TXX-6713, Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:- | ||
1 M | 1 M | ||
s | s lllllll:' ':llllllll Log # TXX-6713 Tile # 10110 | ||
~"- | |||
905.3 | |||
~~ | |||
905.3 Ref # 10CfR50.55(e) | Ref # 10CfR50.55(e) | ||
TUELECTRIC wimam c. coune e,eptember 3, 1987 rm,a~c u m&m U. S. Nuclear Regulatory Commission Attn: | |||
Document Control Desk Washingtor., D.C, 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES) | C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES) l 00CPET NOS. 50-445 AND 50-446 FLUX MAPPING SEAL TABLE RE31RAINTS SDAR: CP-85-40 (SUPPLEMENTAL REPORT) | ||
Gentlemen: | Gentlemen: | ||
On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a | On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a deficiency regarding the, adequacy of restraints (provided for the flux mapping l | ||
deficiency regarding the, adequacy of restraints (provided for the flux mapping | system) under seismic loads which we deemed reportable under the provisions of 10CTR50.55(e). | ||
still in progress ." 1his report is submitted to status the implementation of corrective actichs. | This item w s subsequently identified by our letter, logged TXX-6435, dated May 13, 1987, as an item for which a final report had been issued but "the originally scheduled completion date for the implementation of j | ||
I in our report TXX-4633, we advit ed the actual modifications for the flux | corrective actins has elapsed but t'ie implementation of those actions is still in progress." | ||
1his report is submitted to status the implementation of corrective actichs. | |||
Supporting documentation will be available at the CPSES site for your | I in our report TXX-4633, we advit ed the actual modifications for the flux i | ||
inspectors review Mter May 15, 1998. No further reports are anticipated. | l Mapping System (fMS) would be completed no later than March 31, 1986. | ||
Very truly yours, | Unit 1 l | ||
W. G. ounsil | FMS modifications (for Equipment Tag No. TBX-ICELFM-01) are complete. | ||
I Currently, Unit 2 modifications are scheduled for completion no later than May l | |||
15, 1986 i | |||
Supporting documentation will be available at the CPSES site for your inspectors review Mter May 15, 1998. | |||
Manager. Nuclear Lictysing | No further reports are anticipated. | ||
Hesident inspectors, CPSES (3) 8109100159 B70903 | I Very truly yours, Wh<f W. G. | ||
ounsil I | |||
[ ___ _ _ _ _ _ _ _ _ _ | py. [ | ||
.J y | |||
c -- s Manager. Nuclear Lictysing j | |||
CBC/ rih c | |||
.tr. R. D. Martin, Region IV Hesident inspectors, CPSES (3) 8109100159 B70903 | |||
@ North Dint Street LB 81 Dallas. Texas 75201 | |||
'PDR ADOCK 05000445 i | |||
[ ___ _ _ _ _ _ _ _ _ _ | |||
l | |||
O -@@ ku l | |||
h W | |||
Of. CD *s | \\1 p' h, Of. CD *s tlJ o S.4,c | ||
-I w gli to(C as a P ',' | |||
q. | |||
o S .4,c | A i | ||
I i | |||
.i 1 | |||
i I | l I | ||
i | |||
l 1 | l 1 | ||
I | |||
) | |||
I | I | ||
_ - _ _ _ - _ - - _ _ _ _ - -}} | _ - _ _ _ - _ - - _ _ _ _ - -}} | ||
Latest revision as of 06:49, 2 December 2024
| ML20238C500 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/03/1987 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-85-40, TXX-6713, NUDOCS 8709100159 | |
| Download: ML20238C500 (1) | |
Text
-
1 M
s lllllll:' ':llllllll Log # TXX-6713 Tile # 10110
~"-
905.3
~~
Ref # 10CfR50.55(e)
TUELECTRIC wimam c. coune e,eptember 3, 1987 rm,a~c u m&m U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washingtor., D.C, 20555
SUBJECT:
C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES) l 00CPET NOS. 50-445 AND 50-446 FLUX MAPPING SEAL TABLE RE31RAINTS SDAR: CP-85-40 (SUPPLEMENTAL REPORT)
Gentlemen:
On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a deficiency regarding the, adequacy of restraints (provided for the flux mapping l
system) under seismic loads which we deemed reportable under the provisions of 10CTR50.55(e).
This item w s subsequently identified by our letter, logged TXX-6435, dated May 13, 1987, as an item for which a final report had been issued but "the originally scheduled completion date for the implementation of j
corrective actins has elapsed but t'ie implementation of those actions is still in progress."
1his report is submitted to status the implementation of corrective actichs.
I in our report TXX-4633, we advit ed the actual modifications for the flux i
l Mapping System (fMS) would be completed no later than March 31, 1986.
Unit 1 l
FMS modifications (for Equipment Tag No. TBX-ICELFM-01) are complete.
I Currently, Unit 2 modifications are scheduled for completion no later than May l
15, 1986 i
Supporting documentation will be available at the CPSES site for your inspectors review Mter May 15, 1998.
No further reports are anticipated.
I Very truly yours, Wh<f W. G.
ounsil I
py. [
.J y
c -- s Manager. Nuclear Lictysing j
CBC/ rih c
.tr. R. D. Martin, Region IV Hesident inspectors, CPSES (3) 8109100159 B70903
@ North Dint Street LB 81 Dallas. Texas 75201
'PDR ADOCK 05000445 i
[ ___ _ _ _ _ _ _ _ _ _
l
O -@@ ku l
h W
\\1 p' h, Of. CD *s tlJ o S.4,c
-I w gli to(C as a P ','
q.
A i
I i
.i 1
l I
l 1
I
)
I
_ - _ _ _ - _ - - _ _ _ _ - -