ML21118A026: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 04/06/21 To: 00935 US NRC                                                             PAGE      1 DOCUMENT CNTRL DESK 11555 ROCKVILLE PIKE ROCKVILLE, MD 20852 Media: 8 1 / 2 X 11 Number Cnt  Issue DTC     Doc . Serial Number             Page Rev Copies Lvl   Date   Sec Status TMTRM  TRM VOL I                             125     1   IR 04/01/21       AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing .
{{#Wiki_filter:To: 00935 US NRC DOCUMENT CNTRL DESK 11555 ROCKVILLE PIKE ROCKVILLE, MD 20852 Media: 8 1/ 2 X 11 DETROIT EDISON -
Detroit Edison EF2, C/ O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. ( 734 ) 586-4338 OR (734) 586 - 4061 for questions or concerns .
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 04/06/21 PAGE 1
Ref: u21352
DTC TMTRM Doc. Serial Number Number Cnt Issue Page Rev Copies Lvl Date Sec Status TRM VOL I 125 1
IR 04/01/21 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/ O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734 ) 586-4338 OR (734) 586 - 4061 for questions or concerns.
Ref: u21352  


LICENSING DOCUMENT TRANSMITTAL
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 125 dated 04/01/2021 Immediately, upon reeeipt of the item(s) below, please insert and/or remove the pages indicated.
* FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 125 dated 04/01/2021 Immediately, upon reeeipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 124 has been inserted prior to inserting these pages.
Destroy the removed pages. Be sure that Revision 124 has been inserted prior to inserting these
SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 124 02/01/2021 Title Pa.,Q;e Rev 125 04/01/2021 Immediately following List of Effective Pages List of Effective Pages  
                                                                                                            \_
\\_
pages.                                   '
Title Page LEP-1 through LEP-4 Rev 124 LEP-1 through LEP-4 Rev 125 04/01/2021 02/01/2021 3.3 Instrumentation TRM 3.3-6 Rev 31 10/99 TRM 3.3-6 Rev 125 04/21 TRM 3.3-13a Rev 67 04/04 TRM 3.3-13aRev 125 04/21 TRM 3.3-27 Rev 31 10/99 TRM 3.3-27 Rev 125 04/21 TRM 3.3-29 Rev 76 08/05 TRM 3.3-29 Rev 125 04/21 TRM 3.3-33 Rev 31 10/99 TRM 3.3-33 Rev 125 04/21 TRM 3.3-48 Rev 31 10/99 TRM 3.3-48 Rev 125 04/21 3.4 Reactor Coolant TRM 3.4-2 Rev 31 10/99 TRM 3.4-2 Rev 125 04/21 System (RCS)
SECTION                     REMOVE and DESTROY                         INSERT In Front of TRM Manual     Title Page Rev 124 02/01/2021             Title Pa.,Q;e Rev 125 04/01/2021 Immediately following       List of Effective Pages                   List of Effective Pages Title Page                 LEP-1 through LEP-4 Rev 124               LEP-1 through LEP-4 Rev 125 04/01/2021 02/01/2021 3.3 Instrumentation         TRM 3.3-6 Rev 31 10/99                     TRM 3.3-6 Rev 125 04/21 TRM 3 .3-13a Rev 67 04/04                 TRM 3.3-13aRev 125 04/21 TRM 3.3-27 Rev 31 10/99                   TRM 3.3-27 Rev 125 04/21 TRM 3.3-29 Rev 76 08/05                   TRM 3.3-29 Rev 125 04/21 TRM 3.3-33 Rev 31 10/99                   TRM 3.3-33 Rev 125 04/21 TRM 3.3-48 Rev 31 10/99                   TRM 3.3-48 Rev 125 04/21 3.4 Reactor Coolant         TRM 3.4-2 Rev 31 10/99                     TRM 3.4-2 Rev 125 04/21 System (RCS)               TRM 3.4-3 Rev 31 10/99                     TRM 3.4-3 Rev 125 04/21 TRM 3.4-10 Rev 31 10/99                   TRM 3.4-10 Rev 125 04/21 3.6 Containment Systems     TRM 3.6-1 Rev 60 01/03                     TRM 3.6-1 Rev 125 04/21 TRM 3.6-28 Rev 31 10/99                   TRM 3.6-28 Rev 125 04/21 TRM 3.6-31 Rev 31 10/99                   TRM 3.6-31 Rev 125 04/21 3.8 Electrical Power       TRM 3.8-5 Rev 31 10/99                     TRM 3.8-5 Rev 125 04/21 Systems                     TRM 3.8-6 Rev 50 09/01                     TRM 3.8-6 Rev 125 04/21 TRM 3.8-7 Rev 114 09/18                   TRM 3.8-7 Rev 125 04/21 TRM 3.8-8 Rev 50 09/01                     TRM 3.8-8 Rev 125 04/21 TRM 3.8-9 Rev 50 09/01                     TRM 3.8-9 Rev 125 04/21 TRM 3.8-10 Rev 50 09/01                   TRM 3.8-10 Rev 125 04/21 TRM 3.8-14 Rev 46 06/01                   TRM 3.8-14 Rev 125 04/21 TRM 3.8-17 Rev 43 03/01                   TRM 3.8-17 Rev 125 04/21 B3.8 Electrical Power Systems                     TRM B3.8.6-1 Rev 43 03/01                 TRM B3.8.6-1 Rev 125 04/21 Note: The changes above reflect those justified and described in LCR#s 20-038-TRM and 20-048-'{RM.
TRM 3.4-3 Rev 31 10/99 TRM 3.4-3 Rev 125 04/21 TRM 3.4-10 Rev 31 10/99 TRM 3.4-10 Rev 125 04/21 3.6 Containment Systems TRM 3.6-1 Rev 60 01/03 TRM 3.6-1 Rev 125 04/21 TRM 3.6-28 Rev 31 10/99 TRM 3.6-28 Rev 125 04/21 TRM 3.6-31 Rev 31 10/99 TRM 3.6-31 Rev 125 04/21 3.8 Electrical Power TRM 3.8-5 Rev 31 10/99 TRM 3.8-5 Rev 125 04/21 Systems TRM 3.8-6 Rev 50 09/01 TRM 3.8-6 Rev 125 04/21 TRM 3.8-7 Rev 114 09/18 TRM 3.8-7 Rev 125 04/21 TRM 3.8-8 Rev 50 09/01 TRM 3.8-8 Rev 125 04/21 TRM 3.8-9 Rev 50 09/01 TRM 3.8-9 Rev 125 04/21 TRM 3.8-10 Rev 50 09/01 TRM 3.8-10 Rev 125 04/21 TRM 3.8-14 Rev 46 06/01 TRM 3.8-14 Rev 125 04/21 TRM 3.8-17 Rev 43 03/01 TRM 3.8-17 Rev 125 04/21 B3.8 Electrical Power Systems TRM B3.8.6-1 Rev 43 03/01 TRM B3.8.6-1 Rev 125 04/21 Note: The changes above reflect those justified and described in LCR#s 20-038-TRM and 20-048-'{RM.
END
END  


Fermi 2 Technical Requirements Manual/
DTC: TMTRM I File: 1754 Date 04/01/2021 ARMS - INFORMATION Fermi 2 Technical Requirements Manual/  
                                                              'Volume I
'Volume I
(
(
DTE Electric ARMS - INFORMATION DTC: TMTRM      I File: 1754          I DSN: TRM VOL I I Rev: 125 Date 04/01/2021                        I Recipient
DTE Electric I DSN: TRM VOL I I Rev: 125 I Recipient  


FERMI 2   - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OB' EFFECTIVE PAGES Page         Revision                     Page           Revision TRM i       Revision 106                 TRM 3.3-30   Revision 31 TRM ii     Revision 107                 TRM 3.3-31   Revision 31 TRM iii     Revision 105                 TRM 3.3-32   Revision 31 TRM iv     Revision 106                 TRM 3.3-33   Revision 125 TRM V       Revision 107                 TRM 3.3-34   Revision 31 TRM vi     Revision 31                 TRM 3.3-34a   Revision 106 TRM 1.0-a   Ravision 31                 TRM 3.3-35   Revision 60 TRM 1.0-1   Revision 31                 TRM 3.3-36   Revision 104 TRM 2.0-1   Revision: 31                 TRM 3.3-37   Revision 72 TRM 3.0-a   Revision 31                 TRM 3.3-38   Revision 31 TRM 3.0-1   Revision 63                 TRM 3.3-39   Revision 31 TRM 3.0-2   Revision 72                 TRM 3.3-40   Revision 56 TRM 3.0-3   Revision 54                 TRM 3.3-41   Revision 56 TRM 3.0-4   Revision 72                 TRM 3.3-42   Revision 45 TRM 3.1-a   Revision 31                 TRM 3.3-43   Revision 62 TRM 3.1-1   Revision 31                 TRM 3.3-44   Revision 72 TRM 3.2-1   Revision 31                 TRM 3.3-45   Revision 31 TRM 3.3-a   Revision 31                 TRM 3.3-46   Revision 31 TRM 3.3-b   Revision 31                 TRM 3.3-47     Revision 31 TRM 3.3-o   Revision 106                 TRM,3.3-48     Revision 125 TRM 3.3-d   Revision 31                 TRM 3.3-49     Revision 31 TRM 3.3-1   Revision 120                 TRM 3.4-a     Revision 31 TRM 3.3-2   Revision 116                 TRM 3.4-1     Revision 36 TRM 3.3-3   Revision 31                 TRM 3.4-la   Revision 71 TRM 3.3-4   Rev;ision 31                 TRM 3.4-lb   Revision 71 TRM 3.3-5   Revision 31                 TRM 3.4-2     Revision 125 TRM 3.3-6   Revision 125                 TRM 3.4-3     Revision 125 TRM 3.3-7   Revision 31                 TRM 3.4-4     Revision 31 TRM 3.3-8   Revision 106                 TRM 3.4-5     Revision 31 TRM 3.3-9   Revision 31                 TRM 3.4-6     Revision 31 TRM 3.3-10 Revision 106                 TRM 3.4-7     Revision 31 TRM 3.3-11 Revision 31                 TRM 3.4-8     Revision 31 TRM 3.3-12 Revision 67                 TRM 3.4-9     Revision 31 TRM 3.3-13 Revision 74                 TRM 3.4-10     Revision 125 TRM 3.3-13a Revision 125                 TRM 3.5-1     Revision 31 TRM 3.3-14 Revision 67                 TRM 3.6-a     Revision 70 TRM 3.3-15 Revision 31                 TRM 3.6-1     Revision 125 TRM 3.3-16 Revision 31                 TRM 3.6-2     Revision 67 TRM 3.3-17 Revision 31                 TRM 3.6-3     Revision 123 TRM 3.3-18 Revision 100                 TRM 3.6-4     Revision 123 TRM 3.3-19 Revision 31                 TRM 3.6-5     Revision 123 TRM 3.3-20 Revision 31                 TRM 3.6-6     Revision 123 TRM 3.3-21 Revision 124                 TRM 3.6-7     Revision 123 TRM 3.3-22 Revision 124                 TRM 3.6-8     Revision 123 TRM 3.3-23 Revision 124                 TRM 3.6-9     Revision 123 TRM 3.3-24 Revision 31                 TRM 3.6-10     Revision 123 TRM 3.3-25 Ravision 31                 TRM 3.6-11     Revision 123 TRM 3.3-26 Revision 31                 TRM 3.6-12     Revision 123 TRM 3.3-27 Revision 125                 TRM 3.6-13     Revision 123 TRM 3.3-28 Ravision 76                 TRM 3.6-14     Revision 123 TRM 3.3-29 Revision 125                 TRM 3.6-14a   RQvision 123 TRM Vol. I                           LEP-1             REV 125   04/01/2021
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OB' EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 106 TRM 3.3-30 Revision 31 TRM ii Revision 107 TRM 3.3-31 Revision 31 TRM iii Revision 105 TRM 3.3-32 Revision 31 TRM iv Revision 106 TRM 3.3-33 Revision 125 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Ravision 31 TRM 3.3-35 Revision 60 TRM 1.0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision: 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 72 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-o Revision 106 TRM,3.3-48 Revision 125 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1 Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Rev;ision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 31 TRM 3.4-2 Revision 125 TRM 3.3-6 Revision 125 TRM 3.4-3 Revision 125 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-13 Revision 74 TRM 3.4-10 Revision 125 TRM 3.3-13a Revision 125 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 125 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Ravision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 125 TRM 3.6-13 Revision 123 TRM 3.3-28 Ravision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 125 TRM 3.6-14a RQvision 123 TRM Vol. I LEP-1 REV 125 04/01/2021  


