ML20245A486

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations or Deviations Noted
ML20245A486
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245A488 List:
References
NUDOCS 8904250233
Download: ML20245A486 (2)


See also: IR 05000267/1989005

Text

__

-

.

1

. .

q

In Reply Refer To: APR f 71999

Docket: 50-267/89-05

)

l

Public Service Company of Colorado {

ATTN: Robert O. Williams, Jr., Senior j

Vice President, Nuclear Operations 1

P.O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Ireland and R. V. Azua

of this office during the period March 6-10, 1989, onsite and March 13-17, 1989,

in-office of activities authorized by NRC Operating License DPR-34 for the Fort

St. Vrain Nuclear Generating Station, and to the discussion of our findings i

with members of your staff at the conclusion of the inspection.

Areas examined during the inspection included the surveillance program,

surveillance procedures and records, allegation followup, and defueling

preparations. Within these areas, the inspection consisted of selective i

examination of procedures and representative records, interviews with '

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of this inspection, no violations of deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2.0 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8.kU M a

L. J. Callan, Director

Division of Reactor Projects

Enclosure: (see next page)

g

RIV:TPS* C:TPS* AC* D:DRS* D:DRP P

RVAzua;1w WCSeidle RWise JLMilboan LJCallan

/ /89 / /89 / /89 / /89 fg//y/89

l

  • previously concurred

~

( Q42gggg$$8 7

a \

>

-_ -- ..

-

..

. .

.

-

Public Service Company of Colorado -2-

I

Enclosure: I

Appendix - NRC Inspection Report

50-267/89-05

cc w/ enclosure:

Fort St. Vrain. Nuclear Station

ATTN: C. Fuller, Manager, . Nuclear

Production Division

16805 WCR 196

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

ATTN: P. Tomlinson, Manager

Quality Assurance Division

16805 WCR 191

Platteville, Colorado 80651

Colorado Public Utilities Commission

ATTN: Ralph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

Colorado Radiation Control Program Director

bcc w/ enclosure: bec to DMB (IE01)

bec distrib. by RIV:

  • RRI *R. D. Martin, RA
  • Section Chief (DPP/B) * Project Engineer, DRP/B
  • RPB-DRSS Lisa Shea, RM/ALF
  • MIS System *RSTS Operator
  • K. Heitner, NRR Project Manager (MS: 13-0-18)
  • RIV File *DRS
  • DRP G. F. Sanborn, E0

R. Wise, AC *R. V. Azua

  • W. C. Seidle
  • w/766  ;

4

i

, - _ - _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ - - . _ _ - _ . _