ML20246B239: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:-     _                     _
{{#Wiki_filter:-
                                                                                                      - _ _ _
_
                                                                                                        r
_
                                                                                                              7
- _ _ _
            *f'.                                                                                 :       fyUl
r
h                                                                                                   ,
7
                                                      JUN 2 71929
*f'.
fyUl
:
h
,
JUN 2 71929
l
l
              Docket Nos. 50-348, 50-364
Docket Nos. 50-348, 50-364
              License Nos. NPF-2, NPF-8
License Nos. NPF-2, NPF-8
              Alabama Power Company
Alabama Power Company
              ATTN:   W. G. Hariston, III
ATTN:
                      Senior Vice President
W. G. Hariston, III
                      Nuclear Operations
Senior Vice President
              40 Inverriess Center Parkway
Nuclear Operations
              P. O. Box 1295
40 Inverriess Center Parkway
              Birmingham, AL 35101
P. O. Box 1295
              Gentlemen:
Birmingham, AL 35101
              SUBJECT:     NRC INSPECTION REPORT NOS. 50-348/89-12 AND 50-364/89-12
Gentlemen:
              This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT:
              G. F. Maxwell on May 11 - June 10, 1989. The inspection included a review of
NRC INSPECTION REPORT NOS. 50-348/89-12 AND 50-364/89-12
              activities authorized for your Farley facility.           At the conclusion of the
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
              inspection, the findings were discussed with those members of your staff
G. F. Maxwell on May 11 - June 10, 1989. The inspection included a review of
              identified in the enclosed inspection report.
activities authorized for your Farley facility.
              Areas examined during the inspection are identified in the report.           Within
At the conclusion of the
              these areas, the inspection consisted of selective examinations of procedures
inspection, the findings were discussed with those members of your staff
              and representative records, inter views with personnel, and observation of
identified in the enclosed inspection report.
              activities in progress.
Areas examined during the inspection are identified in the report.
              Within the scope of the inspection, no violation or deviations were identified.
Within
              The enclosed Inspection Report documents an oral commitment (see paragraph 9)
these areas, the inspection consisted of selective examinations of procedures
              made by a licensee representative and discussed in the exit interview.           If
and representative records, inter views with personnel, and observation of
              your understanding of this commitment differs from the report statements,
activities in progress.
              please inform this office promptly.                                                               -
Within the scope of the inspection, no violation or deviations were identified.
              In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,                         4
The enclosed Inspection Report documents an oral commitment (see paragraph 9)
              Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
made by a licensee representative and discussed in the exit interview.
              will be placed in the NRC Public Document Room.
If
              Should you have any questions concerning this letter, please contact us.                             l
your understanding of this commitment differs from the report statements,
                                                            Sincerely.
please inform this office promptly.
                                                                              M
-
                                                            ORIG 1tJ Al 5'ON                                     l
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
                                                            OAVID g. VERREW                                       {
4
                                                            David M. Verelli, Chief
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                                            Reactor Piojects Brance 1
will be placed in the NRC Public Document Room.
                                                            Division of Reactor Projects
Should you have any questions concerning this letter, please contact us.
              Enclosure:     (See page 2)
l
              8907070
Sincerely.
              7       =253 cx890627
M
                              osooone                                                                             l
ORIG 1tJ Al 5'ON
                                    nc                                                               zgo,
l
_ _ - - _ -             --               - - - - - -                                                           J
OAVID g. VERREW
{
David M. Verelli, Chief
Reactor Piojects Brance 1
Division of Reactor Projects
Enclosure:
(See page 2)
8907070
7
=253 890627
cx osooone
l
nc
zgo,
_ _ - - _ -
--
- - - - - -
J