FERMI 2   - TECHNICAL REQUIREMENTS MANUAL VOL I
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-15 Revision 123 TRM 3.8-9 Revision 125 TRM 3.6-16 Revision 123 TRM 3.8-10 Revision 125 TRM 3.6-17 Revision 123 TRM 3.8-11 Revision 123 TRM 3.6-18 Revision 123 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 125 TRM 3.6-21 Revision 123 TRM 3.8-15 Ravi."sion 31 TRM 3.6-22 Revision 123 TRM 3.8-16 Revision 31 I
* Page TRM TRM TRM 3.6-15 3.6-16 3.6-17 Revision Revision Revision Revision 123 123 123 LIST OF EFFECTIVE PAGES Page TRM TRM TRM 3.8-9 3.8-10 3.8-11 Revision Revision Revision Revision 125 125 123 TRM 3.6-18 Revision   123                 TRM 3.8-12     Revision   31 TRM 3.6-19 Revision   123                 TRM 3.8-13     Revision   61 TRM 3.6-20 Revision   123                 TRM 3.8-14     Revision   125 TRM 3.6-21 Revision   123                 TRM 3.8-15     Ravi."sion 31 TRM 3.6-22 Revision   123I                TRM 3.8-16     Revision   31 TRM 3.6-23 Revision   123                 TRM 3.8-17     Revision   125
TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 125  
  'TRM 3.6-24 Revision   123                 TRM 3.8-18     Revision   33 TRM 3.6-25 Revision   31                   TRM 3.9-a       Revision   31 TRM 3.6-26 Revision   31                   TRM 3.9-1       Revision   31 TRM 3.6-27 Revision   31                   TRM 3.9-2       Revision   65 TRM 3.6-28 Revision   125                 TRM 3.9-3       Revision   80 TRM 3.6-29 Revision   31                   TRM 3.9-4       Revision   88 TRM 3.6-30 Revision   31                   TRM 3.9-5       Revision   31 TRM 3.6-31 Revision   125                 TRM 3.10-1     Revision   31 TRM 3.6-32 Revision   70                   TRM 3.11-a     Revision   31 TRM 3.6-33 Revision   31                   TRM 3.11-1     Revision   31 TRM 3.6-34 Revision   31                   TRM 3.12-a     Revision   31 TRM 3.6-35 Revision   31                   TRM 3.12-1     Revision   75 TRM 3.7-a   Revision   107                 TRM 3.12-2     Revision   31 TRM 3.7-1   Revision   60                   TRM 3.12-3     Revision   31 TRM 3.7-2   Revision   107                 TRM 3.12-4     Revision   102 TRM 3.7-3   Revision   70                   TRM 3.12-5     Revision   108 TRM 3.7-4   Revision   73                   TRM 3.12-6     Revision   53 TRM 3.7-5   Revision   31                   TRM 3.12-7     Revision   31 TRM 3.7-6   Revision   31                   TRM 3.12-8     Revision   112 TRM 3.7-7   Revision   31                   TRM 3.12-9     Revision   40 TRM 3.7-8   R4:1vision 31                   TRM 3.12-10     Revision   31 TRM 3.7-9   Revision   31                   TRM 3.12-11     Revision   49 TRM 3.7-10 Revision   44               '  TRM 3.12-12     Revision   31 TRM 3. 7-11 Revision   31                   TRM 3.12-13     Revision   75 TRM 3.7-12 Revision   72                   TRM 3.12-14     Revision   31 TRM 3.7-13 Revision   31                   TRM 3.12-15     R&1vision 31 I
'TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 125 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 125 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revision 53 TRM 3.7-5 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 R4:1vision 31 TRM 3.12-10 Revision 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3. 7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 R&1vision 31 I
TRM 3.7-14 Revision   121                 TRM 3.12-16     Revision   75 TRM 3.7-15 Revision   115                 TRM 3.12-17     Revision   31 TRM 3.7-16 Revision   115                 TRM 3.12-18     Revision   75 TRM 3.7-17 Revision   115                 TRM 3.12-19     Revision   31 TRM 3.7-18 Revision   120                       3.12-20     Revision   75 TRM 3.7-19 Revision   31
TRM 3.7-14 Revision 121 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120  
                                                'fRM TRM 3.12-21     Revision   31 TRM 3.7-20 Revision   79                   TRM 3.12-22     Revision   31 TRM 3.8-a   Revision   31                   TRM 3.12-23     Revision   31 TRM 3.8-1   Revision   31                   TRM 3.12-24     Revision   31 TRM 3.8-2   Revision   31                   TRM 3.12-25     Revision   31 TRM 3.8-3   Revision   96                   TRM 3 .12-26   Revision   75 TRM 3.8-4   Revision   113                 TRM 3.12-27     Revision   31 TRM 3.8-5   Revision   125                 TRM 3.12-28     Revision   31 TRM 3.8-6   Revision   125                 TRM 3.12-29     Revision   78 TRM 3.8-7   Revision   125                 TRM 3.12-30     Revision   31 TRM 3.8-8   Revision   125                 TRM 4.0-1       Revision   31 TRM Vol. I                             LEP-2               REV 125   04/01/2021
'fRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 113 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 125 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 125 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 125 TRM 3.12-30 Revision 31 TRM 3.8-8 Revision 125 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 125 04/01/2021
_J
_J  


FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I  
                                                                    ~
~
LIST OF EFFECTIVE PAGES Paga             Revision                   Paga                 Revision TRM 5.0-a       Revision 105               TRM B3.4.6-1       Revision 31 TRM 5.0-1       Revision 119               TRM B3.4.7 Revision 31 TRM 5.0-2       Revision 105               TRM B3.5-1         Revision 31 TRM B1.0-1     Revision 31                 TRM B3.6.1-1       Revision 31 TRM B2.0-1     Revision 31                 TRM B3.6.2-1       Revision 67 TRM B3.0-1     Revision 63                 TRM B3.6.3-1       Revision 87 TRM B3.0-2     Revision 63                 TRM B3.6.4-1       Revision 31 TRM B3.0-2a     Revision 72                 TRM B3.6.5-1       Revision 31 TRM B3.0-2b     Revision 72                 TRM B3.6.6-1       Revision 70 TRM B3.0-20     Revision 72                 TRM B3.6.7-1       Revision 31 TRM B3.0-3     Revision 31                 TRM B3.6.8-1       Revision 31 TRM B3.0-4     Revision 31                 TRM B3.7.1-1       Revision 31 TRM B3.0-5     Revision 54                 TRM B3.7.2-1       Revision 107 TRM B3.0-6     Revision 72                 TRM B3.7.3-1       Revision 73 TRM B3.0-7     Revision 72                 TRM B3.7.4-1       Revision 31 TRM B3.1-1     Revision 31                 TRM B3.7.4-2       Revision 31 TRM B3.2-1     Revision 31                 TRM B3.7.5-1       Revision 31 TRM B3.3.1-1   Revision 31                 TRM B3.7.6-1       Revision 31 TRM B3.3.1-2   Revision 31                 TRM B3*. 7. 7-1   Revision 99 TRM B3.3.2-1   Revision 31                 TRM B3.7.8-1       Revision 31 TRM B3.3.2-2   Revision 31                 TRM B3.7.9-1       Revision 79 TRM B3.3.3-1   Revision 67                 TRM B3.8.1-1       Revision 31 TRM B3.3.4-1   Revision 31                 TRM B3.8.2-1       Revision 31 TRM B3.3.4-2   Revision 84                 TRM B3.8.3-1       Revision 96 TRM B3.3.5-1   Revision 31                 TRM B3.8.4-1       Revision 31 TRM B3.3.5-2   Revision 31                 TRM B3.8.5-1       Revision 31 TRM B3.3.6-1   Revision 116               TRM B3.8.6-1       Revision 125 TRM B3.3.6-2   Revision 31                 TRM B3.9.1-1       Revision 31 TRM B3.3.6-3   Revision 31                 TRM B3.9.2-1       Revision 65 TRM B3.3.6-4   Revision 31                 TRM B3.9.3-1       Revision 31 TRM B3.3.6-5   Revision 76                 TRM B3.9.4-1       Revision 31 TRM B3.3.6-6   Revision 76                 TRM B3.10-1       Revision 31 TRM B3. 3 ._7-1 Revision 31                 TRM B3 .11.1-1 Revision 31 TRM B3.3.7-2   Revision 31                 TRM B3.12.1-1 Revision 31 TRM B3.3.7-3   Revision 106               TRM B3.12.2-1 Revision 112 TRM B3.3.8-1   Revision 31                 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1   Revision 31                 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1   Revision 56                 TRM B3.+2.5-1 Revision 31 TRM B3.3.11-1   Revision 45                 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1   Revision 62                 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1   Revision 31                 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1   Revision 31 TRM B3.4.1-1   Revision 31 TRM B3.4.1-2   Revision 71 TRM B3.4.1-3   Revision 71 TRM B3.4.1-4   Revision 71 TRM B3.4.1-5     Revision 71 TRM B3.4.2-1   Revision 31 TRM B3.4.3-1   Revision 31 TRM B3.4.4-1   Revision 31 TRM B3.4.5-1     Revision 31 TRM Vol. I                             LEP-3                 REV 125   04/01/2021
LIST OF EFFECTIVE PAGES Paga Revision Paga Revision TRM 5.0-a Revision 105 TRM B3.4.6-1 Revision 31 TRM 5.0-1 Revision 119 TRM B3.4.7-1
- Revision 31 TRM 5.0-2 Revision 105 TRM B3.5-1 Revision 31 TRM B1.0-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.2-1 Revision 67 TRM B3.0-1 Revision 63 TRM B3.6.3-1 Revision 87 TRM B3.0-2 Revision 63 TRM B3.6.4-1 Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.5-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.6-1 Revision 70 TRM B3.0-20 Revision 72 TRM B3.6.7-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.2-1 Revision 107 TRM B3.0-6 Revision 72 TRM B3.7.3-1 Revision 73 TRM B3.0-7 Revision 72 TRM B3.7.4-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3*. 7. 7-1 Revision 99 TRM B3.3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.3-1 Revision 67 TRM B3.8.1-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.4-2 Revision 84 TRM B3.8.3-1 Revision 96 TRM B3.3.5-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.6-1 Revision 116 TRM B3.8.6-1 Revision 125 TRM B3.3.6-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-4 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.9.4-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.10-1 Revision 31 TRM B3. 3._7-1 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-3 Revision 106 TRM B3.12.2-1 Revision 112 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.+2.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 125 04/01/2021  


FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I
FERMI 2 -
* CORE OPERATING LIMITS REPORT COLR 21, Revision 0 Paga LIST OF EFFECTIVE PAGES Revision Notation Paga 1                         0 2                         0 3                         0 4                         Q 5                         0 6                         0 7                         0 8                         0 9                         0 10                       ,o 11                       0 12                       0 13                       0 14                       0 15                       0 16                       0 17                       0 18                       0 19                       0 20                       0 21                       0 22                       0 23                       0 24                       0 25                       0 26                       0 27                       0 28                       0 29                       0 30                       0 31                       0
TECHNICAL REQUIREMENTS MANUAL VOL I CORE OPERATING LIMITS REPORT COLR 21, Revision 0 LIST OF EFFECTIVE PAGES Paga Revision Notation Paga 1
* TRM Vol. I                           LEP-4           REV 125 04/01/2021
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TRM Vol. I 0
0 0
Q 0
0 0
0 0
,o 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
LEP-4 REV 125 04/01/2021  


Control Rod Block Instrumentation TR 3.3.2.1
Control Rod Block Instrumentation TR 3.3.2.1 SURVEILLANCE REQUIREMENTS (continued)
* SURVEILLANCE REQUIREMENTS (continued)
TRSR 3. 3. 2. 1. 5 SURVEILLANCE
SURVEILLANCE                              FREQUENCY TRSR 3 . 3 . 2 . 1. 5 -------------------NOTES-------------------
-------------------NOTES-------------------
: 1. For Function 1, not required to be performed until 12 hours after IRMs on Range 2 or below.
: 1. For Function 1, not required to be performed until 12 hours after IRMs on Range 2 or below.
: 2. For Function 2, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
: 2.
For Function 2, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
: 3. Neutron detectors are excluded.
: 3. Neutron detectors are excluded.
Perform CHANNEL CALIBRATION.                 184 days TRSR 3.3.2.1.6       Perform CHANNEL FUNCTIONAL TEST.             24 months
Perform CHANNEL CALIBRATION.
* TRSR 3
TRSR 3.3.2.1.6 Perform CHANNEL FUNCTIONAL TEST.
TRSR 3
* 3
* 3
* 2
* 2
* 1. 7 TRSR 3
* 1. 7 Perform CHANNEL CALIBRATION.
TRSR 3
* 3
* 3
* 2
* 2
* 1. 8 Perform CHANNEL CALIBRATION.
* 1. 8  
                        ------- -----------NOTE--------------------
------- -----------NOTE--------------------
Neutron detectors are excluded.
Neutron detectors are excluded.
24 months Perform CHANNEL CALIBRATION .                 24 months
Perform CHANNEL CALIBRATION.
* TRM Vol. I                                 TRM 3.3-6                     REV 125 04/21
TRM Vol. I TRM 3.3-6 FREQUENCY 184 days 24 months 24 months 24 months REV 125 04/21  


Accident Monitoring Instrumentation TR 3.3.3
Accident Monitoring Instrumentation TR 3.3.3 SURVEILLANCE REQUIREMENTS  
* SURVEILLANCE REQUIREMENTS
--------------------------------------NOTE--------------------------------------
  --------------------------------------NOTE--------------------------------------
These SRs apply to each Function in Table TR3.3.3-1.
These SRs apply to each Function in Table TR3.3.3-1.
SURVEILLANCE                              FREQUENCY TRSR 3.3.3.1     Perform CHANNEL CHECK.                       '31 days TRSR 3.3.3.2    -----------------NOTE----------------------
TRSR 3.3.3.1 TRSR 3.3.3.2 TRSR 3.3.3.3 TRSR 3.3.3.4 TRM Vol. I SURVEILLANCE Perform CHANNEL CHECK.
-----------------NOTE----------------------
Only applicable to Functions 1, 2, 3, 4, 5.a and 5.b.
Only applicable to Functions 1, 2, 3, 4, 5.a and 5.b.
Perform CHANNEL CALIBRATION.                   24 months TRSR 3.3.3.3    -----------------NOTES---------------------
Perform CHANNEL CALIBRATION.  
: 1. Only applicable to Functions 6 and 7 .
-----------------NOTES---------------------
: 2. Not required to be performed until 72 hours for one channel, and 7 days for the second channel after~ 15% RTP.
: 1.
Perform CHANNEL CALIBRATION.                   92 DAYS TRSR 3.3.3.4    -----------------NOTE----------------------
Only applicable to Functions 6 and 7.
: 2.
Not required to be performed until 72 hours for one channel, and 7 days for the second channel after~ 15% RTP.
Perform CHANNEL CALIBRATION.  
-----------------NOTE----------------------
Only applicable to Functions 5.c and 5.d.
Only applicable to Functions 5.c and 5.d.
Perform CHANNEL CALIBRATION.                   18 months
Perform CHANNEL CALIBRATION.
* TRM Vol. I                          TRM 3.3-13a                     REV 125 04/21
TRM 3.3-13a FREQUENCY
'31 days 24 months 92 DAYS 18 months REV 125 04/21  


Suppression Pool Water Temperature Instrumentation TR 3.3.6.4
Suppression Pool Water Temperature Instrumentation TR 3.3.6.4 ACTIONS (Continued)
* ACTIONS (Continued)
CONDITION B.
CONDITION                   REQUIRED ACTION            COMPLETION TIME B. Two or more             B.l       Restore at least      8 hours suppression pool water             seven temperature temperature                        instrumentation instrumentation                    channels to OPERABLE channels inoperable.              status .
Two or more B.l suppression pool water temperature instrumentation channels inoperable.
C. Required Action and     C.l       Perform OPERABILITY    Immediately
C.
      ' associated Completion             assessment on Time of Condition B               Technical not met.                           Specification LCO 3.6.2.1, Suppression Pool Average Temperature .
Required Action and C.l associated Completion Time of Condition B not met.
* SURVEILLANCE REQUIREMENTS TRSR 3.3.6.4.l SURVEILLANCE Perform CHANNEL CHECK.
SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIRED ACTION Restore at least seven temperature instrumentation channels to OPERABLE status.
FREQUENCY 24 hours TRSR 3.3.6.4.2   Perform CHANNEL FUNCTIONAL TEST.              31 days TRSR 3.3.6.4.3   Perform CHANNEL CALIBRATION. The water         24 months high temperature alarm setpoint is~ 105°F .
Perform OPERABILITY assessment on Technical Specification LCO 3.6.2.1, Suppression Pool Average Temperature.
* TRM Vol. I                            TRM 3.3-27                       REV 125 04/21
TRSR 3.3.6.4.l Perform CHANNEL CHECK.
TRSR 3.3.6.4.2 TRSR 3.3.6.4.3 TRM Vol. I Perform CHANNEL FUNCTIONAL TEST.
Perform CHANNEL CALIBRATION.
The water high temperature alarm setpoint is~ 105°F.
TRM 3.3-27 COMPLETION TIME 8 hours Immediately FREQUENCY 24 hours 31 days 24 months REV 125 04/21  


TWMS Narrow,Range Suppression Pool Water Level Instrumentation TR 3.3.6.5
TWMS Narrow,Range Suppression Pool Water Level Instrumentation TR 3.3.6.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.3.6.5.1 Perform CHANNEL CHECK.
* SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY TRSR 3.3.6.5.1   Perform CHANNEL CHECK.                       24 hours l
24 hours l
TRSR 3.3.6.5.2   Perform CHANNEL FUNCTIONAL TEST.             92 days TRSR 3.3.6.5.3   Perform CHANNEL CALIBRATION. The setpoints 24 months shall be:
TRSR 3.3.6.5.2 Perform CHANNEL FUNCTIONAL TEST.
: a. High water level< 14 ft. 8 inches; and
92 days TRSR 3.3.6.5.3 Perform CHANNEL CALIBRATION.
: b. Low water level> 14 ft. 4 inches .
The setpoints 24 months shall be:
TRM Vol. I
: a.
High water level< 14 ft. 8 inches; and
: b.
Low water level> 14 ft. 4 inches.
_/
_/
* TRM Vol. I                          TRM 3.3-29                     REV 125   04/21
TRM 3.3-29 REV 125 04/21  


Seismic Monitoring Instrumentation TR 3.3.7.2 SURVEILLANCE REQUIREMENTS
Seismic Monitoring Instrumentation TR 3.3.7.2 SURVEILLANCE REQUIREMENTS  
  --------------------------------------NOTE- -------------------------------------
--------------------------------------NOTE--------------------------------------
Refer to Table TR3.3.7.2-1 to determine which TRSRs apply for each Seismic Monitoring Instrumentation Function.
Refer to Table TR3.3.7.2-1 to determine which TRSRs apply for each Seismic Monitoring Instrumentation Function.
SURVEILLANCE                             FREQUENCY TRSR 3.3.7.2.1   -------------------NOTE--------------------
SURVEILLANCE TRSR 3.3.7.2.1  
-------------------NOTE--------------------
For Function l.b.l, CHANNEL CHECK does not include seismic trigger.
For Function l.b.l, CHANNEL CHECK does not include seismic trigger.
Perform CHANNEL CHECK.                       31 days
Perform CHANNEL CHECK.
TRSR 3.3.7.2.2 Perform CHANNEL FUNCTIONAL TEST.
TRSR 3.3.7.2.3 Perform CHANNEL CALIBRATION.
FREQUENCY 31 days 184 days 24 months
_)
_)
TRSR 3.3.7.2.2  Perform CHANNEL FUNCTIONAL TEST.              184 days 24 months TRSR 3.3.7.2.3  Perform CHANNEL CALIBRATION.
TRM Vol. I TRM 3.3-33 REV 125 04/21  
* TRM Vol. I                           TRM 3.3-33                     REV 125 04/21


