50.55(e). This item was subsequently identified by our last report logged TXX-6435, dated May 13, 1987, as an item for which the corrective l actions were formulated but the schedule for the implementation of those actions was not established. This is a final report submitted to status I corrective actions which have been implemented.

As previously stated in our report logged TXX-4364, the affected transmitters were documented on nonconformance reports (NCR) I-84-100466-S (closed December 16,1986) for Unit 1 and NCR I-84-200169 (closed October 29,1984) for Unit 2.

In accordance with the NCR's, the affected transmitters have been repaired or reworked at either the supplier's facility or the site and reinstalled.

, Supporting documentation is available at the CPSES site for your Inspector's review.

Very truly yours, IJ . C . M W. G. Counsil By: .

v/W. Beck tice President, Nuclear Engineering c- Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) q 1 D l @ Nonis Olhe Sm LB 81 Dallas, Taas 75201 D DO O 45 i S PDR E_________