RA-22-0190, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR .: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390(d)
{{#Wiki_filter:SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390(d)
UPON REMOVAL O F ENCLOSURE 2 THIS LE TTER IS UNCON TROLLED
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
 
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED John A. Krakuszeski Vice President Brunswick Nuclear Plant 8470 River Rd SE Southport, NC 28461 o: 910.832.3698 10 CFR 50.71(e) 10 CFR 54.37(b) 10 CFR 50.59(d) 10 CFR 72.48(d)
Jo hn A. Krak usze ski Vice Presid ent Brunswick N ucle ar Pla nt
August 11, 2022 Serial: RA-22-0190 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324  
 
8470 River Rd SE Southp ort, NC 2 846 1
 
o: 91 0.8 32. 369 8
 
August 11, 2022 Serial: RA 0190 10 CFR 50.71(e) 10 CFR 54.37(b) 10 CFR 50.59(d) 10 CFR 72.48(d)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555- 0001
 
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operati ng Licens e Nos. DPR -71 and DPR -62 Docket Nos. 50 -325 and 50- 324
 
SUBJECT : Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28,
10 CFR 54.37 Update, T echnical Requirements Manuals, Quality Assurance Program Description, T echnical Specification Bases, 10 CF R 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Changes
 
Ladies and Gentlemen:
Pursuant to 10 CFR 50.71(e), Duke Energy Progress, LLC (Duke Energy) hereby submits Revision 28 to the UFSAR for the Brunswick Steam Electric Plant (BNP), Unit Nos. 1 and 2. provides a copy of the UFSAR that has been redacted for public use. E nc l os u re 2 provides UFSAR pages t h at contain sensitive information to be withheld from public disclosure per 10 CFR 2.390(d). Changes from the previous revision are identified by vertical lines i n t h e margins of the pages that are indicated as Revision 28. Rev is i on 28 incorporates applicable c hanges made to the facility throug h June 8, 2022.


==SUBJECT:==
Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Changes Ladies and Gentlemen:
Pursuant to 10 CFR 50.71(e), Duke Energy Progress, LLC (Duke Energy) hereby submits Revision 28 to the UFSAR for the Brunswick Steam Electric Plant (BNP), Unit Nos. 1 and 2. provides a copy of the UFSAR that has been redacted for public use. Enclosure 2 provides UFSAR pages that contain sensitive information to be withheld from public disclosure per 10 CFR 2.390(d). Changes from the previous revision are identified by vertical lines in the margins of the pages that are indicated as Revision 28. Revision 28 incorporates applicable changes made to the facility through June 8, 2022.
10 CFR 54.37(b) requires that, after the renewed license is issued, the UFSAR update must include any systems, structures, and components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analysis in accordance with 10 CFR 54.21. The UFSAR update must describe how the effects of aging are managed such that the intended function(s) in 10 CFR 54.4(b) will be effectively maintained during the period of extended operation. Revision 28 does not include any new aging management programs in Chapter 18.
10 CFR 54.37(b) requires that, after the renewed license is issued, the UFSAR update must include any systems, structures, and components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analysis in accordance with 10 CFR 54.21. The UFSAR update must describe how the effects of aging are managed such that the intended function(s) in 10 CFR 54.4(b) will be effectively maintained during the period of extended operation. Revision 28 does not include any new aging management programs in Chapter 18.
Documents that are incorporated by reference into the UFSAR are identified in Section 1.6 of the UFSAR and are also included in this letter. Enclosure 3 contains the Unit 1 Technical Requirements Manuals (TRM), Enclosure 4 contains the Unit 2 TRM, and Enclosure 5 contains the Duke Energy Quality Assurance Program Description.
Pursuant to Technical Specification (TS) 5.5.10 for BNP, Unit Nos. 1 and 2, Duke Energy is providing the latest revisions of the TS Bases for each BNP unit. Enclosure 6 contains the Unit 1


