ML20245A486: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:__
{{#Wiki_filter:__
          -
1
    .
-
                                                                                        1
.
  .  .
.
                                                                                        q
.
        In Reply Refer To:                           APR f 71999
q
        Docket:   50-267/89-05
In Reply Refer To:
                                                                                        )
APR f 71999
                                                                                        l
Docket:
        Public Service Company of Colorado                                              {
50-267/89-05
        ATTN: Robert O. Williams, Jr., Senior                                            j
)
                  Vice President, Nuclear Operations                                    1
        P.O. Box 840
        Denver, Colorado 80201-0840
        Gentlemen:
        This refers to the inspection conducted by Messrs. R. E. Ireland and R. V. Azua
        of this office during the period March 6-10, 1989, onsite and March 13-17, 1989,
        in-office of activities authorized by NRC Operating License DPR-34 for the Fort
        St. Vrain Nuclear Generating Station, and to the discussion of our findings      i
        with members of your staff at the conclusion of the inspection.
        Areas examined during the inspection included the surveillance program,
        surveillance procedures and records, allegation followup, and defueling
        preparations. Within these areas, the inspection consisted of selective          i
        examination of procedures and representative records, interviews with            '
        personnel, and observations by the NRC inspectors. The inspection findings are
        documented in the enclosed inspection report.
        Within the scope of this inspection, no violations of deviations were
        identified.
        We have also examined actions you have taken with regard to previously
        identified inspection findings. The status of these items is identified in
        paragraph 2.0 of the enclosed report.
        Should you have any questions concerning this inspection, we will be pleased to
        discuss them with you.
                                                    Sincerely,
                                                    8.kU M a
                                                    L. J. Callan, Director
                                                    Division of Reactor Projects
        Enclosure:    (see next page)
                                                                              g
        RIV:TPS*          C:TPS*            AC*          D:DRS*          D:DRP P
        RVAzua;1w        WCSeidle          RWise        JLMilboan      LJCallan
            / /89          / /89            / /89        / /89        fg//y/89
l
l
        *previously concurred
Public Service Company of Colorado
                                          ~
{
(                Q42gggg$$8             7
ATTN: Robert O. Williams, Jr., Senior
                a                                                                   \
j
                                                                                    >
Vice President, Nuclear Operations
1
P.O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Ireland and R. V. Azua
of this office during the period March 6-10, 1989, onsite and March 13-17, 1989,
in-office of activities authorized by NRC Operating License DPR-34 for the Fort
St. Vrain Nuclear Generating Station, and to the discussion of our findings
i
with members of your staff at the conclusion of the inspection.
Areas examined during the inspection included the surveillance program,
surveillance procedures and records, allegation followup, and defueling
preparations. Within these areas, the inspection consisted of selective
i
examination of procedures and representative records, interviews with
'
personnel, and observations by the NRC inspectors. The inspection findings are
documented in the enclosed inspection report.
Within the scope of this inspection, no violations of deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2.0 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8.kU M a
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
(see next page)
g
RIV:TPS*
C:TPS*
AC*
D:DRS*
D:DRP P
RVAzua;1w
WCSeidle
RWise
JLMilboan
LJCallan
/ /89
/ /89
/ /89
/ /89
fg//y/89
l
*previously concurred
Q42gggg$$8
~
7
(
\\
a
>


