PRELIMINARY NOTIFICATION                    Iv ' 3 * # ' O ^~               .
~
                                                                                                  - .                Jul,'           '976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO-76-121 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
PRELIMINARY NOTIFICATION Jul,'
Facility:       Pilgrim Unit 1 Boston Edison Company Subj ect:     UNEXPECTED PICKET LINES ESTABLISHED AT SITE Local Union No. 721 of the Construction and General Laborers, AFL-CIO, established a picket line at the Pilgrim Nuclear Power Station at 6.'.5 a.m. on July 16, disrupting access by station personnel.
'976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO-76-121 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.
The issues precipitating the unexpected union action focus on dismissal by the utility of a radwaste subcontractor, and assignment of the radwaste contract to a new company.                                                                                                         -
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
Discussions were initiated between plant management, the plant l               operator's union (Utility Workers of America, Local 369), and Local No. 721. The plant's operating union personnel did not cross the I
Facility:
picket line at the 8:00 a.m. shift change. The site security force f                 is not affected and has been augmented.
Pilgrim Unit 1 Boston Edison Company Subj ect:
UNEXPECTED PICKET LINES ESTABLISHED AT SITE Local Union No. 721 of the Construction and General Laborers, AFL-CIO, established a picket line at the Pilgrim Nuclear Power Station at 6.'.5 a.m. on July 16, disrupting access by station personnel.
The issues precipitating the unexpected union action focus on dismissal by the utility of a radwaste subcontractor, and assignment of the radwaste contract to a new company.
Discussions were initiated between plant management, the plant l
operator's union (Utility Workers of America, Local 369), and Local I
The plant's operating union personnel did not cross the No. 721.
picket line at the 8:00 a.m. shift change.
The site security force f
is not affected and has been augmented.
The plant was operating at 75% power with night shift personnel still
The plant was operating at 75% power with night shift personnel still
                    -in the plant as of 10:00 a.m. , July 16.
-in the plant as of 10:00 a.m., July 16.
An NRC:I inspector, already on site, will continue to monitor events.
An NRC:I inspector, already on site, will continue to monitor events.
  #                Media interest is expected because of high local interest. The                                                                                   f Commonwealth of Massachusetts has been informed. A press release is                                                                               !
Media interest is expected because of high local interest. The f
not planned.
Commonwealth of Massachusetts has been informed. A press release is not planned.
:                  Region I, NRC, Philadelphia, Pa. received notification of this occurrence t       ,
Region I, NRC, Philadelphia, Pa. received notification of this occurrence t
                    'y telephone from the NRC:I inspector on site at 9:15 a.m.                                                     The informa-tion is current as,of 10:00 a.m. on July 16.
'y telephone from the NRC:I inspector on site at 9:15 a.m.
C       '
The informa-o tion is current as,of 10:00 a.m. on July 16.
C


==Contact:==
==Contact:==
FADreher,         IE x27261                           GWRoy,   IE x27261             DThompson, IE x27541 I
: FADreher, IE x27261
: GWRoy, IE x27261 DThompson, IE x27541 I
Distribution:
Distribution:
Chairman Rowden                                                   Commissioner Mason                 S. J. Chilk, SECY Commissioner Gilinsky                                             C. C. Kammerer, CA                 G. F. Murphy, JCAE j       ,          Commissioner Kennedy L. V. Gossick, EDO                                               E. Volgenau, OIE                   J. A. Harris, PA B. C. Rusche, NRR                                                 H. K. Shapar, ELD                   T. J. McTiernan, AIA i          K. R. Chapman, NMSS                                           ,  R. G. Ryan, OSP                                     .
Chairman Rowden Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE j
,                  Transmitted: PBldg/// O                                       H St//'ffi NMBB/8 Ud                     Luge "             ;
Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, AIA K. R. Chapman, NMSS R. G. Ryan, OSP i
PRELIMINARY NOTIFICATION                                                                           I D R M ),         -
Transmitted: PBldg/// O H St//'ffi NMBB/8 Ud Luge "
9806230334 PDR I&E       760716                                                                                                            _
PRELIMINARY NOTIFICATION I
i PNO-76-121           pop                                                                                 ,
D R M ),
                                                                                                                                                            .. _. .,}}
9806230334 760716 i
PDR I&E PNO-76-121 pop
.. _..,}}

Latest revision as of 14:04, 30 November 2024

PNO-76-121:on 760716,unexpected Picket Lines Established at Site.Issues Precipitating Unexpected Union Action Focus on Dismissal by Util of Radwaste Subcontractor & Assignment of Radwaste Contract to New Company
ML20249B583
Person / Time
Site: Pilgrim
Issue date: 07/16/1976
From: Dreher F, Roy G, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-121, NUDOCS 9806230334
Download: ML20249B583 (1)


Text

hf M dck m s1CL (QA s

J Iv '

3 * # ' O ^~

~

PRELIMINARY NOTIFICATION Jul,'

'976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO-76-121 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

Facility:

Pilgrim Unit 1 Boston Edison Company Subj ect:

UNEXPECTED PICKET LINES ESTABLISHED AT SITE Local Union No. 721 of the Construction and General Laborers, AFL-CIO, established a picket line at the Pilgrim Nuclear Power Station at 6.'.5 a.m. on July 16, disrupting access by station personnel.

The issues precipitating the unexpected union action focus on dismissal by the utility of a radwaste subcontractor, and assignment of the radwaste contract to a new company.

Discussions were initiated between plant management, the plant l

operator's union (Utility Workers of America, Local 369), and Local I

The plant's operating union personnel did not cross the No. 721.

picket line at the 8:00 a.m. shift change.

The site security force f

is not affected and has been augmented.

The plant was operating at 75% power with night shift personnel still

-in the plant as of 10:00 a.m., July 16.

An NRC:I inspector, already on site, will continue to monitor events.

Media interest is expected because of high local interest. The f

Commonwealth of Massachusetts has been informed. A press release is not planned.

Region I, NRC, Philadelphia, Pa. received notification of this occurrence t

'y telephone from the NRC:I inspector on site at 9:15 a.m.

The informa-o tion is current as,of 10:00 a.m. on July 16.

C

Contact:

FADreher, IE x27261
GWRoy, IE x27261 DThompson, IE x27541 I

Distribution:

Chairman Rowden Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE j

Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, AIA K. R. Chapman, NMSS R. G. Ryan, OSP i

Transmitted: PBldg/// O H St//'ffi NMBB/8 Ud Luge "

PRELIMINARY NOTIFICATION I

D R M ),

9806230334 760716 i

PDR I&E PNO-76-121 pop

.. _..,