Radiation Monitoring Instrumentation TR 3.3.14 ACTIONS (continued)
Radiation Monitoring Instrumentation TR 3.3.14 ACTIONS (continued)
CONDITION                   REQUIRED ACTION           COMPLETION TIME C. For Function 1.b, both   C.l     Implement the           Immediately required channels                  preplanned alternate inoperable while                  method for monitoring moving fuel.                        using a continuous monitor.
CONDITION REQUIRED ACTION COMPLETION TIME C.
OR C.2      Suspend fuel           Immediately movement.
For Function 1.b, both C.l required channels inoperable while Implement the Immediately moving fuel.
SURVEILLANCE REQUIREMENTS
SURVEILLANCE REQUIREMENTS OR C.2 preplanned alternate method for monitoring using a continuous monitor.
  --------------------------------------NOTE--------------------------------------
Suspend fuel movement.
These SRs apply to each Function in Table TR3.3.14-1 .
Immediately
* TRSR 3.3.14.1 SURVEILLANCE Perform CHANNEL CHECK.
--------------------------------------NOTE--------------------------------------
FREQUENCY 12 hours TRSR 3.3.14.2     Perform I
These SRs apply to each Function in Table TR3.3.14-1.
CHANNEL FUNCTIONAL TEST.             31 days TRSR 3.3.14.3     Perform CHANNEL CALIBRATION.                   24 months
SURVEILLANCE FREQUENCY TRSR 3.3.14.1 Perform CHANNEL CHECK.
* TRM Vol. I                           TRM 3.3-48                     REV 125   04/21
12 hours TRSR 3.3.14.2 Perform CHANNEL FUNCTIONAL TEST.
I 31 days TRSR 3.3.14.3 Perform CHANNEL CALIBRATION.
24 months TRM Vol. I TRM 3.3-48 REV 125 04/21  


SRV Position Indication TR 3.4.2
SRV Position Indication TR 3.4.2 TR 3.4 REACTOR COOLANT SYSTEM (RCS)
* TR 3.4 JR 3.4.2 REACTOR COOLANT SYSTEM (RCS)
JR 3.4.2 Safety Relief Valve (SRV) Position Indication TRLCO 3.4.2 The position indication function of the reactor coolant system safety relief valves shall be OPERABLE.
Safety Relief Valve (SRV) Position Indication TRLCO 3.4.2           The position indication function of the reactor coolant system safety relief valves shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:         MODES 1, 2, and 3.
MODES 1, 2, and 3.
ACTIONS CONDITION                   REQUIRED ACTION             COMPLETION TIME A. One or more safety         A.l     Restore indicator(s)     7 days relief valve position               to OPERABLE status.
ACTIONS CONDITION REQUIRED ACTION A.
One or more safety A.l Restore indicator(s) relief valve position to OPERABLE status.
indicators inoperable.
indicators inoperable.
I I
I I
B. Required Action and       B.l     Declare the             Immediately associated Completion             associated SRV Time not met.                       inoperable .
B.
* SURVEILLANCE REQUIREMENTS SURVEILLANCE                                 FREQUENCY TRSR 3.4.2.1     Perform CHANNEL CALIBRATION. The pressure       24 rmonths setpoint of each of the tail-pipe pressure switches shall be 30 + 5 psig .
Required Action and B.l Declare the associated Completion associated SRV Time not met.
* TRM Vol. I                            TRM 3.4-2                         REV 125   04/21
inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE TRSR 3.4.2.1 TRM Vol. I Perform CHANNEL CALIBRATION.
The pressure setpoint of each of the tail-pipe pressure switches shall be 30 + 5 psig.
TRM 3.4-2 COMPLETION TIME 7 days Immediately FREQUENCY 24 rmonths REV 125 04/21  


RCS Leakage Dete~tion System TR 3.4.3
RCS Leakage Dete~tion System TR 3.4.3 TR 3.4 REACTOR COOLANT SYSTf.M (RCS)
* TR 3.4 TR 3.4.3 REACTOR COOLANT SYSTf.M (RCS)
TR 3.4.3 Reactor Coolant System (RCS) Leakage Detection System TRLCO 3.4.3 The drywell equipment drain sump level, flow and pump-run-time system shall be OPERABLE.
Reactor Coolant System (RCS) Leakage Detection System TRLCO 3.4.3           The drywell equipment drain sump level, flow and pump-run-time system shall be OPERABLE.
APPLICABILIT\\
APPLICABILIT\         MODES 1, 2, and 3.
ACTIONS MODES 1, 2, and 3.
ACTIONS CONDITION                   REQUIRED ACTION           COMPLETION TIME A.
CONDITION REQUIRED ACTION A.
The drywell equipment     A.l     Restore the             30 days drain sump level, flow             inoperable detection or pump-run-time                   system to OPERABLE system inoperable.                 status.
The drywell equipment A.l Restore the drain sump level, flow inoperable detection or pump-run-time system to OPERABLE system inoperable.
B. Required Action and       B.l     Initiate a Corrective   Irnme,diately associated Completion               Action Document Time not met.                       outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status.
status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY TRSR 3.4.3.1     Perform CHANNEL FUNCTIONAL TEST.               31 days TRSR 3.4.3.2     Perform CHANNEL CALIBRATION .                 24 months
B.
* TRM Vol. I                           TRM 3.4-3                       REV 125   04/21
Required Action and B.l Initiate a Corrective associated Completion Action Document Time not met.
outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE TRSR 3.4.3.1 Perform CHANNEL FUNCTIONAL TEST.
TRSR 3.4.3.2 Perform CHANNEL CALIBRATION.
TRM Vol. I TRM 3.4-3 COMPLETION TIME 30 days Irnme,diately FREQUENCY 31 days 24 months REV 125 04/21  


Recirculation Pump MG Set Scoop Tube TR 3.4.7
Recirculation Pump MG Set Scoop Tube TR 3.4.7 TR 3.4 REACTOR COOLANT SYSTEM (RCS)
* TR 3.4 TR 3.4.7 REACTOR COOLANT SYSTEM (RCS)
TR 3.4.7 Recirculation Pump MG Set Scoop Tube TRLCO 3.4.7 Both recirculation pump MG set scoop tube mechanical stops APPLICABILITY:
Recirculation Pump MG Set Scoop Tube TRLCO 3.4.7           Both recirculation pump MG set scoop tube mechanical stops shall be OPERABLE.     '-
ACTIONS CONDITION A.
APPLICABILITY:        MODE 1.
shall be OPERABLE.
ACTIONS CONDITION                    REQUIRED ACTION            COMPLETION TIME A. One or more              A.1.1     Lock MG scoop tube.     2 hours recirculation pump MG set scoop tube                 AND mechanical stops inoperable.               A.1.2   Turn off power to the   2 hours positioner for any MG set with an inoperable mechanical high speed stop.
MODE 1.
OR
A.1.1 AND REQUIRED ACTION Lock MG scoop tube.
* A.2      Verify OPERABILITY per Technical Specification LCO 3.2.1, Average Planar Linear Heat Generation Rate Immediately (APLHGR) and LCO 3.2.2, Minimum Critical Power Ratio (MCPR).
COMPLETION TIME 2 hours One or more recirculation pump MG set scoop tube mechanical stops inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                FREQUENCY TRSR 3.4.7.1     Demonstrate each pump MG set scoop tube         24 months mechanical high speed stop is OPERABLE with over speed set points~ core flow values assumed in the COLR for determining MAPLHGR(F) and MCPR(F) .
A.1.2 Turn off power to the 2 hours positioner for any MG OR A.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE set with an inoperable mechanical high speed stop.
* TRM Vol. I                           TRM 3.4-10                       REV 125   04/21
Verify OPERABILITY per Technical Specification LCO 3.2.1, Average Planar Linear Heat Generation Rate (APLHGR) and LCO 3.2.2, Minimum Critical Power Ratio (MCPR).
Immediately FREQUENCY TRSR 3.4.7.1 Demonstrate each pump MG set scoop tube 24 months mechanical high speed stop is OPERABLE with over speed set points~ core flow values assumed in the COLR for determining MAPLHGR(F) and MCPR(F).
TRM Vol. I TRM 3.4-10 REV 125 04/21  


Suppression Chamber TR 3.6.1
TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber Suppression Chamber TR 3.6.1 TRLCO 3.6.1 Suppression chainper surveillance requirement TRSR 3.6.1.1 shall be met.
* TR 3.6 TR 3.6.1 CONTAINMENT SYSTEMS Suppression Chamber TRLCO 3.6.1               Suppression chainper surveillance requirement TRSR 3.6.1.1 shall be met.
APPLICABILITY:
APPLICABILITY:           MODES 1, 2, and 3.
MODES 1, 2, and 3.
ACTIONS CONDITION                       REQUIRED ACTION            COMPLETION TIME A. TRSR 3. 6. 1. 1 -1iot met. A.l     Declare suppression     Immediately chamber inoperable.
ACTIONS CONDITION A.
I SURVEILLANCE REQUIREMENTS SURVEILLANCE                              FREQUENCY
TRSR 3. 6. 1. 1 -1iot met.
* TRSR 3.6.1.1       Perform visual inspection of the accessible interior and exterior of the suppression chamber .
A.l I
24 months
SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIRED ACTION Declare suppression chamber inoperable.
* TRM Vol. I                               TRM 3.6-1                     REV 125   04/21
COMPLETION TIME Immediately FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 24 months interior and exterior of the suppression chamber.
TRM Vol. I TRM 3.6-1 REV 125 04/21  


Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication TR 3. 6. 4l
Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication TR 3. 6. 4l  
* , SURVEILLANCE REQUIREMENTS
, SURVEILLANCE REQUIREMENTS  
    --------------------------------------NOTE- -------------------------------------
--------------------------------------NOTE--------------------------------------
These SRs apply to each reactor building-to-suppression chamber vacuum breaker.
These SRs apply to each reactor building-to-suppression chamber vacuum breaker.
SURVEILLANCE                            FREQUENCY TRSR 3.6.4.1       During performance of Technical           In accordance with Specification SR 3.6.1.7.2, verify proper SR 3.6.1.7.2
TRSR 3.6.4.1 TRSR 3.6.4.2 TRSR 3.6.4.3 TRM Vol. I SURVEILLANCE During performance of Technical Specification SR 3.6.1.7.2, verify proper 1posi tion indication.
_ posi tion 1
Perform visual inspection.
indication.
Perform CHANNEL CALIBRATION on the position indicator.
TRSR 3.6.4.2      Perform visual inspection.               24 months TRSR 3.6.4.3      Perform CHANNEL CALIBRATION on the       24 months position indicator .
TRM 3.6-28 FREQUENCY In accordance with SR 3.6.1.7.2 24 months 24 months REV 125 04/21  
* TRM Vol. I                            TRM 3.6-28                   REV 125 04/21


Suppression Chamber-to-Drywell Vacuum Breaker Position Indication TR 3.6.5
Suppression Chamber-to-Drywell Vacuum Breaker Position Indication TR 3.6.5 SURVEILLANCE REQUIREMENTS  
* SURVEILLANCE REQUIREMENTS
--------------------------------------NOTE--------------------------------------
  --------------------------------------NOTE- -------------------------------------
These SRs apply to each suppression chamber-to-drywell vacuum breaker position indicator channel.
These SRs apply to each suppression chamber-to-drywell vacuum breaker position indicator channel.
SURVEILLANCE                              FREQUENCY TRSR 3.6.5.1     During ~erformance of Technical             In accordance Specifications SR 3.6.1.8.2, verify proper   with SR 3.6.1.8.2 position indication.
TRSR 3.6.5.1 TRSR 3.6.5.2 TRSR 3.6.5.3 TRM Vol. I SURVEILLANCE During ~erformance of Technical Specifications SR 3.6.1.8.2, verify proper position indication.
TRSR 3.6.5.2    Perform CHANNEL CALIBRATION.                 24 months TRSR 3.6.5.3    Verify the opening gap for switch actuation 24 months is< 0.03 inches .
Perform CHANNEL CALIBRATION.
* TRM Vol. I                          TRM 3.6-31                     REV 125   04/21
Verify the opening gap for switch actuation is< 0.03 inches.
TRM 3.6-31 FREQUENCY In accordance with SR 3.6.1.8.2 24 months 24 months REV 125 04/21  


Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 TR 3.8       ELECTRICAL POWER SYSTEMS TR 3.8.4     Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TRLCO 3.8.4           The thermal overload protection for each valve in Table TR3.8.4-l shall be OPERABLE.
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 ELECTRICAL POWER SYSTEMS TR 3.8 TR 3.8.4 Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TRLCO 3.8.4 The thermal overload protection for each valve in Table TR3.8.4-l shall be OPERABLE.
APPLICABILITY:         Whenever the motor-operated valve is required to be OPERABLE.
APPLICABILITY:
ACTIONS
Whenever the motor-operated valve is required to be OPERABLE.
  --------------------------------------NOTE- -------------------------------------
ACTIONS  
--------------------------------------NOTE--------------------------------------
Separate Condition entry is allowed for each valve.
Separate Condition entry is allowed for each valve.
CONDITION                   REQUIRED ACTION           COMPLETION TIME A. Thermal overload           A.l     Continuously bypass   8 hours protection inoperable             the inoperable for one or more                   thermal overload.
CONDITION REQUIRED ACTION COMPLETION TIME A.
Thermal overload A.l Continuously bypass 8 hours protection inoperable the inoperable for one or more thermal overload.
required valves.
required valves.
B. Required Action and       B.l     Declare affected       Immediately associated Completion             valve(s) inoperable.
B.
Required Action and B.l Declare affected Immediately associated Completion valve(s) inoperable.
Time not met.
Time not met.
SURVEILLANCE REQUIREMENTS
SURVEILLANCE REQUIREMENTS  
  --------------------------------------NOTE- -------------------------------------
--------------------------------------NOTE--------------------------------------
These SRs apply to each valve in Table TR3.8.4-l.
These SRs apply to each valve in Table TR3.8.4-l.
SURVEILLANCE                              FREQUENCY TRSR 3.8.4.1     Perform CHANNEL CALIBRATION of a             24 months representative sample of at least 25% of all thermal overloads for the, valves listed in Table TR3.8.4-l.
TRSR 3.8.4.1 TRSR 3.8.4.2 r,
TRSR 3.8.4.2      Perform CHANNEL CALIBRATION of the affected   Following thermal overload.                             maintenance activities which could affect performance of thermal overload
TRM Vol. I SURVEILLANCE Perform CHANNEL CALIBRATION of a representative sample of at least 25% of all thermal overloads for the, valves listed in Table TR3.8.4-l.
* r, TRM Vol. I                            TRM 3.8-5                      REV 125   04/21
Perform CHANNEL CALIBRATION of the affected thermal overload.
 
TRM 3.8-5 FREQUENCY 24 months Following maintenance activities which could affect performance of thermal overload REV 125 04/21
Electrical Equipment Protectiye Devices Motor-Operated Valves Thermal Overload Protection
: 1.
* TABLE TR3.8.4-l (Page 1 of 6)
: 2.
Motor-Operated Valves Thermal Overload Protection SYSTEM AFFECTED                                     VALVE NUMBER TR 3.8.4
: 3.
: 1. Nuclear Boiler Sy~tem                                               B2103-F016 B2103-F019
Electrical Equipment Protectiye Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 TABLE TR3.8.4-l (Page 1 of 6)
: 2. Reactor Recirculation System                                        B3105-F031A B3105-F031B r-
Motor-Operated Valves Thermal Overload Protection SYSTEM AFFECTED Nuclear Boiler Sy~tem Reactor Recirculation System Residual Heat Removal System VALVE NUMBER B2103-F016 B2103-F019 B3105-F031A B3105-F031B r-Ell50-F004A Ell50-F004B Ell50-F004C Ell50-E'004D Ell50-F006A Ell50-F006B Ell50-F006C Ell50-F006D Ell50-F007A Ell50-F007B Ell50-F008 Ell50-F009 Ell50-F015A Ell50-F015B Ell50-F016A Ell50-F016B Ell50-F017A Ell50-F017B (continued)
: 3. Residual Heat Removal System                                        Ell50-F004A Ell50-F004B Ell50-F004C Ell50-E'004D Ell50-F006A Ell50-F006B Ell50-F006C
TRM Vol. I TRM 3.8-6 REV 125 04/21
* Ell50-F006D Ell50-F007A Ell50-F007B Ell50-F008 Ell50-F009 Ell50-F015A Ell50-F015B Ell50-F016A Ell50-F016B Ell50-F017A Ell50-F017B (continued)
: 3.
* TRM Vol. I                                   TRM 3.8-6                               REV 125   04/21
: 4.
 
Electrical Equipment Protective Devices Motor-Operated Va~ves Thermal Overload Protection TR 3. 8. 4' TABLE TR3.8.4-1 (Page 2 of 6)
Electrical Equipment Protective Devices Motor-Operated Va~ves Thermal Overload Protection
Motor-Operated Valves Thermal Overload Protection SYSTEM AFFECTED VALVE NUMBER Reaidual Heat Removal System (continued)
* TABLE TR3.8.4-1 (Page 2 of 6)
El150-F021A El150-F021B El150-F024A El150-F024B El150-F027A El150-F027B El150-F028A El150-F028B El150-F048A El150-F048B El150-F608 RHR Service Water Pumps and Motors El150-F068A El150-F068B El150-F603A El150-F603B (continued)
Motor-Operated Valves Thermal Overload Protection SYSTEM AFFECTED                                     VALVE NUMBER TR 3. 8. 4'
TRM Vol. I TRM 3.8-7 REV 125 04/21
: 3. Reaidual Heat Removal System (continued)                           El150-F021A El150-F021B El150-F024A El150-F024B El150-F027A El150-F027B El150-F028A El150-F028B El150-F048A El150-F048B El150-F608
: 4.
: 4. RHR Service Water Pumps and Motors                                   El150-F068A El150-F068B El150-F603A El150-F603B (continued)
: 5.
* TRM Vol. I                                   TRM 3.8-7                               REV 125   04/21
: 6.
 
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 TABLE TR3.8.4-1 (Page 3 of 6)
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection
Motor-operated Valves Thermal Overload Protection SYSTEM AFFEGTED VALVE NUMBER RHR Service Water Pumps and Motors (continued)
* TABLE TR3.8.4-1 (Page 3 of 6)
E1150-F604A E1150-F604B E1150-F605A Ell50-F605B Core Spray Sy~tem E2150-F005A E2150-F005B E2150-F015A r
Motor-operated Valves Thermal Overload Protection SYSTEM AFFEGTED                                     VALVE NUMBER TR 3.8.4
E2150-F015B E2150-F031A E2150-F031B E2150-F036A E2150-F036B High Pressure Coolant Injection System E4150-F001 E4150-F002 E4150-F003 E4150-F004 E4150-F006 E4150-F012 E4150-F021 E4150-F022 E4150-F041 E4150-F042 E4150-F059 E4150-F075 (continued)
: 4. RHR Service Water Pumps and Motors (continued)                       E1150-F604A E1150-F604B E1150-F605A Ell50-F605B
TRM Vol. I TRM 3.8-8 REV 125 04/21
: 5. Core Spray Sy~tem                                                   E2150-F005A E2150-F005B E2150-F015A r     E2150-F015B E2150-F031A E2150-F031B E2150-F036A E2150-F036B
: 6.
: 6. High Pressure Coolant Injection System                               E4150-F001 E4150-F002 E4150-F003 E4150-F004 E4150-F006 E4150-F012 E4150-F021 E4150-F022 E4150-F041 E4150-F042 E4150-F059 E4150-F075 (continued)
: 7.
* TRM Vol. I                                   TRM 3.8-8                               REV 125   04/21
: 8.
 
: 9.
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 TABLE TR3.8.4-1 {Page 4 of 6)
* TABLE TR3.8.4-1 {Page 4 of 6)
Motor-Operated Valvee Thermal Overload Protection SYSTEM AFFECTED High Pressure Coolant Injection System (continued)
Motor-Operated Valvee Thermal Overload Protection SYSTEM AFFECTED                                     VALVE NOMBER TR 3.8.4
Reactor Core Isolation Cooling System Drywell Floor Drain System Reactor Water Clean-up System (Return Line)
: 6. High Pressure Coolant Injection System (continued)                   E4150-F079 E4150-F600
VALVE NOMBER E4150-F079 E4150-F600 E5150-F001 E5150-F002 E5150-F007 E5150-F008 E5150-F010 E5150-F013 E5150-F019 E5150-F029 E5150-F031 E5150-F045 E5150-F046 E5150-F062 E5150-F084 E5150-F095 Gl154-F018 Gll54-F600 G3352-F001 G3352-F004
: 7. Reactor Core Isolation Cooling System                                E5150-F001 E5150-F002 E5150-F007 E5150-F008 E5150-F010 E5150-F013 E5150-F019 E5150-F029 E5150-F031 E5150-F045 E5150-F046 E5150-F062 E5150-F084 E5150-F095
: 10.
: 8. Drywell Floor Drain System                                          Gl154-F018 Gll54-F600
Torus Water Management System G3352-F220 G5100-F600 G5100-F601 G5100-F602 G5100-F603
: 9. Reactor Water Clean-up System                                        G3352-F001 G3352-F004 (Return Line)                      G3352-F220
: 10. Torus Water Management System                                       G5100-F600 G5100-F601 G5100-F602 G5100-F603
{continued)
{continued)
* TRM Vol. I                                   TRM 3.8-9                             REV 125   04/21
TRM Vol. I TRM 3.8-9 REV 125 04/21  


Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection _
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection _
* TABLE TR3.8.4-1 (Page 5 of 6)
TR 3.8.4 TABLE TR3.8.4-1 (Page 5 of 6)
Motor-Operated Valve~ Thermal Overload Protection SYSTEM AFFECTED                                     VALVE NUMBER TR 3.8.4
Motor-Operated Valve~ Thermal Overload Protection SYSTEM AFFECTED
: 10. Torus Water Management System (continued)                             G5100-F604 G5100-F605 G5100-F606 J
: 10.
G5100-F607
Torus Water Management System (continued)
: 11. Deleted
: 11.
: 12. Emergency EquJ.pment Cooling Water                                   P4400-F601A P4400-F601B P4400-F602A P4400-F602B P4400-F603A P4400-F603B P4400-F604 P4400-F605A P4400-F605B P4400-F606A P4400-F606B P4400-F607A P4400-F607B P4400-F608 P4400-F613 P4400-F614 P4400-F615 P4400-F616 '
Deleted
: 13. Deleted (continued)
: 12.
* TRM Vol. I                                   TRM 3.8-10                             REV 125   04/21
Emergency EquJ.pment Cooling Water
: 13.
Deleted VALVE NUMBER G5100-F604 G5100-F605 G5100-F606 J
G5100-F607 P4400-F601A P4400-F601B P4400-F602A P4400-F602B P4400-F603A P4400-F603B P4400-F604 P4400-F605A P4400-F605B P4400-F606A P4400-F606B P4400-F607A P4400-F607B P4400-F608 P4400-F613 P4400-F614 P4400-F615 P4400-F616 '
(continued)
TRM Vol. I TRM 3.8-10 REV 125 04/21  


