Browse wiki

Jump to navigation Jump to search
100  +
The following information was provided by The following information was provided by the licensee via email:</br>At 1955 on May 4, 2022, a start-up transformer de-energized, resulting in a loss of power to the Unit 2 Train A 4.16 kV Class 1E Bus and the Unit 3 Train B 4.16 kV Class 1E Bus. The Unit 2 Train A Emergency Diesel Generator (EDG) and Unit 3 Train B EDG automatically started and energized their respective 4.16 kV Class 1E Buses.</br>As a result of the Loss of Power on the Unit 3 Train B 4.16 kV Class 1E Bus, the B Auxiliary Feedwater Pump automatically started, as expected. The B Auxiliary Feedwater Pump was not needed for steam generator level control and no auxiliary feedwater valves repositioned. The B Auxiliary Feedwater Pump did not supply feedwater to the steam generators.</br>This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of emergency AC electrical power systems and an auxiliary feedwater system.systems and an auxiliary feedwater system.  +
02:55:00, 5 May 2022  +
55,878  +
04:30:00, 5 May 2022  +
02:55:00, 5 May 2022  +
The following information was provided by The following information was provided by the licensee via email:</br>At 1955 on May 4, 2022, a start-up transformer de-energized, resulting in a loss of power to the Unit 2 Train A 4.16 kV Class 1E Bus and the Unit 3 Train B 4.16 kV Class 1E Bus. The Unit 2 Train A Emergency Diesel Generator (EDG) and Unit 3 Train B EDG automatically started and energized their respective 4.16 kV Class 1E Buses.</br>As a result of the Loss of Power on the Unit 3 Train B 4.16 kV Class 1E Bus, the B Auxiliary Feedwater Pump automatically started, as expected. The B Auxiliary Feedwater Pump was not needed for steam generator level control and no auxiliary feedwater valves repositioned. The B Auxiliary Feedwater Pump did not supply feedwater to the steam generators.</br>This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of emergency AC electrical power systems and an auxiliary feedwater system.systems and an auxiliary feedwater system.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 5 May 2022  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:30:11, 9 May 2022  +
04:30:00, 5 May 2022  +
false  +
0.0658 d (1.58 hours, 0.0094 weeks, 0.00216 months)  +
02:55:00, 5 May 2022  +
Valid Actuation of Unit 2 and Unit 3 Emergency Diesel Generators and Unit 3 Auxiliary Feedwater Pump  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +  and 3  +