ML20247C928: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
{{#Wiki_filter:-
{{#Wiki_filter:-
.a
.a
                      ..g
..g
                                        .s         .1
. s.1
      - q.y September 6, 1989 Georgia Power Company LATTN: Mr. . W.: G. Hairston, .III Senior Vice: President-y                                                            . Nuclear 0perations:
- q.y September 6, 1989 Georgia Power Company LATTN: Mr.. W.: G. Hairston,.III Senior Vice: President-
40; Inverness Center Parkway
. Nuclear 0perations:
                                      .P. 0.; Box 1295-
y 40; Inverness Center Parkway
* Birmingham, AL                           35201' Gentlemen:.
.P. 0.; Box 1295-Birmingham, AL 35201' Gentlemen:.


==SUBJECT:==
==SUBJECT:==
EXAMINATION . REPORT' . 50-321/0L-89-01' On June 12.                       16, 1989, the;NRC administered examinations to employees of-your
EXAMINATION. REPORT'. 50-321/0L-89-01' On June 12.
                                        . company who had; applied for licenses. to operate your E. I. Hatch facility. ' At
16, 1989, the;NRC administered examinations to employees of-your
                                        ' the' conclusion of :the . examination, the examination questions and.~ preliminary findings were discussed with those members of your . staff identified in the 1      enclosed report.
. company who had; applied for licenses. to operate your E. I. Hatch facility. ' At
Your attentionJis invited to tw'o specific areas of concern. -As detailed.in
' the' conclusion of :the. examination, the examination questions and.~ preliminary findings were discussed with those members of your. staff identified in the enclosed report.
                                            'the .Examinatic,n. Report . your pre-examination review was ineffective in -
1 Your attentionJis invited to tw'o specific areas of concern. -As detailed.in
'the.Examinatic,n. Report. your pre-examination review was ineffective in -
ensuring site-specific examination validity and, the operator generic weak-
ensuring site-specific examination validity and, the operator generic weak-
                                            .nesses that were noted during the operating. examinations. Further management
.nesses that were noted during the operating. examinations.
                                            . attention istneeded to eliminate'these concerns, r
Further management
. attention istneeded to eliminate'these concerns, r
In 'accordance with 10.CFR 2.790 of the Commission's regulations, a copy of
In 'accordance with 10.CFR 2.790 of the Commission's regulations, a copy of
                                            ' this letter and the enclosures will be pitced in the NRC Public Document Room.
' this letter and the enclosures will be pitced in the NRC Public Document Room.
Should you have any questions concerning this examination, please contact us.
Should you have any questions concerning this examination, please contact us.
Sincerely, i
i Sincerely, (original signed by T. A. Peebles)
(original signed by T. A. Peebles)
Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety
Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety


==Enclosures:==
==Enclosures:==
'1.. Report Details
' 2.
Examination (s) and Answer Key (s) (SR0/R0)
~
3.
Facility Comments
'4.
NRC Resolution of Comments 5.
Simulation Facility Report
- cc w/ enc 1 1:
(See page 2)
~
'8909140130 890906 PDR ADOCK 05000321 V
PDC f
kl y[
......m.
J


                                              '1.. Report Details
                                            ' 2.            Examination (s) and Answer Key (s) (SR0/R0)
                                                                              ~
: 3.            Facility Comments
                                              '4.            NRC Resolution of Comments
: 5.          Simulation Facility Report
                                            - cc w/ enc 1 1:                        (See page 2)
                                    ~
                                                    '8909140130 890906 PDR                ADOCK 05000321 V                                              PDC                                                          f
. . . . . .    ......m.  . . . . . . . . . . . .              .    .. .        .. .      . . . . . . . . . . . .-  -
kl y[ J
                        '' Georgia Power Company                  2            September 6, 1989
[
[
cc w/ enc 1 1:
'' Georgia Power Company 2
September 6, 1989 cc w/ enc 1 1:
State of Georgia cc w/ enc 1s 1 and 5:
State of Georgia cc w/ enc 1s 1 and 5:
H. C. Nix, Site Generh1 Manager cc.w/encls 1.-2, 3, 4, and 5:
H. C. Nix, Site Generh1 Manager cc.w/encls 1.-2, 3, 4, and 5:
Line 65: Line 71:
Document Control Desk bec wIencls 1 and 5:
Document Control Desk bec wIencls 1 and 5:
Operator Licensing Branch, DLPQ:NRR i
Operator Licensing Branch, DLPQ:NRR i
l
(
(                                                                                                  i i
l i
i 1
i i
1 i
1 i
RII                 RI           RII           R11 GHopp r:btm          CCa           "SMde M/ man n     les 8/$F/89              8/>bto
RII RI RII R11 CCa "SMde M/ man n les GHopp r:btm 8/>bto
                                                    /89       8/g/89         /g/89 I
/89 8/g/89
u____m._.___       ._}}
/g/89 8/$F/89 I
u____m._.___
._}}

Latest revision as of 21:15, 1 December 2024

Forwards Exam Rept 50-321/OL-89-01 Administered on 890612-16.Concerns Raised Re pre-exam Review Ineffective in Ensuring site-specific Exam Validity & Operator Generic Weaknesses
ML20247C928
Person / Time
Site: Hatch 
Issue date: 09/06/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20247C933 List:
References
NUDOCS 8909140130
Download: ML20247C928 (2)


Text

-

.a

..g

. s.1

- q.y September 6, 1989 Georgia Power Company LATTN: Mr.. W.: G. Hairston,.III Senior Vice: President-

. Nuclear 0perations:

y 40; Inverness Center Parkway

.P. 0.; Box 1295-Birmingham, AL 35201' Gentlemen:.

SUBJECT:

EXAMINATION. REPORT'. 50-321/0L-89-01' On June 12.

16, 1989, the;NRC administered examinations to employees of-your

. company who had; applied for licenses. to operate your E. I. Hatch facility. ' At

' the' conclusion of :the. examination, the examination questions and.~ preliminary findings were discussed with those members of your. staff identified in the enclosed report.

1 Your attentionJis invited to tw'o specific areas of concern. -As detailed.in

'the.Examinatic,n. Report. your pre-examination review was ineffective in -

ensuring site-specific examination validity and, the operator generic weak-

.nesses that were noted during the operating. examinations.

Further management

. attention istneeded to eliminate'these concerns, r

In 'accordance with 10.CFR 2.790 of the Commission's regulations, a copy of

' this letter and the enclosures will be pitced in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

i Sincerely, (original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Enclosures:

'1.. Report Details

' 2.

Examination (s) and Answer Key (s) (SR0/R0)

~

3.

Facility Comments

'4.

NRC Resolution of Comments 5.

Simulation Facility Report

- cc w/ enc 1 1:

(See page 2)

~

'8909140130 890906 PDR ADOCK 05000321 V

PDC f

kl y[

......m.

J

[

Georgia Power Company 2

September 6, 1989 cc w/ enc 1 1:

State of Georgia cc w/ enc 1s 1 and 5:

H. C. Nix, Site Generh1 Manager cc.w/encls 1.-2, 3, 4, and 5:

C. Coggins, Manager of Training bec w/ enc 1 1:

L. Crocker, NRR K.~Brockman, DRP J. Menning, Hatch Senior Resident Inspector G. Hopper, DRS bec w/encls 1, 2,'3, 4, and 5:

Document Control Desk bec wIencls 1 and 5:

Operator Licensing Branch, DLPQ:NRR i

(

l i

i i

1 i

RII RI RII R11 CCa "SMde M/ man n les GHopp r:btm 8/>bto

/89 8/g/89

/g/89 8/$F/89 I

u____m._.___

._