ML21245A207: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Future Plant Designs Subcommittee Preliminary Rule 10 CFR Part 53, Licensing and Regulation of Advanced Nuclear Reactors:
{{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Future Plant Designs Subcom mittee Preliminary Rule 10 CFR Part 53, Licensing and Regulation of Advanced Nuclear Reactors :
Subpart B - Technology-Inclusive Safety Requirements 3rd Iteration Subpart C - Requirements for Design and Analysis 3rd Iteration Subpart H - Licenses, Certifications, and Approvals Subpart I - Maintaining and Revising Licensing Basis Information Subpart J - Reporting and Other Administrative Requirements Subpart F - Reqts for Operations (Staffing, Training, Personnel, Human Factors)
Subpart B - Technology-Inclusive Safety Requirements 3rd Iteration Subpart C - Requirements for Design and Analysis 3rd Iteration Subpart H - Licenses, Certifications, and Approvals Subpart I - Maintaining and Revising Licensing Basis Information Subpart J - Reporting and Other Administrative Requirements Subpart F - Reqts for Operations ( Staffing, Training, Personnel, Human Factors)
Part 53 - Additional Efforts ROCKVILLE, MARYLAND #
Part 53 - Additional Efforts ROCKVILLE, MARYLAND #
September 23 and 24, 2021
September 23 and 2 4, 2021
# The Subcommittee is meeting virtually during the COVID-19 Pandemic. Members of the public should use the following teleconference line to listen into the meeting: Teleconference Line: 301-576-2978; Passcode: 183706321#
 
Cognizant Staff Engineer / DFO: Derek A Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 September 23, 2021 Topic                                               Presenter(s)           Time
# The Subcommittee is meeting virtually during the COVID -19 Pandemic. Members of the public should use the following teleconference li ne to listen into the meeting: Teleconference Line: 301 -576-2978; Passcode: 183706321#
: 1. Opening Remarks                                                         Dr. David Petti, ACRS   9:30 AM - 9:35 AM
 
: 2. Staff Introduction                                                         John Segala, NRR     9:35 AM - 9:40 AM 10 CFR Part 53 - Subpart B - Technology-Inclusive Safety Requirements; Subpart C - Requirements for                           Bill Reckley, NRR Design and Analysis - 3RD ITERATION                                       Nanette Valliere, NRR
Cognizant Staff Engineer / DFO: Derek A Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375
: 3.                                                                                                    9:40 AM - 1:00 PM *
 
September 23, 202 1
 
Topic Presenter(s) Time
: 1. Opening Remarks Dr. David Petti, ACRS 9:3 0 AM - 9:35 AM
: 2. Staff Introduction John Segala, NRR 9:3 5 AM - 9:4 0 AM
 
10 CFR Part 53 - Subpart B - Technology-Inclusive Safety Requirements; Subpart C - Requirements for Bill Reckley, NRR
: 3. Design and Analysis - 3RD ITERATION Nanette Valliere, NRR :4 0 AM - 1:00 PM
* 9
* Introduction & Comments Received
* Introduction & Comments Received
* Revised Preliminary Rule Language Lunch                                                                                           1:00 PM - 2:00 PM 10 CFR Part 53 - Subpart H - Licenses, Certifications,                      Bill Reckley, NRR
* Revised Preliminary Rule Language Lunch 1:00 PM - 2:00 PM
: 4. and Approvals                                                            Nanette Valliere, NRR 2:00 PM - 3:15 PM
* Preliminary Rule Language 10 CFR Part 53 - Subpart I - Maintaining and Revising                        Bill Reckley, NRR Licensing Basis Information                                              Nanette Valliere, NRR  3:15 PM - 4:30 PM 5.
* Preliminary Rule Language Break                                                                                            4:30 PM - 4:45 PM
* A break will be held at a suitable time as determined by the Chairman (September 23rd Agenda continues on Page 2) 1


10 CFR Part 53 - Subpart J - Reporting and Other                    Bill Reckley, NRR
10 CFR Part 53 - Subpart H - Licenses, Certifications, Bill Reckley, NRR
: 6. Administrative Requirements                                      Nanette Valliere, NRR           4:45 PM - 5:50 PM
: 4. and Approvals Nanette Valliere, NRR 2:00 PM - 3:15 PM
* Preliminary Rule Language
* Preliminary Rule Language
: 7. Discussion                                                             SC Members                 5:50 PM - 6:00 PM Adjourn                                                                                                 6:00 PM September 24, 2021 Topic                                       Presenter(s)                       Time
 
