ML20247G009: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,                                                                 .             _ _ _ - _ _ _ _ _ _
{{#Wiki_filter:,
  ,.I     i
.
    ,}..   -.
_ _ _ - _ _ _ _ _ _
                                                          SEP 131989
,.I i
o       '
,}..
                  Docket.Ho.f50-266-
-.
?                 Docket No.-50-301
SEP 131989
                . Wisconsin Electric ~ Power Company
o
                  ATTN: Mr. C. W. Fay.
'
                                    .
Docket.Ho.f50-266-
                              Vice President
?
                              Nuclear Power
Docket No.-50-301
                .231 West Michigan Street'-~P379
. Wisconsin Electric ~ Power Company
                -Milwaukee, WI 53201
ATTN: Mr. C. W. Fay.
                  Gentlemen:
.
                .This refers to the'special safety, ins)ection conducted by Mr. Rolf A. Westberg
Vice President
                  of this office on August 28 to Septem)er'1, 1989, of activities regarding.the.
Nuclear Power
                : implementation of Generic Letter 85-06 relative to ATWS mitigating systems'
.231 West Michigan Street'-~P379
                  at Point Beach Nuclear Plant, Units 1 and 2, authorized by HRC Operating
-Milwaukee, WI 53201
                  Licenses No.~ DPR-24 and No. DPR-27.and to the discussion of our findings with
Gentlemen:
                -Mr. James ~Zach at the conclusion of the inspection.
.This refers to the'special safety, ins)ection conducted by Mr. Rolf A. Westberg
                  The enclosed copy of our inspection report identifies areas examined during
of this office on August 28 to Septem)er'1, 1989, of activities regarding.the.
                  the inspection. Within these' areas,;the inspection consisted of a selective
: implementation of Generic Letter 85-06 relative to ATWS mitigating systems'
                  examination of: procedures and representative records, observations, and
at Point Beach Nuclear Plant, Units 1 and 2, authorized by HRC Operating
                -interviews with personnel.
Licenses No.~ DPR-24 and No. DPR-27.and to the discussion of our findings with
      .           No violations of NRC requirements were identifiad.during the course of this
-Mr. James ~Zach at the conclusion of the inspection.
                  inspection.
The enclosed copy of our inspection report identifies areas examined during
                'In accordance with 10 CFR 2.790 of the. Commission's regulations, a copy of
the inspection. Within these' areas,;the inspection consisted of a selective
                .this-letter and the enclosed inspection report will be placed in the NRC
examination of: procedures and representative records, observations, and
                  Public Document Room.
-interviews with personnel.
                  We.will. gladly discuss any questions you have concerning this inspection.
.
                                                          Sincerely.
No violations of NRC requirements were identifiad.during the course of this
                                                          ORIGINAL SIGNED BY F. J. JABLONSKI (FOR)
inspection.
                                  >
'In accordance with 10 CFR 2.790 of the. Commission's regulations, a copy of
                                                          R. W. Cooper, II, Chief
.this-letter and the enclosed inspection report will be placed in the NRC
                                                          Engineering Branch
Public Document Room.
                  Enclosure: Inspection Reports
We.will. gladly discuss any questions you have concerning this inspection.
                    No. 50-266/89026(DRS);
Sincerely.
                    No. 50-301/89025(DRS)
ORIGINAL SIGNED BY F. J. JABLONSKI (FOR)
                  See Attached Distribution
R. W. Cooper, II, Chief
                O-
>
                  985
Engineering Branch
                  RIII               R         RIII           RII
Enclosure:
                    p                   .         yy                   h%                                       1
Inspection Reports
                              g /.jk  De a ette Gardner       Co eF                                     g\
No. 50-266/89026(DRS);
                  09/13/89           09   /89 09/G/89         09/g/89                                       )
No. 50-301/89025(DRS)
                    e9o9180341 89 13                               t,                                     - 0 i
See Attached Distribution
                          DR ADOCK0500gg6                                                                  f
O-
__               .
985
                      - -   __
RIII
R
RIII
RII
p
/.jk
yy
h%
1
.
g
De a ette
Gardner
Co eF
g\\
09/13/89
09
/89
09/G/89
09/g/89
)
e9o9180341 89
13
0
i
-
ADOCK0500gg6
t,
DR
f
__
.
- -
__