        -_                                               --                                                             ..
-_
                                                            -
--
          ..
..
      .                       .
-
..
.
.
  -
.
                                            Public Service Company of Colorado                     -2-
.
-
Public Service Company of Colorado
-2-
I
Enclosure:
I
I
                                            Enclosure:                                                                      I
Appendix - NRC Inspection Report
                                          Appendix - NRC Inspection Report
50-267/89-05
                                                            50-267/89-05
cc w/ enclosure:
                                          cc w/ enclosure:
Fort St. Vrain. Nuclear Station
                                            Fort St. Vrain. Nuclear Station
ATTN:
                                          ATTN:                 C. Fuller, Manager, . Nuclear
C. Fuller, Manager, . Nuclear
                                                                    Production Division
Production Division
                                            16805 WCR 196
16805 WCR 196
                                            Platteville, Colorado 80651
Platteville, Colorado 80651
                                            Fort St. Vrain Nuclear Station
Fort St. Vrain Nuclear Station
                                          ATTN:                 P. Tomlinson, Manager
ATTN:
                                                                    Quality Assurance Division
P. Tomlinson, Manager
                                            16805 WCR 191
Quality Assurance Division
                                          Platteville, Colorado 80651
16805 WCR 191
                                          Colorado Public Utilities Commission
Platteville, Colorado 80651
                                          ATTN: Ralph Teague, P.E.
Colorado Public Utilities Commission
                                            1580 Logan Street OL1
ATTN: Ralph Teague, P.E.
                                          Denver, Colorado 80203
1580 Logan Street OL1
                                          Colorado Radiation Control Program Director
Denver, Colorado 80203
                                          bcc w/ enclosure: bec to DMB (IE01)
Colorado Radiation Control Program Director
                                          bec distrib. by RIV:
bcc w/ enclosure: bec to DMB (IE01)
                                          *RRI                                                 *R. D. Martin, RA
bec distrib. by RIV:
                                          *Section Chief (DPP/B)                               * Project Engineer, DRP/B
*RRI
                                          *RPB-DRSS                                             Lisa Shea, RM/ALF
*R. D. Martin, RA
                                          * MIS System                                         *RSTS Operator
*Section Chief (DPP/B)
                                          *K. Heitner, NRR Project Manager (MS:                     13-0-18)
* Project Engineer, DRP/B
                                          *RIV File                                           *DRS
*RPB-DRSS
                                          *DRP                                                 G. F. Sanborn, E0
Lisa Shea, RM/ALF
                                            R. Wise, AC                                         *R. V. Azua
* MIS System
                                            *W.               C. Seidle
*RSTS Operator
                                          *w/766                                                                             ;
*K. Heitner, NRR Project Manager (MS:
                                                                                                                            4
13-0-18)
                                                                                                                              i
*RIV File
, - _       - _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ - - .                   _ _ - _ . _
*DRS
*DRP
G. F. Sanborn, E0
R. Wise, AC
*R. V. Azua
*W. C. Seidle
*w/766
;
4
i
, - _
- _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ - - .
_ _ - _ . _
}}
}}

Latest revision as of 03:31, 2 December 2024

Forwards Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations or Deviations Noted
ML20245A486
Person / Time
Site: Fort Saint Vrain 
Issue date: 04/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245A488 List:
References
NUDOCS 8904250233
Download: ML20245A486 (2)


See also: IR 05000267/1989005

Text

__

1

-

.

.

.

q

In Reply Refer To:

APR f 71999

Docket:

50-267/89-05

)

l

Public Service Company of Colorado

{

ATTN: Robert O. Williams, Jr., Senior

j

Vice President, Nuclear Operations

1

P.O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Ireland and R. V. Azua

of this office during the period March 6-10, 1989, onsite and March 13-17, 1989,

in-office of activities authorized by NRC Operating License DPR-34 for the Fort

St. Vrain Nuclear Generating Station, and to the discussion of our findings

i

with members of your staff at the conclusion of the inspection.

Areas examined during the inspection included the surveillance program,

surveillance procedures and records, allegation followup, and defueling

preparations. Within these areas, the inspection consisted of selective

i

examination of procedures and representative records, interviews with

'

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of this inspection, no violations of deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2.0 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8.kU M a

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

(see next page)

g

RIV:TPS*

C:TPS*

AC*

D:DRS*

D:DRP P

RVAzua;1w

WCSeidle

RWise

JLMilboan

LJCallan

/ /89

/ /89

/ /89

/ /89

fg//y/89

l

  • previously concurred

Q42gggg$$8

~

7

(

\\

a

>

-_

--

..

-

..

.

.

.

-

Public Service Company of Colorado

-2-

I

Enclosure:

I

Appendix - NRC Inspection Report

50-267/89-05

cc w/ enclosure:

Fort St. Vrain. Nuclear Station

ATTN:

C. Fuller, Manager, . Nuclear

Production Division

16805 WCR 196

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

ATTN:

P. Tomlinson, Manager

Quality Assurance Division

16805 WCR 191

Platteville, Colorado 80651

Colorado Public Utilities Commission

ATTN: Ralph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

Colorado Radiation Control Program Director

bcc w/ enclosure: bec to DMB (IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • Section Chief (DPP/B)
  • Project Engineer, DRP/B
  • RPB-DRSS

Lisa Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • K. Heitner, NRR Project Manager (MS:

13-0-18)

  • RIV File
  • DRS
  • DRP

G. F. Sanborn, E0

R. Wise, AC

  • R. V. Azua
  • W. C. Seidle
  • w/766

4

i

, - _

- _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ - - .

_ _ - _ . _