ENS 55878: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 21: Line 21:
As a result of the Loss of Power on the Unit 3 Train B 4.16 kV Class 1E Bus, the B Auxiliary Feedwater Pump automatically started, as expected. The B Auxiliary Feedwater Pump was not needed for steam generator level control and no auxiliary feedwater valves repositioned. The B Auxiliary Feedwater Pump did not supply feedwater to the steam generators.
As a result of the Loss of Power on the Unit 3 Train B 4.16 kV Class 1E Bus, the B Auxiliary Feedwater Pump automatically started, as expected. The B Auxiliary Feedwater Pump was not needed for steam generator level control and no auxiliary feedwater valves repositioned. The B Auxiliary Feedwater Pump did not supply feedwater to the steam generators.
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of emergency AC electrical power systems and an auxiliary feedwater system.
This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of emergency AC electrical power systems and an auxiliary feedwater system.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220506en.html#en55878
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220509en.html#en55878
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 06:30, 9 May 2022

ENS 55878 +/-
Where
Palo Verde 
Arizona (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000529/LER-2022-001
Emergency Diesel Generator Actuation on Loss of Offsite Power to Class 4.16 Kv Buses
Time - Person (Reporting Time:+1.58 h0.0658 days <br />0.0094 weeks <br />0.00216 months <br />)
Opened: Joshua Mcdowell
04:30 May 5, 2022
NRC Officer: Brian P. Smith
Last Updated: May 5, 2022
55878 - NRC Website
Loading map...