Primary Containment Penetration Conductor Overcurrent Protective Devices TR ~.8.5
Primary Containment Penetration Conductor Overcurrent Protective Devices TR ~.8.5 SURVE~LLANCE REQUIREMENTS  
* SURVE~LLANCE REQUIREMENTS
--------------------------------------NOTE--------------------------------------
  --------------------------------------NOTE- -------------------------------------
Refer to Table TR3.8.5-l to determine which TRSRs apply for each Primary Containment Penetration Conductor Overcurrent Protective function.
Refer to Table TR3.8.5-l to determine which TRSRs apply for each Primary Containment Penetration Conductor Overcurrent Protective function.
SURVEILLANCE                              ~QUENCY TRSR 3.8.5.1     Perform CHANNEL CALIBRATION of the           24 months associated protective relays.
TRSR 3.8.5.1 TRSR 3.8.5.2 TRSR 3.8.5.3 TRSR 3.8.5.4 TRM Vol. I SURVEILLANCE Perform CHANNEL CALIBRATION of the associated protective relays.
TRSR 3.8.5.2    Perform an integrated system functional       24 months test which includes simulated automatic actuation of the system and verifying that each relay and associated circuit breakers and overcurrent control circuits function as designed.
Perform an integrated system functional test which includes simulated automatic actuation of the system and verifying that each relay and associated circuit breakers and overcurrent control circuits function as designed.  
TRSR 3.8.5.3    Perform functional test of 480 volt circuit   60 months breakers. Testing of these circuit
~QUENCY 24 months 24 months Perform functional test of 480 volt circuit 60 months breakers.
* breakers shall consist of injecting a current in excess of 120% of the breakers nominal setpoint and measuring the response time. The measured response time will be compared to the manufacturer's data to insure that it is less than or equal to a value specified by the manufacturer.
Testing of these circuit breakers shall consist of injecting a current in excess of 120% of the breakers nominal setpoint and measuring the response time.
TRSR 3.8.5.4    Subject each circuit breaker to an           60 months inspection and preventiVse maintenance in accordance with procedures,prepared in conjunction with its manufacturer's recommendations .
The measured response time will be compared to the manufacturer's data to insure that it is less than or equal to a value specified by the manufacturer.
* TRM Vol. I                          TRM 3.8-14                     REV 125 04/21
Subject each circuit breaker to an inspection and preventiVse maintenance in accordance with procedures,prepared in conjunction with its manufacturer's recommendations.
TRM 3.8-14 60 months REV 125 04/21  


SLC System Associated Isolation Devices TR 3.8.6
SLC System Associated Isolation Devices TR 3.8.6 SURVEILLANCE REQUIREMENTS  
* SURVEILLANCE REQUIREMENTS
--------------------------------------NOTE--------------------------------------
  --------------------------------------NOTE- -------------------------------------
These SRs apply to the devices in Table TR3.8.6-l.
These SRs apply to the devices in Table TR3.8.6-l.
                                                                              \
TRSR 3.8.6.1 TRSR 3.8.6.2 TRSR 3.8.6.3 TRSR 3.8.6.4 TRM Vol. I SURVEILLANCE
SURVEILLANCE                              FREQUENCY TRSR 3.8.6.1     Perform CHANNEL FUNCTIONAL TEST of SLC Pump   24 months A and B breakers, which includes simulation of actuation of the system and verifying that each relay and associated circuit breaker and overcurrent control circuit functions as designed.
\\
TRSR 3.8.6.2    Perform CHANNEL CALIBRATION of SLC Pump A     24 months and B breaker associated protective relays.
FREQUENCY Perform CHANNEL FUNCTIONAL TEST of SLC Pump 24 months A and B breakers, which includes simulation of actuation of the system and verifying that each relay and associated circuit breaker and overcurrent control circuit functions as designed.
TRSR 3.8.6.3    Perform CHANNEL FUNCTIONAL TEST of the SLC     60 months Heater B breaker, which includes current simulation injection of 2X and 5X the breaker rating to ensure the breaker trips within the time current characteristic curve.
Perform CHANNEL CALIBRATION of SLC Pump A 24 months and B breaker associated protective relays.
TRSR 3.8.6.4    Subject each circuit breaker to an             60 months inspection and preventive maintenance in accordance with procedures prepared in conjunction with its manufacturer's recommendations .
Perform CHANNEL FUNCTIONAL TEST of the SLC 60 months Heater B breaker, which includes current simulation injection of 2X and 5X the breaker rating to ensure the breaker trips within the time current characteristic curve.
* TRM Vol. I                          TRM 3.8-17                     REV 125   04/21
Subject each circuit breaker to an inspection and preventive maintenance in accordance with procedures prepared in conjunction with its manufacturer's recommendations.
                                                                    /
TRM 3.8-17 60 months REV 125 04/21  
/  


Standby Liquid Control System Associated Isolation Devices TR B3.8.6
TR B3.8 TR B3.8.6 BASES Standby Liquid Control System Associated Isolation Devices TR B3.8.6 ELECTRICAL POWER SYSTEMS Standby Liquid Control System Associated Isolation Devices Circuit breakers actuated by fault currents are used as isolation devices to protect equipment associated with the Standby Liquid Control System.
* TR B3.8 TR B3.8.6 ELECTRICAL POWER SYSTEMS Standby Liquid Control System Associated Isolation Devices BASES Circuit breakers actuated by fault currents are used as isolation devices to protect equipment associated with the Standby Liquid Control System. The OPERABILITY of these circuit breakers will ensure that the SLCS equipment is protected in the event of faults in the loads powered by these circuit breakers.
The OPERABILITY of these circuit breakers will ensure that the SLCS equipment is protected in the event of faults in the loads powered by these circuit breakers.
The SLC Pump A and B breakers are MCC positions with fused disconnect switches for fault protection and thermal overloads for overload protection. The CHANNEL FUNCTIONAL TEST of these breakers includes simulation of'actuation of the system and verification that each'relay and associated circuit breaker and overcurrent control circuit functions as designed. CHANNEL CALIBRATION of the associated protective relays includes testing to the time current curve and adjustment if necessary.
The SLC Pump A and B breakers are MCC positions with fused disconnect switches for fault protection and thermal overloads for overload protection.
The SLC tank heater is used only as an-aid when mixing sodium pentaborate and/or water to establish the required solution operating pa~ameters. Normal operation of the SLCS does not depend on the tank heater to maintain the solution above its saturation temperature. Technical requirements have been placed on the tank heater circuit breaker to ensure that its failure will not degrade other SLC components. These requirements include a CHANNEL FUNCTIONAL TEST which involves injecting a current of 2 times and 5 times the breaker rating to ensure the breaker trips within the time current characteristic curve. There are no protective relays associated with this molded case circuit breaker, thus there is no requirement to perform a CHANNEL CALIBRATION. The CHANNEL FUNCTIONAL TEST is performed on a 60-month frequency.
The CHANNEL FUNCTIONAL TEST of these breakers includes simulation of'actuation of the system and verification that each'relay and associated circuit breaker and overcurrent control circuit functions as designed.
7
CHANNEL CALIBRATION of the associated protective relays includes testing to the time current curve and adjustment if necessary.
                                                    *I l
The SLC tank heater is used only as an-aid when mixing sodium pentaborate and/or water to establish the required solution operating pa~ameters.
TRM Vol. I                         TRM B3.8.6-1                     REV 125 04/21}}
Normal operation of the SLCS does not depend on the tank heater to maintain the solution above its saturation temperature.
Technical requirements have been placed on the tank heater circuit breaker to ensure that its failure will not degrade other SLC components.
These requirements include a CHANNEL FUNCTIONAL TEST which involves injecting a current of 2 times and 5 times the breaker rating to ensure the breaker trips within the time current characteristic curve.
There are no protective relays associated with this molded case circuit breaker, thus there is no requirement to perform a CHANNEL CALIBRATION.
The CHANNEL FUNCTIONAL TEST is performed on a 60-month frequency.
7  
*I l
TRM Vol. I TRM B3.8.6-1 REV 125 04/21}}

Latest revision as of 09:34, 29 November 2024

Technical Requirements Manual - Vol. I
ML21118A026
Person / Time
Site: Fermi 
Issue date: 04/01/2021
From:
Detroit Edison, Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21118A026 (28)


Text

To: 00935 US NRC DOCUMENT CNTRL DESK 11555 ROCKVILLE PIKE ROCKVILLE, MD 20852 Media: 8 1/ 2 X 11 DETROIT EDISON -

FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 04/06/21 PAGE 1

DTC TMTRM Doc. Serial Number Number Cnt Issue Page Rev Copies Lvl Date Sec Status TRM VOL I 125 1

IR 04/01/21 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.

CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/ O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734 ) 586-4338 OR (734) 586 - 4061 for questions or concerns.

Ref: u21352

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 125 dated 04/01/2021 Immediately, upon reeeipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 124 has been inserted prior to inserting these pages.

SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 124 02/01/2021 Title Pa.,Q;e Rev 125 04/01/2021 Immediately following List of Effective Pages List of Effective Pages

\\_

Title Page LEP-1 through LEP-4 Rev 124 LEP-1 through LEP-4 Rev 125 04/01/2021 02/01/2021 3.3 Instrumentation TRM 3.3-6 Rev 31 10/99 TRM 3.3-6 Rev 125 04/21 TRM 3.3-13a Rev 67 04/04 TRM 3.3-13aRev 125 04/21 TRM 3.3-27 Rev 31 10/99 TRM 3.3-27 Rev 125 04/21 TRM 3.3-29 Rev 76 08/05 TRM 3.3-29 Rev 125 04/21 TRM 3.3-33 Rev 31 10/99 TRM 3.3-33 Rev 125 04/21 TRM 3.3-48 Rev 31 10/99 TRM 3.3-48 Rev 125 04/21 3.4 Reactor Coolant TRM 3.4-2 Rev 31 10/99 TRM 3.4-2 Rev 125 04/21 System (RCS)

TRM 3.4-3 Rev 31 10/99 TRM 3.4-3 Rev 125 04/21 TRM 3.4-10 Rev 31 10/99 TRM 3.4-10 Rev 125 04/21 3.6 Containment Systems TRM 3.6-1 Rev 60 01/03 TRM 3.6-1 Rev 125 04/21 TRM 3.6-28 Rev 31 10/99 TRM 3.6-28 Rev 125 04/21 TRM 3.6-31 Rev 31 10/99 TRM 3.6-31 Rev 125 04/21 3.8 Electrical Power TRM 3.8-5 Rev 31 10/99 TRM 3.8-5 Rev 125 04/21 Systems TRM 3.8-6 Rev 50 09/01 TRM 3.8-6 Rev 125 04/21 TRM 3.8-7 Rev 114 09/18 TRM 3.8-7 Rev 125 04/21 TRM 3.8-8 Rev 50 09/01 TRM 3.8-8 Rev 125 04/21 TRM 3.8-9 Rev 50 09/01 TRM 3.8-9 Rev 125 04/21 TRM 3.8-10 Rev 50 09/01 TRM 3.8-10 Rev 125 04/21 TRM 3.8-14 Rev 46 06/01 TRM 3.8-14 Rev 125 04/21 TRM 3.8-17 Rev 43 03/01 TRM 3.8-17 Rev 125 04/21 B3.8 Electrical Power Systems TRM B3.8.6-1 Rev 43 03/01 TRM B3.8.6-1 Rev 125 04/21 Note: The changes above reflect those justified and described in LCR#s 20-038-TRM and 20-048-'{RM.