Documents that are incorporated by reference into the UFSAR are identified in Section 1.6 of the UFSAR and are also included in t his let t er. E nc l os u r e 3 contains the Unit 1 Technical Requirements Manuals (TRM), Enclosure 4 contains the Unit 2 TRM, and Enclosure 5 contains the Duke Energy Quality Assurance Program Description.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
Pursuant to Technical Specification (TS) 5.5.10 for B NP, Uni t Nos. 1 and 2, Duk e E nergy is providing the latest revisions of the TS Bases for each BNP unit. E nc l os u r e 6 c o nt ains the Unit 1 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
UPON REMOVAL O F ENCLOSURE 2 THIS LE TTER IS UNCON TROLLED SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d)
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-22-0190 Page 2 TS Bases, which includes those changes that have been incorporated since the last submittal to the NRC (i.e., Revisions 111 through 120) and Enclosure 7 contains the Unit 2 TS Bases, which includes those changes that have been incorporated since the last submittal to the NRC (i.e.,
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-22-0190 Page 2 TS Bases, which includes those changes that have been incorporated since the last submittal to the NRC (i.e., Revisions 111 through 120) and Enclosure 7 contains the Unit 2 TS Bases, which includes those changes that have been incorporated since the last submittal to the NRC (i.e.,
Revisions 110 through 120).
Revisions 110 through 120).
Pursuant to 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2), Duke Energy is providing a report summarizing the 1 O CFR 50.59 and 10 CFR 72.48 evaluations of changes, tests, and experiments implemented during the period from August 1, 2020, to July 31, 2022. The 10 CFR 50.59 Evaluation Summary Report is provided in Enclosure 8. No 10 CFR 72.48 evalu ations were performed during this period.
Pursuant to 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2), Duke Energy is providing a report summarizing the 1 O CFR 50.59 and 10 CFR 72.48 evaluations of changes, tests, and experiments implemented during the period from August 1, 2020, to July 31, 2022. The 10 CFR 50.59 Evaluation Summary Report is provided in Enclosure 8. No 10 CFR 72.48 evaluations were performed during this period.
A Commitment Change Summary Report is submitted with the 10 CFR 50.71(e) required UFSAR revision. Enclosure 9 provides a summary of changes to NRC commitments made during the period from August 1, 2020, to July 31, 2022 requiring NRC notification.
A Commitment Change Summary Report is submitted with the 10 CFR 50.71(e) required UFSAR revision. Enclosure 9 provides a summary of changes to NRC commitments made during the period from August 1, 2020, to July 31, 2022 requiring NRC notification.
No new regula tory commitments are contained in this submittal.
No new regulatory commitments are contained in this submittal.
Please refer any quest ions concerning this letter and its enclosures to Ryan Treadway, Director -Nuclear Fleet Licensing, at (980) 373-5873.
Please refer any questions concerning this letter and its enclosures to Ryan Treadway, Director - Nuclear Fleet Licensing, at (980) 373-5873.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on August 11, 2022.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on August 11, 2022.
Sincerely, 9A-\\ John A. Krakuszeski Vice President, Brunswick Nuclear Plant SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d)
Sincerely, 9A-\\
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
John A. Krakuszeski Vice President, Brunswick Nuclear Plant SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
UPON REMOVAL O F ENCLOSURE 2 THIS LE TTER IS UNCON TROLLED U. S. Nuclear Regulatory Commission RA 0190 Page 3
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED  
 
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-22-0190 Page 3 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED


==Enclosures:==
==Enclosures:==
: 1. Brunswick Steam Electric Plant UFSAR Revision 28 - Redacted Version
: 1.
: 2. Brunswick Steam Electric Plant UFSAR Revision 28 - Withheld Pages
Brunswick Steam Electric Plant UFSAR Revision 28 - Redacted Version
: 3. Unit 1 Technical Requirements Manual
: 2.
: 4. Unit 2 Technical Requirements Manual
Brunswick Steam Electric Plant UFSAR Revision 28 - Withheld Pages
: 5. Duke Energy Quality Assurance Program Description
: 3.
: 6. Unit 1 Technical Specification Bases
Unit 1 Technical Requirements Manual
: 7. Unit 2 Technical Specification Bases
: 4.
: 8. 10 CFR 50.59 Evaluation Summary Report
Unit 2 Technical Requirements Manual
: 9. Commitment Change Summary Report
: 5.
 
Duke Energy Quality Assurance Program Description
cc:
: 6.
 
Unit 1 Technical Specification Bases
L. Dudes, USNRC, Region II Regional Administrator L. Haeg, USNRC NRR Project Manager for BNP G. Smith, USNRC Senior Res ident Ins pector for BNP
: 7.
 
Unit 2 Technical Specification Bases
(without Enclosure 2)
: 8.
General Couns el to Chair of NC Utilities Commission (s w at s o n@ nc uc. n et)
10 CFR 50.59 Evaluation Summary Report
D. Crowley (david.crowley@ dhhs.nc.gov), NC DHHS, Radiation Protec tion Section
: 9.
 