;                                                                               _ _ _ - - . _.
;
                                                                                              ___. _ _ _ _ _ _ _ _
_ _ _ - - .
_.
___.
_ _ _ _ _ _ _ _
l
<
.-
,
*
b
l-'
. Alabama Power Company.
2
JUN 2 71989
i
I
l
l
          <                    .-
Enclosure:
                                      ,
i
                              *
NRC' Inspection Report
    b
cc w/ enc 1:
l-'                            . Alabama Power Company.                    2 JUN 2 71989                          i
B. M. Guthrie, Executive Vice
                                                                                                                    I
President
                                                                                                                    l
R. P. Mcdonald, Executive Vice
                                  Enclosure:                                                                       i
President
                                NRC' Inspection Report
J. D. Woodard, Vice President
                                  cc w/ enc 1:
Nuclear Generation
                                  B. M. Guthrie, Executive Vice
D. Morey, General Manager
                                    President
Farley Nuclear Plant
                                  R. P. Mcdonald, Executive Vice
J. W. McGowan, Manager, Safety Audit
                                    President
and Engineering Review
                                  J. D. Woodard, Vice President
'
                                    Nuclear Generation
S. Fulmer, Supervisor, Safety Audit
                                  D. Morey, General Manager
and Engineering Review
                                      Farley Nuclear Plant
State of Alabama
                                  J. W. McGowan, Manager, Safety Audit
bec w/ enc 1:
                              '
NRC Resident Inspector
                                    and Engineering Review
Document Control Desk
                                  S. Fulmer, Supervisor, Safety Audit
RII
                                    and Engineering Review
RII
                                  State of Alabama
jiC*Df
                                  bec w/ enc 1:
%^
                                  NRC Resident Inspector
LModenos
                                  Document Control Desk
FCan rell
                                  RII                           RII
06/AJ/89
                                        jiC*Df                           %^
06/jp89
                                  LModenos                     FCan rell
-___-_____ _______ _ __ _
                                  06/AJ/89                     06/jp89
_ _ _ _ _ _ _ .
    -___-_____ _______ _ __ _                   _ _ _ _ _ _ _ . . _ _ _ _
. _ _ _
_
}}
}}

Latest revision as of 00:26, 2 December 2024

Forwards Insp Repts 50-348/89-12 & 50-364/89-12 on 890511-0610.No Violations or Deviations Noted
ML20246B239
Person / Time
Site: Farley  
Issue date: 06/27/1989
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20246B241 List:
References
NUDOCS 8907070253
Download: ML20246B239 (2)


See also: IR 05000348/1989012

Text

-

_

_

- _ _ _

r

7

  • f'.

fyUl

h

,

JUN 2 71929

l

Docket Nos. 50-348, 50-364

License Nos. NPF-2, NPF-8

Alabama Power Company

ATTN:

W. G. Hariston, III

Senior Vice President

Nuclear Operations

40 Inverriess Center Parkway

P. O. Box 1295

Birmingham, AL 35101

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-348/89-12 AND 50-364/89-12

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Maxwell on May 11 - June 10, 1989. The inspection included a review of

activities authorized for your Farley facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, inter views with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violation or deviations were identified.

The enclosed Inspection Report documents an oral commitment (see paragraph 9)

made by a licensee representative and discussed in the exit interview.

If

your understanding of this commitment differs from the report statements,

please inform this office promptly.

-

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

4

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

l

Sincerely.

M

ORIG 1tJ Al 5'ON

l

OAVID g. VERREW

{

David M. Verelli, Chief

Reactor Piojects Brance 1

Division of Reactor Projects

Enclosure:

(See page 2)

8907070

7

=253 890627

cx osooone

l

nc

zgo,

_ _ - - _ -

--

- - - - - -

J

_ _ _ - - .

_.

___.

_ _ _ _ _ _ _ _

l

<

.-

,

b

l-'

. Alabama Power Company.

2

JUN 2 71989

i

I

l

Enclosure:

i

NRC' Inspection Report

cc w/ enc 1:

B. M. Guthrie, Executive Vice

President

R. P. Mcdonald, Executive Vice

President

J. D. Woodard, Vice President

Nuclear Generation

D. Morey, General Manager

Farley Nuclear Plant

J. W. McGowan, Manager, Safety Audit

and Engineering Review

'

S. Fulmer, Supervisor, Safety Audit

and Engineering Review

State of Alabama

bec w/ enc 1:

NRC Resident Inspector

Document Control Desk

RII

RII

jiC*Df

%^

LModenos

FCan rell

06/AJ/89

06/jp89

-___-_____ _______ _ __ _

_ _ _ _ _ _ _ .

. _ _ _

_