ML20141E580: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 37: Line 37:
of Practice for Domestic Licensing Proceedings and Issuance of Orders," of                                q Title 10 of the Code of Federa7 Recu7atfons (10 CFR Part 2.790). The staff                                  i has concluded that each item that Lucent requested to be withheld from public                              )
of Practice for Domestic Licensing Proceedings and Issuance of Orders," of                                q Title 10 of the Code of Federa7 Recu7atfons (10 CFR Part 2.790). The staff                                  i has concluded that each item that Lucent requested to be withheld from public                              )
disclosure in the subject NRC Inspection report meets the threshold delineated                              j in 10 CFR Part 2.790. A copy of the nonproprietary (public) version of the subject report is enclosed.                                                                                :
disclosure in the subject NRC Inspection report meets the threshold delineated                              j in 10 CFR Part 2.790. A copy of the nonproprietary (public) version of the subject report is enclosed.                                                                                :
                 ' Additionally, thank you for your April 24, 1997, letter in resporise to the                                1 l                Notice of Nonconformance (NON) that was attached to the subject inspection                                  i report. We have reviewed your letter and find that your reply to the NON is                                '
                 ' Additionally, thank you for your {{letter dated|date=April 24, 1997|text=April 24, 1997, letter}} in resporise to the                                1 l                Notice of Nonconformance (NON) that was attached to the subject inspection                                  i report. We have reviewed your letter and find that your reply to the NON is                                '
responsive to our concern. We will review the implementation of your                                        l corrective actions during a future U.S. Nuclear Regulatory Commission staff                                  1 inspection to determine that full compliance has been achieved and will be                                  l maintained. We have no further questions at this time and will review the
responsive to our concern. We will review the implementation of your                                        l corrective actions during a future U.S. Nuclear Regulatory Commission staff                                  1 inspection to determine that full compliance has been achieved and will be                                  l maintained. We have no further questions at this time and will review the
: i.              corrective action and preventative measures which Lucent has taken during a future inspection.                                                                                        I 1
: i.              corrective action and preventative measures which Lucent has taken during a future inspection.                                                                                        I 1

Latest revision as of 12:06, 12 December 2021

Responds to 970424 Request by Lucent Technologies,Inc to Withhold Certain Info from Insp Rept 99901309/96-01 IAW 10CFR2.790.Copy of Nonproprietary Version of Subj Insp Rept Encl
ML20141E580
Person / Time
Issue date: 05/15/1997
From: Gallo R
NRC (Affiliation Not Assigned)
To: Jackson P
AFFILIATION NOT ASSIGNED
Shared Package
ML20141E582 List:
References
REF-QA-99901309 99901309-96-01, 99901309-96-1, NUDOCS 9705210043
Download: ML20141E580 (2)


Text

._>. _._ _ .___.__.... _ _.-.__.__ _ ____._.______

]

I o gv5"%

j fa unirso sr4Tes <

g-

,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2005Ho01 i

\, gg */ May 15, 1997 i i

l Mrs. Pamela B. Jackson, Vice President j l Systems Business Unit i

! Lucent Technologies, Incorporated i

! Microelectronics Group l l 3000 Skyline Drive Mes'quite, Texas 75149 I

SbBJECT: LUCENT'S' APRIL 24, 1997 APPLICATION FOR WITHHOLDING PURSUANT T0 fl 10 CFR 2.790 REGARDING NRC INSPECTION REPORT 99901309/96-01

Dear Mrs. Jackson:

l r .

i This. letter is to inform you that the U.S. Nuclear Regulatory Commission (NRC) i staff has finished reviewing and. deliberating on the April 24, 1997, request l

! by Lucent Technologies, Incorporated (Lucent), to withhold certain information j from NRC Inspection Report 99901309/96-01 in accrdance with Section 2.790, i

! "Public inspecilons, exemptions, requests for withholding," of Part 2, " Rules >

of Practice for Domestic Licensing Proceedings and Issuance of Orders," of q Title 10 of the Code of Federa7 Recu7atfons (10 CFR Part 2.790). The staff i has concluded that each item that Lucent requested to be withheld from public )

disclosure in the subject NRC Inspection report meets the threshold delineated j in 10 CFR Part 2.790. A copy of the nonproprietary (public) version of the subject report is enclosed.  :

' Additionally, thank you for your April 24, 1997, letter in resporise to the 1 l Notice of Nonconformance (NON) that was attached to the subject inspection i report. We have reviewed your letter and find that your reply to the NON is '

responsive to our concern. We will review the implementation of your l corrective actions during a future U.S. Nuclear Regulatory Commission staff 1 inspection to determine that full compliance has been achieved and will be l maintained. We have no further questions at this time and will review the

i. corrective action and preventative measures which Lucent has taken during a future inspection. I 1

In accordance with 10 CFR 2.790 of the NPC's " Rules of Practice," a copy of j i this letter and its enclosures will be p' laced in the NRC's Public Document '

l Room (POR). g i

hY '

l

- \_ ) rfh3 i L 200063 gf l [c%0*h l

[ NilC FILE CENTEll COPY i d(

1 9705210043 970515 l PDR GA999 ENV*****

99901309 PDR

__.____ _ ~_ _ i

, e

'l Mrs. Pamela B. Jackson '

i Should you have any questions concerning the issues discussed in this letter, I we will be pleased to discuss them with you.

Sincerely, original signed by Robert M. Gallo, Chief l Special Inspection Branch i Division of Inspection and Support Programs l Office of Nuclear Reactor Regulation Docket No.: 99901309 I

Enclosure:

Inspection Report 93901309/96-01 w/ enclosures l

l cc: Mrs. Maureen O'Brien, Director

! Development & Engineering Lucent Technologies 3000 Skyline Drive Mesquite, Texas, 75149 Mr. Augustus J. Donnell, Director Quality Assurance Lucent Technologies 3000 Skyline Drive Mesquite, Texas, 75149 Distribution: FPGillespie GClainas BABoger SNSaba SDAlexander RAGramm LLCampbell GDick-Braidwood VNerses-McGuire REaton-0yster Creek JClifford-Palo Verde JStone-Wolf Creek BRogers PSIB R/F Central Files Docket Files / RIDS IE:09/PDR l

l ** See previous concurrence.

l DOCUMENT NAME: G: TRO\IR-LUC. PUB To receive a copy of tNo nt, indicate in the box: 'C" = Copy without enclosures *E* = Copy with enclosures *N* = No copy 0FFICE PSIB:DISA / l # PSIlf9189 l E OGC l f, PSIBfDT19 ld l JJPetrds% l NAME GCJMLLtna MPSiemen (W P RMGaflo

, DATE 5/15/97/ N 5/ /) /97 5/ : 6 /97 5/ [S /97 _

, 0FFICIAL RIECORD COPY g

-