END

DTC: TMTRM I File: 1754 Date 04/01/2021 ARMS - INFORMATION Fermi 2 Technical Requirements Manual/

'Volume I

(

DTE Electric I DSN: TRM VOL I I Rev: 125 I Recipient

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OB' EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 106 TRM 3.3-30 Revision 31 TRM ii Revision 107 TRM 3.3-31 Revision 31 TRM iii Revision 105 TRM 3.3-32 Revision 31 TRM iv Revision 106 TRM 3.3-33 Revision 125 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Ravision 31 TRM 3.3-35 Revision 60 TRM 1.0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision: 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 72 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-o Revision 106 TRM,3.3-48 Revision 125 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1 Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Rev;ision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 31 TRM 3.4-2 Revision 125 TRM 3.3-6 Revision 125 TRM 3.4-3 Revision 125 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-13 Revision 74 TRM 3.4-10 Revision 125 TRM 3.3-13a Revision 125 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 125 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Ravision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 125 TRM 3.6-13 Revision 123 TRM 3.3-28 Ravision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 125 TRM 3.6-14a RQvision 123 TRM Vol. I LEP-1 REV 125 04/01/2021

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-15 Revision 123 TRM 3.8-9 Revision 125 TRM 3.6-16 Revision 123 TRM 3.8-10 Revision 125 TRM 3.6-17 Revision 123 TRM 3.8-11 Revision 123 TRM 3.6-18 Revision 123 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 125 TRM 3.6-21 Revision 123 TRM 3.8-15 Ravi."sion 31 TRM 3.6-22 Revision 123 TRM 3.8-16 Revision 31 I

TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 125

'TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 125 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 125 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revision 53 TRM 3.7-5 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 R4:1vision 31 TRM 3.12-10 Revision 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3. 7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 R&1vision 31 I

TRM 3.7-14 Revision 121 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120

'fRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 113 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 125 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 125 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 125 TRM 3.12-30 Revision 31 TRM 3.8-8 Revision 125 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 125 04/01/2021

_J

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I

~

LIST OF EFFECTIVE PAGES Paga Revision Paga Revision TRM 5.0-a Revision 105 TRM B3.4.6-1 Revision 31 TRM 5.0-1 Revision 119 TRM B3.4.7-1

- Revision 31 TRM 5.0-2 Revision 105 TRM B3.5-1 Revision 31 TRM B1.0-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.2-1 Revision 67 TRM B3.0-1 Revision 63 TRM B3.6.3-1 Revision 87 TRM B3.0-2 Revision 63 TRM B3.6.4-1 Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.5-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.6-1 Revision 70 TRM B3.0-20 Revision 72 TRM B3.6.7-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.2-1 Revision 107 TRM B3.0-6 Revision 72 TRM B3.7.3-1 Revision 73 TRM B3.0-7 Revision 72 TRM B3.7.4-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3*. 7. 7-1 Revision 99 TRM B3.3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.3-1 Revision 67 TRM B3.8.1-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.4-2 Revision 84 TRM B3.8.3-1 Revision 96 TRM B3.3.5-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.6-1 Revision 116 TRM B3.8.6-1 Revision 125 TRM B3.3.6-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-4 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.9.4-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.10-1 Revision 31 TRM B3. 3._7-1 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-3 Revision 106 TRM B3.12.2-1 Revision 112 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.+2.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 125 04/01/2021

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I CORE OPERATING LIMITS REPORT COLR 21, Revision 0 LIST OF EFFECTIVE PAGES Paga Revision Notation Paga 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TRM Vol. I 0

0 0

Q 0

0 0

0 0

,o 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

LEP-4 REV 125 04/01/2021

Control Rod Block Instrumentation TR 3.3.2.1 SURVEILLANCE REQUIREMENTS (continued)

TRSR 3. 3. 2. 1. 5 SURVEILLANCE


NOTES-------------------

1. For Function 1, not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after IRMs on Range 2 or below.
2.

For Function 2, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

3. Neutron detectors are excluded.

Perform CHANNEL CALIBRATION.

TRSR 3.3.2.1.6 Perform CHANNEL FUNCTIONAL TEST.

TRSR 3

  • 3
  • 2
  • 1. 7 Perform CHANNEL CALIBRATION.

TRSR 3

  • 3
  • 2
  • 1. 8

-----------NOTE--------------------

Neutron detectors are excluded.

Perform CHANNEL CALIBRATION.

TRM Vol. I TRM 3.3-6 FREQUENCY 184 days 24 months 24 months 24 months REV 125 04/21

Accident Monitoring Instrumentation TR 3.3.3 SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------

These SRs apply to each Function in Table TR3.3.3-1.

TRSR 3.3.3.1 TRSR 3.3.3.2 TRSR 3.3.3.3 TRSR 3.3.3.4 TRM Vol. I SURVEILLANCE Perform CHANNEL CHECK.


NOTE----------------------

Only applicable to Functions 1, 2, 3, 4, 5.a and 5.b.

Perform CHANNEL CALIBRATION.


NOTES---------------------

1.

Only applicable to Functions 6 and 7.

2.

Not required to be performed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one channel, and 7 days for the second channel after~ 15% RTP.

Perform CHANNEL CALIBRATION.


NOTE----------------------

Only applicable to Functions 5.c and 5.d.

Perform CHANNEL CALIBRATION.

TRM 3.3-13a FREQUENCY

'31 days 24 months 92 DAYS 18 months REV 125 04/21

Suppression Pool Water Temperature Instrumentation TR 3.3.6.4 ACTIONS (Continued)

CONDITION B.

Two or more B.l suppression pool water temperature instrumentation channels inoperable.

C.

Required Action and C.l associated Completion Time of Condition B not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIRED ACTION Restore at least seven temperature instrumentation channels to OPERABLE status.

Perform OPERABILITY assessment on Technical Specification LCO 3.6.2.1, Suppression Pool Average Temperature.

TRSR 3.3.6.4.l Perform CHANNEL CHECK.

TRSR 3.3.6.4.2 TRSR 3.3.6.4.3 TRM Vol. I Perform CHANNEL FUNCTIONAL TEST.

Perform CHANNEL CALIBRATION.

The water high temperature alarm setpoint is~ 105°F.

TRM 3.3-27 COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Immediately FREQUENCY 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 31 days 24 months REV 125 04/21

TWMS Narrow,Range Suppression Pool Water Level Instrumentation TR 3.3.6.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.3.6.5.1 Perform CHANNEL CHECK.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l

TRSR 3.3.6.5.2 Perform CHANNEL FUNCTIONAL TEST.

92 days TRSR 3.3.6.5.3 Perform CHANNEL CALIBRATION.

The setpoints 24 months shall be:

TRM Vol. I

a.

High water level< 14 ft. 8 inches; and

b.

Low water level> 14 ft. 4 inches.

_/

TRM 3.3-29 REV 125 04/21

Seismic Monitoring Instrumentation TR 3.3.7.2 SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------

Refer to Table TR3.3.7.2-1 to determine which TRSRs apply for each Seismic Monitoring Instrumentation Function.

SURVEILLANCE TRSR 3.3.7.2.1


NOTE--------------------

For Function l.b.l, CHANNEL CHECK does not include seismic trigger.

Perform CHANNEL CHECK.

TRSR 3.3.7.2.2 Perform CHANNEL FUNCTIONAL TEST.

TRSR 3.3.7.2.3 Perform CHANNEL CALIBRATION.

FREQUENCY 31 days 184 days 24 months

_)

TRM Vol. I TRM 3.3-33 REV 125 04/21

Radiation Monitoring Instrumentation TR 3.3.14 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

For Function 1.b, both C.l required channels inoperable while Implement the Immediately moving fuel.

SURVEILLANCE REQUIREMENTS OR C.2 preplanned alternate method for monitoring using a continuous monitor.

Suspend fuel movement.

Immediately


NOTE--------------------------------------

These SRs apply to each Function in Table TR3.3.14-1.

SURVEILLANCE FREQUENCY TRSR 3.3.14.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRSR 3.3.14.2 Perform CHANNEL FUNCTIONAL TEST.

I 31 days TRSR 3.3.14.3 Perform CHANNEL CALIBRATION.

24 months TRM Vol. I TRM 3.3-48 REV 125 04/21

SRV Position Indication TR 3.4.2 TR 3.4 REACTOR COOLANT SYSTEM (RCS)

JR 3.4.2 Safety Relief Valve (SRV) Position Indication TRLCO 3.4.2 The position indication function of the reactor coolant system safety relief valves shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION A.

One or more safety A.l Restore indicator(s) relief valve position to OPERABLE status.

indicators inoperable.

I I

B.

Required Action and B.l Declare the associated Completion associated SRV Time not met.

inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE TRSR 3.4.2.1 TRM Vol. I Perform CHANNEL CALIBRATION.

The pressure setpoint of each of the tail-pipe pressure switches shall be 30 + 5 psig.

TRM 3.4-2 COMPLETION TIME 7 days Immediately FREQUENCY 24 rmonths REV 125 04/21

RCS Leakage Dete~tion System TR 3.4.3 TR 3.4 REACTOR COOLANT SYSTf.M (RCS)

TR 3.4.3 Reactor Coolant System (RCS) Leakage Detection System TRLCO 3.4.3 The drywell equipment drain sump level, flow and pump-run-time system shall be OPERABLE.

APPLICABILIT\\

ACTIONS MODES 1, 2, and 3.

CONDITION REQUIRED ACTION A.

The drywell equipment A.l Restore the drain sump level, flow inoperable detection or pump-run-time system to OPERABLE system inoperable.

status.

B.

Required Action and B.l Initiate a Corrective associated Completion Action Document Time not met.

outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status.

SURVEILLANCE REQUIREMENTS SURVEILLANCE TRSR 3.4.3.1 Perform CHANNEL FUNCTIONAL TEST.

TRSR 3.4.3.2 Perform CHANNEL CALIBRATION.

TRM Vol. I TRM 3.4-3 COMPLETION TIME 30 days Irnme,diately FREQUENCY 31 days 24 months REV 125 04/21

Recirculation Pump MG Set Scoop Tube TR 3.4.7 TR 3.4 REACTOR COOLANT SYSTEM (RCS)

TR 3.4.7 Recirculation Pump MG Set Scoop Tube TRLCO 3.4.7 Both recirculation pump MG set scoop tube mechanical stops APPLICABILITY:

ACTIONS CONDITION A.

shall be OPERABLE.

MODE 1.

A.1.1 AND REQUIRED ACTION Lock MG scoop tube.

COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> One or more recirculation pump MG set scoop tube mechanical stops inoperable.

A.1.2 Turn off power to the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> positioner for any MG OR A.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE set with an inoperable mechanical high speed stop.

Verify OPERABILITY per Technical Specification LCO 3.2.1, Average Planar Linear Heat Generation Rate (APLHGR) and LCO 3.2.2, Minimum Critical Power Ratio (MCPR).

