| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | ||
| page count = 2 | | page count = 2 | ||
| project = TAC:56813 | |||
| stage = Approval | |||
}} | }} | ||
Revision as of 02:21, 13 December 2021
| ML20138E085 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/10/1985 |
| From: | Butcher E Office of Nuclear Reactor Regulation |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20138E091 | List: |
| References | |
| TAC-56813, NUDOCS 8510240570 | |
| Download: ML20138E085 (2) | |
Text
,
e l * '" October 10, 1985 e DISTRIBUTION:
Docket No. 50-344 N J ACRS 10 NRC PDR Gray File L PDR l
ORB #3 Rdg Mr. Bart D. Withers HThompson Vice President Nuclear OELD Portland General Electric Company EJordan 121 S. W. Salmon Street BGrimes j Portland, Oregon 97204 JPartlow Llazo l
Dear Mr. Withers:
PMKreutzer l
SUBJECT:
VALVE M0-8812 TEST PARAMETERS l
f Enclosed is the staff's Safety Evaluation addressing your request to change the test parameters used in leak testing valve M0-8812.
Based on the more accurate measurements that will be obtained by using water as a test medium, the staff concludes that changing the test medium for valve M0-8812 from gas to water is acceptable.
l Based'on Portland General Electric's analysis and the staff's review of the '
analysis, we conclude that 33.6 psi differential pressure across the valve is "
.a suitably conservative test pressure for valve M0-8812 and is therefore t acceptable.
Sincerely, ;
/s/
Edward J. Butcher, Acting Chief l Operating Reactors Branch #3 ,
Division of Licensing ;
Enclosure:
Safety Evaluation cc w/ enclosure See next page ,
l l
2 "2882 81484 P PDR 6 ,
) Kreutzer Llazoidd EJ6utther p//85 /9/1/85 le/q/85
r i
Mr. Bart D. Withers Portland General Eletric Company Trojan Nuclear Plant cc: ?I Senior Resident Inspector T l
U.S. Nuclear Regulatory Commission T Trojan Nuclear Plant l Post Office Box 0 Rainier, Oregon 97048 i
Robert M. Hunt, Chairman ,
Board of County Commissioners Columbia County St. Helens, Oregon 97501
- 't William T. Dixon
- Oregon Department of Energy -
Labor and Industries Building Room 111 g' ,__
Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Office of Executive Director for Operations ,
1450 Maria Lane, Suite 210 Walnut Creek, California 94596 a
1 J
~L