TXX-6713, Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-                                                                -
{{#Wiki_filter:-
1 M
1 M
s                                               lllllll:' ':llllllll             Log # TXX-6713
s lllllll:' ':llllllll Log # TXX-6713 Tile # 10110
                                                            -            ~"-
~"-
::            Tile # 10110
905.3
                                                            ~~            -
~~
905.3 Ref # 10CfR50.55(e)
Ref # 10CfR50.55(e)
                  ,                                      TUELECTRIC wimam c. coune                                                                 e,eptember 3, 1987 rm,a~c u m&m U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washingtor., D.C, 20555
TUELECTRIC wimam c. coune e,eptember 3, 1987 rm,a~c u m&m U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washingtor., D.C, 20555


==SUBJECT:==
==SUBJECT:==
C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES)                                               l 00CPET NOS. 50-445 AND 50-446 FLUX MAPPING SEAL TABLE RE31RAINTS SDAR: CP-85-40 (SUPPLEMENTAL REPORT)
C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES) l 00CPET NOS. 50-445 AND 50-446 FLUX MAPPING SEAL TABLE RE31RAINTS SDAR: CP-85-40 (SUPPLEMENTAL REPORT)
Gentlemen:
Gentlemen:
On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a                               ,
On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a deficiency regarding the, adequacy of restraints (provided for the flux mapping l
deficiency regarding the, adequacy of restraints (provided for the flux mapping                         l system) under seismic loads which we deemed reportable under the provisions of 10CTR50.55(e). This item w s subsequently identified by our letter, logged TXX-6435, dated May 13, 1987, as an item for which a final report had been issued but "the originally scheduled completion date for the implementation of                       j corrective actins has elapsed but t'ie implementation of those actions is                             ;
system) under seismic loads which we deemed reportable under the provisions of 10CTR50.55(e).
still in progress ." 1his report is submitted to status the implementation of corrective actichs.
This item w s subsequently identified by our letter, logged TXX-6435, dated May 13, 1987, as an item for which a final report had been issued but "the originally scheduled completion date for the implementation of j
I in our report TXX-4633, we advit ed the actual modifications for the flux                           i l                 Mapping System (fMS) would be completed no later than March 31, 1986.                         Unit 1 .
corrective actins has elapsed but t'ie implementation of those actions is still in progress."
l FMS modifications (for Equipment Tag No. TBX-ICELFM-01) are complete.                                 I Currently, Unit 2 modifications are scheduled for completion no later than May                         l 15, 1986 i
1his report is submitted to status the implementation of corrective actichs.
Supporting documentation will be available at the CPSES site for your                                 ;
I in our report TXX-4633, we advit ed the actual modifications for the flux i
inspectors review Mter May 15, 1998. No further reports are anticipated.
l Mapping System (fMS) would be completed no later than March 31, 1986.
Very truly yours,                     I Wh<f                 ,
Unit 1 l
W. G. ounsil                       .
FMS modifications (for Equipment Tag No. TBX-ICELFM-01) are complete.
I py.[_
I Currently, Unit 2 modifications are scheduled for completion no later than May l
                                                                                    .J   -
15, 1986 i
c -- s ..
Supporting documentation will be available at the CPSES site for your inspectors review Mter May 15, 1998.
Manager. Nuclear Lictysing           j CBC/ rih c     .tr. R. D. Martin, Region IV                                                                   !
No further reports are anticipated.
Hesident inspectors, CPSES (3) 8109100159 B70903                       @ North Dint Street LB 81 Dallas. Texas 75201
I Very truly yours, Wh<f W. G.
  'PDR     ADOCK 05000445                                                                                               i
ounsil I
[ ___ _ _ _ _ _ _ _ _ _       _                                                                                      l
py. [
.J y
c -- s Manager. Nuclear Lictysing j
CBC/ rih c
.tr. R. D. Martin, Region IV Hesident inspectors, CPSES (3) 8109100159 B70903
@ North Dint Street LB 81 Dallas. Texas 75201
'PDR ADOCK 05000445 i
[ ___ _ _ _ _ _ _ _ _ _
l


l O
O -@@ ku l
W -@@ h p'
h W
Of. CD *s h,
\\1 p' h, Of. CD *s tlJ o S.4,c
                      \1 ku
-I w gli to(C as a P ','
-      tlJ     %$      -
q.
o S .4,c       -I to w gli (C as a
A i
: q.              P ','
I i
.@
.i 1
i I
l I
i
                                                                        .il 1
1 l
I I
l l
1 I
                                                                        )
l 1
l 1
I
)
I
I
_ - _ _ _ - _ - - _ _ _ _ - -}}
_ - _ _ _ - _ - - _ _ _ _ - -}}

Latest revision as of 06:49, 2 December 2024

Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515
ML20238C500
Person / Time
Site: Comanche Peak  
Issue date: 09/03/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-40, TXX-6713, NUDOCS 8709100159
Download: ML20238C500 (1)


Text

-

1 M

s lllllll:' ':llllllll Log # TXX-6713 Tile # 10110

~"-

905.3

~~

Ref # 10CfR50.55(e)

TUELECTRIC wimam c. coune e,eptember 3, 1987 rm,a~c u m&m U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washingtor., D.C, 20555

SUBJECT:

C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES) l 00CPET NOS. 50-445 AND 50-446 FLUX MAPPING SEAL TABLE RE31RAINTS SDAR: CP-85-40 (SUPPLEMENTAL REPORT)

Gentlemen:

On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a deficiency regarding the, adequacy of restraints (provided for the flux mapping l

system) under seismic loads which we deemed reportable under the provisions of 10CTR50.55(e).

This item w s subsequently identified by our letter, logged TXX-6435, dated May 13, 1987, as an item for which a final report had been issued but "the originally scheduled completion date for the implementation of j

corrective actins has elapsed but t'ie implementation of those actions is still in progress."

1his report is submitted to status the implementation of corrective actichs.

I in our report TXX-4633, we advit ed the actual modifications for the flux i

l Mapping System (fMS) would be completed no later than March 31, 1986.

Unit 1 l

FMS modifications (for Equipment Tag No. TBX-ICELFM-01) are complete.

I Currently, Unit 2 modifications are scheduled for completion no later than May l

15, 1986 i

Supporting documentation will be available at the CPSES site for your inspectors review Mter May 15, 1998.

No further reports are anticipated.

I Very truly yours, Wh<f W. G.

ounsil I

py. [

.J y

c -- s Manager. Nuclear Lictysing j

CBC/ rih c

.tr. R. D. Martin, Region IV Hesident inspectors, CPSES (3) 8109100159 B70903

@ North Dint Street LB 81 Dallas. Texas 75201

'PDR ADOCK 05000445 i

[ ___ _ _ _ _ _ _ _ _ _

l

O -@@ ku l

h W

\\1 p' h, Of. CD *s tlJ o S.4,c

-I w gli to(C as a P ','

q.

A i

I i

.i 1

l I

l 1

I

)

I

_ - _ _ _ - _ - - _ _ _ _ - -