Immediately FREQUENCY TRSR 3.4.7.1 Demonstrate each pump MG set scoop tube 24 months mechanical high speed stop is OPERABLE with over speed set points~ core flow values assumed in the COLR for determining MAPLHGR(F) and MCPR(F).

TRM Vol. I TRM 3.4-10 REV 125 04/21

TR 3.6 CONTAINMENT SYSTEMS TR 3.6.1 Suppression Chamber Suppression Chamber TR 3.6.1 TRLCO 3.6.1 Suppression chainper surveillance requirement TRSR 3.6.1.1 shall be met.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION A.

TRSR 3. 6. 1. 1 -1iot met.

A.l I

SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIRED ACTION Declare suppression chamber inoperable.

COMPLETION TIME Immediately FREQUENCY TRSR 3.6.1.1 Perform visual inspection of the accessible 24 months interior and exterior of the suppression chamber.

TRM Vol. I TRM 3.6-1 REV 125 04/21

Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication TR 3. 6. 4l

, SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------

These SRs apply to each reactor building-to-suppression chamber vacuum breaker.

TRSR 3.6.4.1 TRSR 3.6.4.2 TRSR 3.6.4.3 TRM Vol. I SURVEILLANCE During performance of Technical Specification SR 3.6.1.7.2, verify proper 1posi tion indication.

Perform visual inspection.

Perform CHANNEL CALIBRATION on the position indicator.

TRM 3.6-28 FREQUENCY In accordance with SR 3.6.1.7.2 24 months 24 months REV 125 04/21

Suppression Chamber-to-Drywell Vacuum Breaker Position Indication TR 3.6.5 SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------

These SRs apply to each suppression chamber-to-drywell vacuum breaker position indicator channel.

TRSR 3.6.5.1 TRSR 3.6.5.2 TRSR 3.6.5.3 TRM Vol. I SURVEILLANCE During ~erformance of Technical Specifications SR 3.6.1.8.2, verify proper position indication.

Perform CHANNEL CALIBRATION.

Verify the opening gap for switch actuation is< 0.03 inches.

TRM 3.6-31 FREQUENCY In accordance with SR 3.6.1.8.2 24 months 24 months REV 125 04/21

Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 ELECTRICAL POWER SYSTEMS TR 3.8 TR 3.8.4 Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TRLCO 3.8.4 The thermal overload protection for each valve in Table TR3.8.4-l shall be OPERABLE.

APPLICABILITY:

Whenever the motor-operated valve is required to be OPERABLE.

ACTIONS


NOTE--------------------------------------

Separate Condition entry is allowed for each valve.

CONDITION REQUIRED ACTION COMPLETION TIME A.

Thermal overload A.l Continuously bypass 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> protection inoperable the inoperable for one or more thermal overload.

required valves.

B.

Required Action and B.l Declare affected Immediately associated Completion valve(s) inoperable.

Time not met.

SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------

These SRs apply to each valve in Table TR3.8.4-l.

TRSR 3.8.4.1 TRSR 3.8.4.2 r,

TRM Vol. I SURVEILLANCE Perform CHANNEL CALIBRATION of a representative sample of at least 25% of all thermal overloads for the, valves listed in Table TR3.8.4-l.

Perform CHANNEL CALIBRATION of the affected thermal overload.

TRM 3.8-5 FREQUENCY 24 months Following maintenance activities which could affect performance of thermal overload REV 125 04/21

1.
2.
3.

Electrical Equipment Protectiye Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 TABLE TR3.8.4-l (Page 1 of 6)

Motor-Operated Valves Thermal Overload Protection SYSTEM AFFECTED Nuclear Boiler Sy~tem Reactor Recirculation System Residual Heat Removal System VALVE NUMBER B2103-F016 B2103-F019 B3105-F031A B3105-F031B r-Ell50-F004A Ell50-F004B Ell50-F004C Ell50-E'004D Ell50-F006A Ell50-F006B Ell50-F006C Ell50-F006D Ell50-F007A Ell50-F007B Ell50-F008 Ell50-F009 Ell50-F015A Ell50-F015B Ell50-F016A Ell50-F016B Ell50-F017A Ell50-F017B (continued)

TRM Vol. I TRM 3.8-6 REV 125 04/21

3.
4.

Electrical Equipment Protective Devices Motor-Operated Va~ves Thermal Overload Protection TR 3. 8. 4' TABLE TR3.8.4-1 (Page 2 of 6)

Motor-Operated Valves Thermal Overload Protection SYSTEM AFFECTED VALVE NUMBER Reaidual Heat Removal System (continued)

El150-F021A El150-F021B El150-F024A El150-F024B El150-F027A El150-F027B El150-F028A El150-F028B El150-F048A El150-F048B El150-F608 RHR Service Water Pumps and Motors El150-F068A El150-F068B El150-F603A El150-F603B (continued)

TRM Vol. I TRM 3.8-7 REV 125 04/21

4.
5.
6.

Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 TABLE TR3.8.4-1 (Page 3 of 6)

Motor-operated Valves Thermal Overload Protection SYSTEM AFFEGTED VALVE NUMBER RHR Service Water Pumps and Motors (continued)

E1150-F604A E1150-F604B E1150-F605A Ell50-F605B Core Spray Sy~tem E2150-F005A E2150-F005B E2150-F015A r

E2150-F015B E2150-F031A E2150-F031B E2150-F036A E2150-F036B High Pressure Coolant Injection System E4150-F001 E4150-F002 E4150-F003 E4150-F004 E4150-F006 E4150-F012 E4150-F021 E4150-F022 E4150-F041 E4150-F042 E4150-F059 E4150-F075 (continued)

TRM Vol. I TRM 3.8-8 REV 125 04/21

6.
7.
8.
9.

Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection TR 3.8.4 TABLE TR3.8.4-1 {Page 4 of 6)

Motor-Operated Valvee Thermal Overload Protection SYSTEM AFFECTED High Pressure Coolant Injection System (continued)

Reactor Core Isolation Cooling System Drywell Floor Drain System Reactor Water Clean-up System (Return Line)

VALVE NOMBER E4150-F079 E4150-F600 E5150-F001 E5150-F002 E5150-F007 E5150-F008 E5150-F010 E5150-F013 E5150-F019 E5150-F029 E5150-F031 E5150-F045 E5150-F046 E5150-F062 E5150-F084 E5150-F095 Gl154-F018 Gll54-F600 G3352-F001 G3352-F004

10.

Torus Water Management System G3352-F220 G5100-F600 G5100-F601 G5100-F602 G5100-F603

{continued)

TRM Vol. I TRM 3.8-9 REV 125 04/21

Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection _

TR 3.8.4 TABLE TR3.8.4-1 (Page 5 of 6)

Motor-Operated Valve~ Thermal Overload Protection SYSTEM AFFECTED

10.

Torus Water Management System (continued)

11.

Deleted

12.

Emergency EquJ.pment Cooling Water

13.

Deleted VALVE NUMBER G5100-F604 G5100-F605 G5100-F606 J

G5100-F607 P4400-F601A P4400-F601B P4400-F602A P4400-F602B P4400-F603A P4400-F603B P4400-F604 P4400-F605A P4400-F605B P4400-F606A P4400-F606B P4400-F607A P4400-F607B P4400-F608 P4400-F613 P4400-F614 P4400-F615 P4400-F616 '

(continued)

TRM Vol. I TRM 3.8-10 REV 125 04/21

Primary Containment Penetration Conductor Overcurrent Protective Devices TR ~.8.5 SURVE~LLANCE REQUIREMENTS


NOTE--------------------------------------

Refer to Table TR3.8.5-l to determine which TRSRs apply for each Primary Containment Penetration Conductor Overcurrent Protective function.

TRSR 3.8.5.1 TRSR 3.8.5.2 TRSR 3.8.5.3 TRSR 3.8.5.4 TRM Vol. I SURVEILLANCE Perform CHANNEL CALIBRATION of the associated protective relays.

Perform an integrated system functional test which includes simulated automatic actuation of the system and verifying that each relay and associated circuit breakers and overcurrent control circuits function as designed.

~QUENCY 24 months 24 months Perform functional test of 480 volt circuit 60 months breakers.

Testing of these circuit breakers shall consist of injecting a current in excess of 120% of the breakers nominal setpoint and measuring the response time.

The measured response time will be compared to the manufacturer's data to insure that it is less than or equal to a value specified by the manufacturer.

Subject each circuit breaker to an inspection and preventiVse maintenance in accordance with procedures,prepared in conjunction with its manufacturer's recommendations.

TRM 3.8-14 60 months REV 125 04/21

SLC System Associated Isolation Devices TR 3.8.6 SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------

These SRs apply to the devices in Table TR3.8.6-l.

TRSR 3.8.6.1 TRSR 3.8.6.2 TRSR 3.8.6.3 TRSR 3.8.6.4 TRM Vol. I SURVEILLANCE

\\

FREQUENCY Perform CHANNEL FUNCTIONAL TEST of SLC Pump 24 months A and B breakers, which includes simulation of actuation of the system and verifying that each relay and associated circuit breaker and overcurrent control circuit functions as designed.

Perform CHANNEL CALIBRATION of SLC Pump A 24 months and B breaker associated protective relays.

Perform CHANNEL FUNCTIONAL TEST of the SLC 60 months Heater B breaker, which includes current simulation injection of 2X and 5X the breaker rating to ensure the breaker trips within the time current characteristic curve.

Subject each circuit breaker to an inspection and preventive maintenance in accordance with procedures prepared in conjunction with its manufacturer's recommendations.

TRM 3.8-17 60 months REV 125 04/21

/

TR B3.8 TR B3.8.6 BASES Standby Liquid Control System Associated Isolation Devices TR B3.8.6 ELECTRICAL POWER SYSTEMS Standby Liquid Control System Associated Isolation Devices Circuit breakers actuated by fault currents are used as isolation devices to protect equipment associated with the Standby Liquid Control System.

The OPERABILITY of these circuit breakers will ensure that the SLCS equipment is protected in the event of faults in the loads powered by these circuit breakers.

The SLC Pump A and B breakers are MCC positions with fused disconnect switches for fault protection and thermal overloads for overload protection.

The CHANNEL FUNCTIONAL TEST of these breakers includes simulation of'actuation of the system and verification that each'relay and associated circuit breaker and overcurrent control circuit functions as designed.

CHANNEL CALIBRATION of the associated protective relays includes testing to the time current curve and adjustment if necessary.

The SLC tank heater is used only as an-aid when mixing sodium pentaborate and/or water to establish the required solution operating pa~ameters.

Normal operation of the SLCS does not depend on the tank heater to maintain the solution above its saturation temperature.

Technical requirements have been placed on the tank heater circuit breaker to ensure that its failure will not degrade other SLC components.

These requirements include a CHANNEL FUNCTIONAL TEST which involves injecting a current of 2 times and 5 times the breaker rating to ensure the breaker trips within the time current characteristic curve.

There are no protective relays associated with this molded case circuit breaker, thus there is no requirement to perform a CHANNEL CALIBRATION.

The CHANNEL FUNCTIONAL TEST is performed on a 60-month frequency.

7

  • I l

TRM Vol. I TRM B3.8.6-1 REV 125 04/21