ML20138E085

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Addressing Request to Change Test Parameters Used in Leak Testing Valve MO-8812.Changing Test Medium for Valve from Gas to Water & 33.6 Psi Differential Pressure Acceptable
ML20138E085
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/10/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20138E091 List:
References
TAC-56813, NUDOCS 8510240570
Download: ML20138E085 (2)


Text

,

e l

October 10, 1985 DISTRIBUTION:

e Docket No. 50-344 N J ACRS 10 NRC PDR Gray File L PDR l

ORB #3 Rdg Mr. Bart D. Withers HThompson Vice President Nuclear OELD Portland General Electric Company EJordan 121 S. W. Salmon Street BGrimes j

Portland, Oregon 97204 JPartlow Llazo l

Dear Mr. Withers:

PMKreutzer l

l

SUBJECT:

VALVE M0-8812 TEST PARAMETERS f

Enclosed is the staff's Safety Evaluation addressing your request to change the test parameters used in leak testing valve M0-8812.

Based on the more accurate measurements that will be obtained by using water as a test medium, the staff concludes that changing the test medium for valve M0-8812 from gas to water is acceptable.

l Based'on Portland General Electric's analysis and the staff's review of the analysis, we conclude that 33.6 psi differential pressure across the valve is

.a suitably conservative test pressure for valve M0-8812 and is therefore t

acceptable.

Sincerely,

/s/

Edward J. Butcher, Acting Chief l

Operating Reactors Branch #3 Division of Licensing

Enclosure:

Safety Evaluation cc w/ enclosure See next page l

l 2 "2882 81484 6 P

PDR OR[ L ORB #3:DL ORB #3:D

) Kreutzer Llazoidd EJ6utther p//85

/9/1/85 le/q/85

i r

Mr. Bart D. Withers Portland General Eletric Company Trojan Nuclear Plant

?I cc:

l Senior Resident Inspector T

U.S. Nuclear Regulatory Commission T

Trojan Nuclear Plant l

Post Office Box 0 Rainier, Oregon 97048 i

Robert M. Hunt, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501

't William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 g',__

Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 a

1 J

~L

-