: 1. Opening Remarks                                                 Dr. David Petti, ACRS             9:30 AM - 9:35 AM Overview: 10 CFR Part 53 - Subpart F - Requirements for Operations, Section 73.750 - General Staffing, Training, Personnel Qualifications, and Human Factors Requirements Bill Reckley, NRR 10 CFR Part 53 Rulemaking - Additional Efforts                   Nanette Valliere, NRR
10 CFR Part 53 - Subpart I - Maintaining and Revising Bill Reckley, NRR 3:15 PM - 4:30 PM
: 2.                                                                                                      9:35 AM - 12:45 PM *
: 5. Licensing Basis Information Nanette Valliere, NRR
* Part 50 Supplement: Technology-inclusive, Deterministic Licensing Framework Option
* Preliminary Rule Language Break 4:30 PM - 4:45 PM
* A break will be held at a suitable time as determined by the Chairman
 
(September 23 rd Agenda continues on Page 2)
 
1 10 CFR Part 53 - Subpart J - Reporting and Other Bill Reckley, NRR
: 6. Administrative Requirements Nanette Valliere, NRR 4:4 5 PM - 5:50 PM
* Preliminary Rule Language
: 7. Discussion SC Members 5:5 0 PM - 6:00 PM Adjourn 6:00 PM
 
September 24, 2021
 
Topic Presenter(s) Time
: 1. Opening Remarks Dr. David Petti, ACRS 9:30 A M - 9:35 AM
 
Overview: 10 CFR Part 53 - Subpart F - Requirements for Operations, Section 73.750 - General Staffing, Training, Personnel Qualifications, and Human Factors Requirements
 
Bill Reckley, NRR
: 2. 10 CFR Part 53 Rulemaking - Additional Efforts Nanette Valliere, NRR 9:35 AM - 12:45 PM *
* Part 50 Supplement: Technology -inclusive, Deterministic Licensing Framework Option
* Part 53 Licensing Framework and Subpart Structure
* Part 53 Licensing Framework and Subpart Structure
: 3. Discussion                                                             SC Members               12:45 PM - 1:00 PM Adjourn                                                                                                 1:00 PM
: 3. Discussion SC Members 12 :45 PM - 1:00 PM
* A break will be held at a suitable time as determined by the Chairman Notes:
 
* During the meeting, 301-415-7360 should be used to contact anyone in the ACRS Office.
Adjourn 1:00 PM
* Federal Register Notice 84 FR 27662 (https://www.govinfo.gov/content/pkg/FR-2019-0613/pdf/2019-12425.pdf )
* A break will be held at a suitable time as determined by the Chairman
 
Notes:
* During the meeting, 301 -415-7360 should be used to contact anyone in the ACRS Office.
* Federal Register Notice 84 FR 27662 ( https://www.govinfo.gov/content/pkg/FR-2019-0613/pdf/2019 -12425.pdf )
dated June 13, 2019, describes procedures to be followed with respect to meetings conducted by the U.S. Nuclear Regulatory Commissions (NRCs) Advisory Committee on Reactor Safeguards (ACRS) pursuant to the Federal Advisory Committee Act (FACA) and NRC implementing regulations found at Title 10 of the Code of Federal Regulations Part 7, Advisory Committees. Members of the public who desire to provide written or oral input for ACRS Full Committee and Subcommittee meetings may do so and should contact the Designated Federal Official (DFO - listed above) five days prior to the meeting, as practicable. In addition, there will be time allotted at each meeting for the public to provide oral comment.
dated June 13, 2019, describes procedures to be followed with respect to meetings conducted by the U.S. Nuclear Regulatory Commissions (NRCs) Advisory Committee on Reactor Safeguards (ACRS) pursuant to the Federal Advisory Committee Act (FACA) and NRC implementing regulations found at Title 10 of the Code of Federal Regulations Part 7, Advisory Committees. Members of the public who desire to provide written or oral input for ACRS Full Committee and Subcommittee meetings may do so and should contact the Designated Federal Official (DFO - listed above) five days prior to the meeting, as practicable. In addition, there will be time allotted at each meeting for the public to provide oral comment.
* Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
* Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting.
 
One (1) electronic copy of each presentation should be emailed to the Desi gnated Federal Official 1 day before the meeting.
 
