ML20101S527: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 14: | Line 14: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
Revision as of 21:47, 23 September 2022
| ML20101S527 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 01/30/1985 |
| From: | Corbin McNeil POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20101S530 | List: |
| References | |
| JPN-85-08, JPN-85-8, NUDOCS 8502050476 | |
| Download: ML20101S527 (2) | |
Text
123 Main Street Whrte Rains. New Wrk 10601
. 914*681.6240-
- P> NewWrkPbwer !"!,"f;e?"a g- Authority " * "'o - t="
January 30, 1985 JPN-85-08 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Related to Process Piping Penetrating Primary Containment (JPTS-85-003)
References:
- 1. PASNY letter, J. P. Bayne to D. B. Vassallo, dated May 13, 1983 (JPN-83-42), regarding the same subject.
- 2. NRC letter D. B. Vassallo to J. P. Bayne, dated February 21, 1984, regarding the same subject.
- 3. NYPA letter, J. P. Bayne to D. B. Vassallo, dated March 20, 1984 (JPN-84-18), regarding the same subject.
Dear Sir:
Enclosed for filing are three (3) signed originals and nineteen (19) copies of a document entitled, " Application for Amendment to Operating License", together with forty (40) copies of Attachments I and II thereto, comprising a statement of the proposed changes to Appendix A of the Technical Specifications and the associated Safety Evaluation.
The Authority previously submitted similar changes to the Technical Specifications via Reference 1. In that proposed amendment, Table 3.7-1 (Process Pipeline Penetrating Primary Containment) of Appendix A to the Operating License was corrected to reflect the as-built configuration of the plant.
Subsequent to this submittal, the NRC requested additional information on this proposed amendment via Reference 2.
9 W $
a
s In Reference 3, the Authority withdrew the " Application of Amendment to Operating License" since the changes requested in Reference 1 were to be resubmitted as part of a complete update to Table 3.7-1 of Appendix A. Due to numerous changes involved
-in updating this table, the Authority does not expect to submit a complete revision in the immediate future. Therefore, the Authority resubmits the proposed changes to Table 3.7-1 of the Technical Specifications as presented in Attachment I to the Application for Amendment to the Operating License with this letter. The associated Safety Evaluation for the proposed changes is Attachment II. In addition, this resubmittal incorporates requested information on the proposed changes. A complete update of Table 3.7-1 will be forthcoming in a separate submittal.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated New York State official.
In accordance with 10 CFR 170.12, a check in the amount of
$150.00 is enclosed as the application fee. The Authority pays ,
this fee under protest pending a final determination of the legality of the fee schedule.
If you have any questions regarding the proposed changes, please contact Mr. J. A. Gray, Jr. of my staff.
Very truly yours,
?
h 7*1 Co j f, Y tu '
n A. McNeill, Jr.
Senior Vice President t
Nuclear Generation ENCL.
cc: Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, New York 13093 Mr. J. D. Dunkleberger Division of Policy Analysis and Planning New York State Energy Office Agency Building 2, Empire State Plaza Albany, New York 12223
.