Commitment Change Summary Report cc:
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
L. Dudes, USNRC, Region II Regional Administrator L. Haeg, USNRC NRR Project Manager for BNP G. Smith, USNRC Senior Resident Inspector for BNP (without Enclosure 2)
UPON REMOVAL O F ENCLOSURE 2 THIS LE TTER IS UNCON TROLLED}}
General Counsel to Chair of NC Utilities Commission (swatson@ncuc.net)
D. Crowley (david.crowley@dhhs.nc.gov), NC DHHS, Radiation Protection Section}}

Revision as of 17:08, 27 November 2024

Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR .
ML22223A103
Person / Time
Site: Brunswick  
Issue date: 08/11/2022
From: Krakuszeski J
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22223A102 List:
References
RA-22-0190
Download: ML22223A103 (3)


Text

SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390(d)

UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)

UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED John A. Krakuszeski Vice President Brunswick Nuclear Plant 8470 River Rd SE Southport, NC 28461 o: 910.832.3698 10 CFR 50.71(e) 10 CFR 54.37(b) 10 CFR 50.59(d) 10 CFR 72.48(d)

August 11, 2022 Serial: RA-22-0190 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324

SUBJECT:

Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Changes Ladies and Gentlemen:

Pursuant to 10 CFR 50.71(e), Duke Energy Progress, LLC (Duke Energy) hereby submits Revision 28 to the UFSAR for the Brunswick Steam Electric Plant (BNP), Unit Nos. 1 and 2. provides a copy of the UFSAR that has been redacted for public use. Enclosure 2 provides UFSAR pages that contain sensitive information to be withheld from public disclosure per 10 CFR 2.390(d). Changes from the previous revision are identified by vertical lines in the margins of the pages that are indicated as Revision 28. Revision 28 incorporates applicable changes made to the facility through June 8, 2022.

10 CFR 54.37(b) requires that, after the renewed license is issued, the UFSAR update must include any systems, structures, and components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analysis in accordance with 10 CFR 54.21. The UFSAR update must describe how the effects of aging are managed such that the intended function(s) in 10 CFR 54.4(b) will be effectively maintained during the period of extended operation. Revision 28 does not include any new aging management programs in Chapter 18.

Documents that are incorporated by reference into the UFSAR are identified in Section 1.6 of the UFSAR and are also included in this letter. Enclosure 3 contains the Unit 1 Technical Requirements Manuals (TRM), Enclosure 4 contains the Unit 2 TRM, and Enclosure 5 contains the Duke Energy Quality Assurance Program Description.

Pursuant to Technical Specification (TS) 5.5.10 for BNP, Unit Nos. 1 and 2, Duke Energy is providing the latest revisions of the TS Bases for each BNP unit. Enclosure 6 contains the Unit 1

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)

UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-22-0190 Page 2 TS Bases, which includes those changes that have been incorporated since the last submittal to the NRC (i.e., Revisions 111 through 120) and Enclosure 7 contains the Unit 2 TS Bases, which includes those changes that have been incorporated since the last submittal to the NRC (i.e.,

Revisions 110 through 120).

Pursuant to 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2), Duke Energy is providing a report summarizing the 1 O CFR 50.59 and 10 CFR 72.48 evaluations of changes, tests, and experiments implemented during the period from August 1, 2020, to July 31, 2022. The 10 CFR 50.59 Evaluation Summary Report is provided in Enclosure 8. No 10 CFR 72.48 evaluations were performed during this period.

A Commitment Change Summary Report is submitted with the 10 CFR 50.71(e) required UFSAR revision. Enclosure 9 provides a summary of changes to NRC commitments made during the period from August 1, 2020, to July 31, 2022 requiring NRC notification.

No new regulatory commitments are contained in this submittal.

Please refer any questions concerning this letter and its enclosures to Ryan Treadway, Director - Nuclear Fleet Licensing, at (980) 373-5873.

I declare, under penalty of perjury, that the foregoing is true and correct. Executed on August 11, 2022.

Sincerely, 9A-\\

John A. Krakuszeski Vice President, Brunswick Nuclear Plant SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)

UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)

UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-22-0190 Page 3 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)

UPON REMOVAL OF ENCLOSURE 2 THIS LETTER IS UNCONTROLLED

Enclosures:

1.

Brunswick Steam Electric Plant UFSAR Revision 28 - Redacted Version

2.

Brunswick Steam Electric Plant UFSAR Revision 28 - Withheld Pages

3.

Unit 1 Technical Requirements Manual

4.

Unit 2 Technical Requirements Manual

5.

Duke Energy Quality Assurance Program Description

6.

Unit 1 Technical Specification Bases

7.

Unit 2 Technical Specification Bases

8.

10 CFR 50.59 Evaluation Summary Report

9.

Commitment Change Summary Report cc:

L. Dudes, USNRC, Region II Regional Administrator L. Haeg, USNRC NRR Project Manager for BNP G. Smith, USNRC Senior Resident Inspector for BNP (without Enclosure 2)

General Counsel to Chair of NC Utilities Commission (swatson@ncuc.net)

D. Crowley (david.crowley@dhhs.nc.gov), NC DHHS, Radiation Protection Section