==Dear Mr. Taylor:==
==Dear Mr. Taylor:==


Please find enclosed Revision 1 to the inspection procedure prepared for the purpose ai investigating the emergency diesel generators, which was included with my April 15, 1985 letter.
Please find enclosed Revision 1 to the inspection procedure prepared for the purpose ai investigating the emergency diesel generators, which was included with my {{letter dated|date=April 15, 1985|text=April 15, 1985 letter}}.
A copy of this revision vill be forwarded to each site's Quality Assurance Department as indicated below.
A copy of this revision vill be forwarded to each site's Quality Assurance Department as indicated below.
Sincerely, du H. H. Leusink Vice President, Engineering HHL:sd Attachment cc: Project Manager                                                Nuclear Quality Assurance Nuclear Quality Assurance                                  Public Service Electric & Gas Company Washington Public Power System                            P.O. Box 236 P.O. Box 968                                              Hancock's Bridge, Nov Jersey 08038 Richland, Washington 99352 Quality Assurance Manager Quality Engineering Manager                                Kansas Gas & Electric Company Public Service of Indiana                                  P.O. Box 208 Marble Hill Nuclear Division                              Wichita, Kansas 67201 P.O. Box 190 New Washington, Indiana 47162                              Quality Assurance Manager 8                                                            Union Electric Company PDj4300459 850423                                            P.O. Box 149 S        ADOCK 0500        2                                  St. Louis, Missouri 63166 Louis Allis:                                                            cM 9,/2y (,
Sincerely, du H. H. Leusink Vice President, Engineering HHL:sd Attachment cc: Project Manager                                                Nuclear Quality Assurance Nuclear Quality Assurance                                  Public Service Electric & Gas Company Washington Public Power System                            P.O. Box 236 P.O. Box 968                                              Hancock's Bridge, Nov Jersey 08038 Richland, Washington 99352 Quality Assurance Manager Quality Engineering Manager                                Kansas Gas & Electric Company Public Service of Indiana                                  P.O. Box 208 Marble Hill Nuclear Division                              Wichita, Kansas 67201 P.O. Box 190 New Washington, Indiana 47162                              Quality Assurance Manager 8                                                            Union Electric Company PDj4300459 850423                                            P.O. Box 149 S        ADOCK 0500        2                                  St. Louis, Missouri 63166 Louis Allis:                                                            cM 9,/2y (,

Latest revision as of 03:43, 23 September 2022

Part 21 Rept Forwarding Rev 1 to Insp Procedure for Investigating Emergency Diesel Generators for Fractured Welds on Air Deflectors.Rev Will Be Forwarded to Each Facility
ML20116E848
Person / Time
Site: Salem, Wolf Creek, Columbia, Callaway, 05000000
Issue date: 04/23/1985
From: Leusink H
LOUIS ALLIS CORP. (DIV. OF MAGNETEK, INC.)
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-85, REF-PT21-85-234-000 PT21-85-234, PT21-85-234-000, NUDOCS 8504300459
Download: ML20116E848 (3)


Text

_

ev o ALouisAllis 4 o, m a uap w rc 427 E. Stewart St., P.O. Box 2020, Milwaukee, WI 53201-2020 414-481-6000 TWX 910-262-3115 April 23, 1985 Mr. J. M. Taylor, Director Office on Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington D. C. 20555

Subject:

10CFR 21 Report _

Inspection Procedure Revision

Reference:

H. H. Leusink Letter dated April 15, 1985

Dear Mr. Taylor:

Please find enclosed Revision 1 to the inspection procedure prepared for the purpose ai investigating the emergency diesel generators, which was included with my April 15, 1985 letter.

A copy of this revision vill be forwarded to each site's Quality Assurance Department as indicated below.

Sincerely, du H. H. Leusink Vice President, Engineering HHL:sd Attachment cc: Project Manager Nuclear Quality Assurance Nuclear Quality Assurance Public Service Electric & Gas Company Washington Public Power System P.O. Box 236 P.O. Box 968 Hancock's Bridge, Nov Jersey 08038 Richland, Washington 99352 Quality Assurance Manager Quality Engineering Manager Kansas Gas & Electric Company Public Service of Indiana P.O. Box 208 Marble Hill Nuclear Division Wichita, Kansas 67201 P.O. Box 190 New Washington, Indiana 47162 Quality Assurance Manager 8 Union Electric Company PDj4300459 850423 P.O. Box 149 S ADOCK 0500 2 St. Louis, Missouri 63166 Louis Allis: cM 9,/2y (,

J. Borman D. Bryant >

.-hp >f-%

gg( 3 ' /

M. Buckna M fc A. Giesecke g (p I/0 7 --

H. Schreiber '

~ 7; 19 J. Treibic (T' ' '[c. O I

I k

.,8 .

LO

& w_UISAHISm ., .u ,m

, y-M9537 - 4/82 ar; ENGINEERING REPORT rite NUMBER dk ALTERNATORS CONTROLS ROTARY COMPRESSORS ATE R EFE R ENCE 10CFR 21 - Emergency Stand By Generators gy4 ) 9\ 399q PREPARED BY N>

5* APPROVED Sus;ECT Inspection Procedures for Fractured Welds on BY H. H. Leusink Air Deflectorn The purpose of this instruction is to outline a procedure for the visual inspection of the emergency standby generators referenced for possible i fractured or cracked velds.

By copy of this communication, we are requesting the site Quality Assurance Group make this inspection and to report back their findings to:

. Mr. Herbert A. Schreiber 3 Manager Customer Service Louis Allis Division MagneTek, Inc.

427.E. Steuart St.

P.O. Box 2020 Miluaukee, Wisconsin 53201-2020 j Telephone: 414/481-6000 X289 3

f, The procedure is as follous:

ji 1. Remove the protective screens from each end of the generator coil guards as indicated on the attached Sketch A.

?)~.

Ui g 2. Visually inspect the fillet veld securing the conical air TO deflector that is velded to the three piece coil guards.

t!! The air deflector is secured to the coil guard by a 3/16" T fillet veld, 1" long on centers of 4". There vill be F.c approximately sixty (60) of these velds around the

=, g[ circumference of this joint.

ww.

siI All findings should be. reported immedia'.ely to the Manager of Customer

'5 E . Service at Louis Allis.

  • Se M

3S~

3 3

Mi R

Y 3

~ kE o

55 di 04

a s. t

&LOUISAillS m->a uu*+ ssEET 2 OF 2 SO[*

, M9537 - 4/82 ENGINEERING REK;RT rile NUMBER 41!

dk ALTERNATOR.S - CONTROLS - ROTARY COMPRESSORS

.~ DATE April 15, 1985

( F5 REFERENCE 10CFR 21 - Emergency Stand By Generators W4 NUMBER PREPARED BY E

SUBJECT Inspection Procedure for Fractured Welds on ^$ PROVED Air Deflectors 5 pirsce 3 PIEde cou. Gu c e D i cost Gu AeD segegNS

.ScRestas Y -

' a 1 l I i

. I g a - - - -

i

, i s c~

5 me veracra ", ~ -

g u

lg v \ n o

p.. - .~

/

9 "'

3

/

/ /'

/

\

s g . 4,g/.tB V lN' A

/

[ \ ,

j \ \ l

' W DM,

/

l s i i /

/

! ' \ l

.\ ,/ i y

8 s \ ,,, , / .

COlk /'

'i Giu A R.D s '-

opu r 2  %

6 5 .

I i5 1 ,

<s