2}}
2}}

Revision as of 21:44, 19 November 2024

Agenda - Fpd Preliminary Rule 10 CFR Part 53 - Sc - September 23 & 24, 2021
ML21245A207
Person / Time
Issue date: 09/02/2021
From: Derek Widmayer
Advisory Committee on Reactor Safeguards
To:
Widmayer D
References
Download: ML21245A207 (2)


Text

AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Future Plant Designs Subcom mittee Preliminary Rule 10 CFR Part 53, Licensing and Regulation of Advanced Nuclear Reactors :

Subpart B - Technology-Inclusive Safety Requirements 3rd Iteration Subpart C - Requirements for Design and Analysis 3rd Iteration Subpart H - Licenses, Certifications, and Approvals Subpart I - Maintaining and Revising Licensing Basis Information Subpart J - Reporting and Other Administrative Requirements Subpart F - Reqts for Operations ( Staffing, Training, Personnel, Human Factors)

Part 53 - Additional Efforts ROCKVILLE, MARYLAND #

September 23 and 2 4, 2021

  1. The Subcommittee is meeting virtually during the COVID -19 Pandemic. Members of the public should use the following teleconference li ne to listen into the meeting: Teleconference Line: 301 -576-2978; Passcode: 183706321#

Cognizant Staff Engineer / DFO: Derek A Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375

September 23, 202 1

Topic Presenter(s) Time

1. Opening Remarks Dr. David Petti, ACRS 9:3 0 AM - 9:35 AM
2. Staff Introduction John Segala, NRR 9:3 5 AM - 9:4 0 AM

10 CFR Part 53 - Subpart B - Technology-Inclusive Safety Requirements; Subpart C - Requirements for Bill Reckley, NRR

3. Design and Analysis - 3RD ITERATION Nanette Valliere, NRR :4 0 AM - 1:00 PM
  • 9
  • Introduction & Comments Received
  • Revised Preliminary Rule Language Lunch 1:00 PM - 2:00 PM

10 CFR Part 53 - Subpart H - Licenses, Certifications, Bill Reckley, NRR

4. and Approvals Nanette Valliere, NRR 2:00 PM - 3:15 PM
  • Preliminary Rule Language

10 CFR Part 53 - Subpart I - Maintaining and Revising Bill Reckley, NRR 3:15 PM - 4:30 PM

5. Licensing Basis Information Nanette Valliere, NRR
  • Preliminary Rule Language Break 4:30 PM - 4:45 PM
  • A break will be held at a suitable time as determined by the Chairman

(September 23 rd Agenda continues on Page 2)

1 10 CFR Part 53 - Subpart J - Reporting and Other Bill Reckley, NRR

6. Administrative Requirements Nanette Valliere, NRR 4:4 5 PM - 5:50 PM
  • Preliminary Rule Language
7. Discussion SC Members 5:5 0 PM - 6:00 PM Adjourn 6:00 PM

September 24, 2021

Topic Presenter(s) Time

1. Opening Remarks Dr. David Petti, ACRS 9:30 A M - 9:35 AM

Overview: 10 CFR Part 53 - Subpart F - Requirements for Operations, Section 73.750 - General Staffing, Training, Personnel Qualifications, and Human Factors Requirements

Bill Reckley, NRR

2. 10 CFR Part 53 Rulemaking - Additional Efforts Nanette Valliere, NRR 9:35 AM - 12:45 PM *
  • Part 50 Supplement: Technology -inclusive, Deterministic Licensing Framework Option
  • Part 53 Licensing Framework and Subpart Structure
3. Discussion SC Members 12 :45 PM - 1:00 PM

Adjourn 1:00 PM

  • A break will be held at a suitable time as determined by the Chairman

Notes:

  • During the meeting, 301 -415-7360 should be used to contact anyone in the ACRS Office.

dated June 13, 2019, describes procedures to be followed with respect to meetings conducted by the U.S. Nuclear Regulatory Commissions (NRCs) Advisory Committee on Reactor Safeguards (ACRS) pursuant to the Federal Advisory Committee Act (FACA) and NRC implementing regulations found at Title 10 of the Code of Federal Regulations Part 7, Advisory Committees. Members of the public who desire to provide written or oral input for ACRS Full Committee and Subcommittee meetings may do so and should contact the Designated Federal Official (DFO - listed above) five days prior to the meeting, as practicable. In addition, there will be time allotted at each meeting for the public to provide oral comment.

  • Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.

One (1) electronic copy of each presentation should be emailed to the Desi gnated Federal Official 1 day before the meeting.

2