ML21245A207

From kanterella
Jump to navigation Jump to search
Agenda - Fpd Preliminary Rule 10 CFR Part 53 - Sc - September 23 & 24, 2021
ML21245A207
Person / Time
Issue date: 09/02/2021
From: Derek Widmayer
Advisory Committee on Reactor Safeguards
To:
Widmayer D
References
Download: ML21245A207 (2)


Text

AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Future Plant Designs Subcommittee Preliminary Rule 10 CFR Part 53, Licensing and Regulation of Advanced Nuclear Reactors:

Subpart B - Technology-Inclusive Safety Requirements 3rd Iteration Subpart C - Requirements for Design and Analysis 3rd Iteration Subpart H - Licenses, Certifications, and Approvals Subpart I - Maintaining and Revising Licensing Basis Information Subpart J - Reporting and Other Administrative Requirements Subpart F - Reqts for Operations (Staffing, Training, Personnel, Human Factors)

Part 53 - Additional Efforts ROCKVILLE, MARYLAND #

September 23 and 24, 2021

  1. The Subcommittee is meeting virtually during the COVID-19 Pandemic. Members of the public should use the following teleconference line to listen into the meeting: Teleconference Line: 301-576-2978; Passcode: 183706321#

Cognizant Staff Engineer / DFO: Derek A Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 September 23, 2021 Topic Presenter(s) Time

1. Opening Remarks Dr. David Petti, ACRS 9:30 AM - 9:35 AM
2. Staff Introduction John Segala, NRR 9:35 AM - 9:40 AM 10 CFR Part 53 - Subpart B - Technology-Inclusive Safety Requirements; Subpart C - Requirements for Bill Reckley, NRR Design and Analysis - 3RD ITERATION Nanette Valliere, NRR
3. 9:40 AM - 1:00 PM *
  • Introduction & Comments Received
  • Revised Preliminary Rule Language Lunch 1:00 PM - 2:00 PM 10 CFR Part 53 - Subpart H - Licenses, Certifications, Bill Reckley, NRR
4. and Approvals Nanette Valliere, NRR 2:00 PM - 3:15 PM
  • Preliminary Rule Language Break 4:30 PM - 4:45 PM
  • A break will be held at a suitable time as determined by the Chairman (September 23rd Agenda continues on Page 2) 1

10 CFR Part 53 - Subpart J - Reporting and Other Bill Reckley, NRR

6. Administrative Requirements Nanette Valliere, NRR 4:45 PM - 5:50 PM
  • Preliminary Rule Language
7. Discussion SC Members 5:50 PM - 6:00 PM Adjourn 6:00 PM September 24, 2021 Topic Presenter(s) Time
1. Opening Remarks Dr. David Petti, ACRS 9:30 AM - 9:35 AM Overview: 10 CFR Part 53 - Subpart F - Requirements for Operations, Section 73.750 - General Staffing, Training, Personnel Qualifications, and Human Factors Requirements Bill Reckley, NRR 10 CFR Part 53 Rulemaking - Additional Efforts Nanette Valliere, NRR
2. 9:35 AM - 12:45 PM *
  • Part 50 Supplement: Technology-inclusive, Deterministic Licensing Framework Option
  • Part 53 Licensing Framework and Subpart Structure
3. Discussion SC Members 12:45 PM - 1:00 PM Adjourn 1:00 PM
  • A break will be held at a suitable time as determined by the Chairman Notes:
  • During the meeting, 301-415-7360 should be used to contact anyone in the ACRS Office.

dated June 13, 2019, describes procedures to be followed with respect to meetings conducted by the U.S. Nuclear Regulatory Commissions (NRCs) Advisory Committee on Reactor Safeguards (ACRS) pursuant to the Federal Advisory Committee Act (FACA) and NRC implementing regulations found at Title 10 of the Code of Federal Regulations Part 7, Advisory Committees. Members of the public who desire to provide written or oral input for ACRS Full Committee and Subcommittee meetings may do so and should contact the Designated Federal Official (DFO - listed above) five days prior to the meeting, as practicable. In addition, there will be time allotted at each meeting for the public to provide oral comment.

  • Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.

One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting.

2