Text
__
1
-
.
.
.
q
In Reply Refer To:
APR f 71999
Docket:
50-267/89-05
)
l
Public Service Company of Colorado
{
ATTN: Robert O. Williams, Jr., Senior
j
Vice President, Nuclear Operations
1
P.O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Ireland and R. V. Azua
of this office during the period March 6-10, 1989, onsite and March 13-17, 1989,
in-office of activities authorized by NRC Operating License DPR-34 for the Fort
St. Vrain Nuclear Generating Station, and to the discussion of our findings
i
with members of your staff at the conclusion of the inspection.
Areas examined during the inspection included the surveillance program,
surveillance procedures and records, allegation followup, and defueling
preparations. Within these areas, the inspection consisted of selective
i
examination of procedures and representative records, interviews with
'
personnel, and observations by the NRC inspectors. The inspection findings are
documented in the enclosed inspection report.
Within the scope of this inspection, no violations of deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2.0 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8.kU M a
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
(see next page)
g
RIV:TPS*
C:TPS*
AC*
D:DRS*
D:DRP P
RVAzua;1w
WCSeidle
RWise
JLMilboan
LJCallan
/ /89
/ /89
/ /89
/ /89
fg//y/89
l
- previously concurred
Q42gggg$$8
~
7
(
\\
a
>
-_
--
..
-
..
.
.
.
-
Public Service Company of Colorado
-2-
I
Enclosure:
I
Appendix - NRC Inspection Report
50-267/89-05
cc w/ enclosure:
Fort St. Vrain. Nuclear Station
ATTN:
C. Fuller, Manager, . Nuclear
Production Division
16805 WCR 196
Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
ATTN:
P. Tomlinson, Manager
Quality Assurance Division
16805 WCR 191
Platteville, Colorado 80651
Colorado Public Utilities Commission
ATTN: Ralph Teague, P.E.
1580 Logan Street OL1
Denver, Colorado 80203
Colorado Radiation Control Program Director
bcc w/ enclosure: bec to DMB (IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- Section Chief (DPP/B)
- Project Engineer, DRP/B
- RPB-DRSS
Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager (MS:
13-0-18)
- RIV File
- DRS
- DRP
G. F. Sanborn, E0
R. Wise, AC
- R. V. Azua
- W. C. Seidle
- w/766
4
i
, - _
- _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ - - .
_ _ - _ . _