-             _ _ _ _ . ._ _                                                         _ . _ _ - _                   -_-                                               -_ - __-_____               . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -
-
    ..:                         -
_ _ _ _ . ._ _
            .
_ . _ _ - _
                                      - -
-_-
                      ,
-_
                                                  Wisconsin Electric Power Company                                                               2
- __-_____
                                                                                                                                                                                          SEP 131989
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -
                                                  Distribution
..:
                                                  cc w/ enclosure:
-
                                                  J. J. Zach, Plant Manager
- -
                                                  DCD/DCB (RIDS)
.
                                                  Licensing Fee Management Branch
,
                                                  Resident Inspector, RIII
Wisconsin Electric Power Company
                                                  Virgil Kanable.. Chief
2
                                                          Boiler Section
SEP 131989
                                                  Charles Thompson, Chairman
Distribution
                                                          Wisconsin Public Service
cc w/ enclosure:
                                                          Commission
J. J. Zach, Plant Manager
                                                  R. I. Braund (SLO),
DCD/DCB (RIDS)
                                                          WI Div. of Emergency Government
Licensing Fee Management Branch
                                                  Lawrence J. McDonnell, Chief
Resident Inspector, RIII
                                                          Radiation Protection Section
Virgil Kanable.. Chief
                                                          WI Department of Health and
Boiler Section
                                                                  Social Services, Division
Charles Thompson, Chairman
                                                                  of Health
Wisconsin Public Service
                                                                                                                                                                                                                                            i
Commission
                                                                                                                                                                                                                                              I
R. I. Braund (SLO),
                                                                                                                                                                                                                                              I
WI Div. of Emergency Government
                                                                                                                                                                                                                                              i
Lawrence J. McDonnell, Chief
_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _               ___   . _ _ _ _                                   _ __]
Radiation Protection Section
WI Department of Health and
Social Services, Division
of Health
i
I
I
i
_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _
. _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _
___
. _ _ _ _
_
__]
}}
}}

Latest revision as of 20:42, 1 December 2024

Forwards Safety Insp Repts 50-266/89-26 & 50-301/89-25 on 890828-0901.No Violations Noted
ML20247G009
Person / Time
Site: Point Beach  
Issue date: 09/13/1989
From: Cooper R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20247G013 List:
References
GL-85-06, GL-85-6, NUDOCS 8909180341
Download: ML20247G009 (2)


See also: IR 05000266/1989026

Text

,

.

_ _ _ - _ _ _ _ _ _

,.I i

,}..

-.

SEP 131989

o

'

Docket.Ho.f50-266-

?

Docket No.-50-301

. Wisconsin Electric ~ Power Company

ATTN: Mr. C. W. Fay.

.

Vice President

Nuclear Power

.231 West Michigan Street'-~P379

-Milwaukee, WI 53201

Gentlemen:

.This refers to the'special safety, ins)ection conducted by Mr. Rolf A. Westberg

of this office on August 28 to Septem)er'1, 1989, of activities regarding.the.

implementation of Generic Letter 85-06 relative to ATWS mitigating systems'

at Point Beach Nuclear Plant, Units 1 and 2, authorized by HRC Operating

Licenses No.~ DPR-24 and No. DPR-27.and to the discussion of our findings with

-Mr. James ~Zach at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these' areas,;the inspection consisted of a selective

examination of: procedures and representative records, observations, and

-interviews with personnel.

.

No violations of NRC requirements were identifiad.during the course of this

inspection.

'In accordance with 10 CFR 2.790 of the. Commission's regulations, a copy of

.this-letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We.will. gladly discuss any questions you have concerning this inspection.

Sincerely.

ORIGINAL SIGNED BY F. J. JABLONSKI (FOR)

R. W. Cooper, II, Chief

>

Engineering Branch

Enclosure:

Inspection Reports

No. 50-266/89026(DRS);

No. 50-301/89025(DRS)

See Attached Distribution

O-

985

RIII

R

RIII

RII

p

/.jk

yy

h%

1

.

g

De a ette

Gardner

Co eF

g\\

09/13/89

09

/89

09/G/89

09/g/89

)

e9o9180341 89

13

0

i

-

ADOCK0500gg6

t,

DR

f

__

.

- -

__

-

_ _ _ _ . ._ _

_ . _ _ - _

-_-

-_

- __-_____

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -

..:

-

- -

.

,

Wisconsin Electric Power Company

2

SEP 131989

Distribution

cc w/ enclosure:

J. J. Zach, Plant Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Virgil Kanable.. Chief

Boiler Section

Charles Thompson, Chairman

Wisconsin Public Service

Commission

R. I. Braund (SLO),

WI Div. of Emergency Government

Lawrence J. McDonnell, Chief

Radiation Protection Section

WI Department of Health and

Social Services, Division

of Health

i

I

I

i

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _

. _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _

___

. _ _ _ _

_

__]